The Aging Schools Program Prior Year Approvals
FY 2020-2023
ASP 20-23
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | Local ASP Approved | State ASP Approved | State/Local Cost Share |
---|---|---|---|---|---|---|---|---|---|---|
2020 | Montgomery | 15.013.20 | Germantown Elementary | Floor Replacement | Replacement of VCT gym floor with RobinWood Sport Wood Flooring System. | $ 72,572 | $ 72,572 | 0 | $ 72,572 | |
2020 | Baltimore City | 30.178.20 | Baltimore School for the Arts #415 | Domestic Water Pumps Replacement | Replace Domestic water booster pumps. | $ 42,040 | $ 42,040 | 0 | $ 33,691 | |
2020 | Carroll | 06.042.20 | Westminster High | Flooring | Refinish the gym floor. | $ 29,400 | $ 24,124 | 0 | $ 24,124 | |
2020 | Talbot | 20.008.20 | St. Michael M/H | Outdoor Stadium Bleacher | Bleacher Replacement. | $ 39,700 | $ 39,700 | $ 39,700 | ||
2020 | Frederick | 10.040.20 | Monocacy Elementary | Fire Alarm Replacement | Replacement of the schools fire alarm system. | $ 106,500 | $ 89,534 | $ 16,966 | $ 89,534 | |
2020 | Baltimore City | 30.067.20 | Lockerman-Bundy Elementary #261 | Storage Tank | Add Above Ground Storage Tank for Boiler Operation. | $ 71,000 | $ 71,000 | 0 | $ 70,600 | |
2020 | Wicomico | 22.015.20 | Wicomico Middle | Gym Floor Refinishing | Sand and refinish the Main Gym Floor and the Auxiliary Gym Floor. | $ 28,711 | $ 28,711 | $ 28,711 | ||
2020 | Charles | 08.015.20 | Piccowaxen Middle | Power Conditioning Panel | Add a Power Conditioning Panel to balance the electrical usage and be compatible with the Local Utility Agency (SMECO). | $ 50,000 | $ 50,000 | $ 3,400 | $ 50,000 | |
2020 | Carroll | 06.052.20 | Winters Mill High | Outdoor Track Surface | Replace surface. | $ 34,040 | $ 34,040 | 0 | $ 34,040 | |
2020 | Queen Anne's | 17.023.20 | Kent Island High | PA Replacement | Replace the twenty-one year old PA system | $ 50,000 | $ 50,000 | 0 | $ 50,000 | |
2020 | Harford | 12.020.20 | C. Milton Wright High | Parking Lot Pole | Parking lot light replacement. | $ 18,950 | $ 18,950 | 0 | $ 18,950 | |
2020 | Harford | 12.014.20 | Edgewood Middle | Stage Partition Replacement | Replace the manual stage folding partition. | $ 22,000 | $ 22,000 | $ 22,000 | ||
2020 | Dorchester | 09.001.20 | Sandy Hill Elementary | Access Control System | Installation of network integrated access control on all primary perimeter entry/exit points used by students, teachers and staff and the public. | $ 38,982 | $ 38,982 | $ 690 | $ 38,292 | |
2020 | Caroline | 05.009.20 | Career and Technology Center | Parking Lot Coating | Coating of the parking lot & fixing cracks. | $ 12,400 | $ 12,400 | 0 | $ 12,375 | |
2020 | Harford | 12.001.20 | Fallston High | Wall Repair | Repair the exterior masonry wall. | $ 176,888 | $ 176,888 | 0 | $ 176,888 | |
2020 | Carroll | 06.045.20 | Linton Springs Elementary | PA System | Replace existing PA system. | $ 16,882 | $ 16,882 | 0 | $ 16,882 | |
2020 | Carroll | 06.015.20 | Freedom Elementary | PA System | Replace existing PA system. | $ 15,882 | $ 15,882 | 0 | $ 15,882 | |
2020 | Carroll | 06.022.20 | Hampstead Elementary | PA System | Replace existing PA system. | $ 15,882 | $ 15,882 | 0 | $ 15,882 | |
2020 | Anne Arundel | 02.042.20 | Southern Middle | Elevator Replacement | The request is to replace the Elevator (AA1524 or Elevator "A") | $ 290,000 | $ 289,702 | $ 374 | $ 289,664 | |
2020 | Baltimore County | 03.163.20 | Sussex Elementary | Boiler Replacement | Replace Boiler. | $ 535,000 | $ 379,876 | $ 155,124 | $ 379,876 | |
2020 | Baltimore City | 30.168.20 | Booker T. Washington Building #130 | Sidewalk Replacement | Replace Sidewalk. | $ 82,916 | $ 82,916 | 0 | $ 82,916 | |
