FY 2022 75% CIP Publication Available / Homepage / By Cassandra Viscarra The IAC is required to approve 75% of the preliminary school construction allocation by December 31 each year. At their meeting on December 10, 2020, the IAC approved the FY 2022 75% CIP.https://iac.mdschoolconstruction.org/?page_id=498The CIP Publication is now available to view and download here.