2020 | Baltimore County | 03.015.20 | Rosedale Center | Boiler Replacement | Replace Boiler. | $ 760,000 | $ 500,000 | $ 2,160,000 | $ 500,000 | |
2020 | Cecil | 07.022.20 | Rising Sun High | Boiler Valve Replacement | The request is to replace boiler valve. | $ 12,300 | $ 12,300 | 0 | $ 11,927 | |
2020 | Baltimore City | 30.257.20 | Callaway Elementary #251 | Sidewalk Replacement and Concrete Fixtures | Replace Sidewalk, concrete apron, dumpster pad, curb, gutter and knee wall in parking lot. | $ 136,681 | $ 136,681 | 0 | $ 136,681 | |
2020 | Baltimore City | 30.226.20 | Mergenthaler Vocational-Technical High #410 | Sidewalk Replacement & Parking Lot Repavement | Replace concrete sidewalks and repave parking lots. | $ 211,243 | $ 211,243 | 0 | $ 211,200 | |
2020 | Carroll | 06.054.20 | Shiloh Middle | PA System | Replace existing PA system. | $ 19,000 | $ 19,000 | 0 | $ 19,000 | |
2020 | St. Mary's | 18.022.20 | Green Holly Elementary | Life Safety Communications System | Installation of a system-wide standard Life Safety Communications System | $ 110,000 | $ 50,074 | $ 59,926 | $ 50,074 | |
2020 | Baltimore City | 30.188.20 | Walbrook Building #411 | Sidewalk Replacement | Replace sidewalk. | $ 140,550 | $ 140,550 | 0 | $ 140,550 | |
2020 | Wicomico | 22.002.20 | Pinehurst Elementary | VCT Flooring | Strip and remove all VCT and carpeting. Then replace with new VCT flooring. | $ 26,956 | $ 26,956 | $ 26,956 | ||
2020 | Wicomico | 22.001.20 | Parkside High | VCT Flooring | Remove the carpet, fritz tile, and VCT flooring. Then replace with new VCT flooring. | $ 22,684 | $ 22,684 | $ 22,684 | ||
2020 | Wicomico | 22.009.20 | Wicomico High | VCT Flooring Installation | Replace VCT carpeting with VCT flooring. | $ 14,207 | $ 13,810 | $ 13,810 | ||
2020 | Caroline | 05.009.20 | Career and Technology Center | Hallway Extension | Currently some students have to go outside in order to access two classrooms. This hallway extension will connect two existing hallways thus increasing student safety and security of the building. | $ 46,000 | $ 37,714 | $ 8,276 | $ 37,714 | |
2020 | Kent | 14.003.20 | Kent County Middle | Repave parking lot area | Parking Lot Repaving | $ 91,503 | $ 91,503 | 0 | $ 91,503 | |
2020 | Baltimore City | 30.129.20 | George G. Kelson Building #157 | Install CCTV & New Surveillance System | Install a new cctv and video surveillance system. | $ 39,215 | $ 39,215 | 0 | $ 39,215 | |
2020 | Baltimore County | 03.032.20 | Randallstown High | Generator Replacement | Replace Generator | $ 300,000 | $ 210,500 | $ 89,500 | $ 210,500 | |
2020 | Carroll | 06.029.20 | Sykesville Middle | Flooring | Refinish the gym floor. | $ 15,421 | $ 15,421 | 0 | $ 15,421 | |
2020 | Baltimore County | 03.165.20 | Overlea High | Flooring Replacement | Replace gym floor. | $ 370,000 | $ 159,624 | $ 210,376 | $ 159,624 | |
2020 | Montgomery | 15.101.20 | Highland View Elementary | Trash Compactor Replacement | Replace the 25 year old trash compactor. | $ 11,267 | $ 11,267 | 0 | $ 11,267 | |
2020 | Montgomery | 15.045.20 | Magruder High | Trash Compactor Replacement | Replacement of the 10T trash compactor that was originally installed in 1989. | $ 14,576 | $ 14,576 | 0 | $ 14,576 | |
2020 | Montgomery | 15.066.20 | Poolesville High | Trash Compactor Replacement | Replace the malfunctioning 10T Trash compactor. | $ 14,576 | $ 14,576 | 0 | $ 14,576 | |
2020 | Montgomery | 15.135.20 | Sherwood High | Trash Compactor Replacement | Replace the 10T trash compactor. | $ 14,576 | $ 14,576 | 0 | $ 14,576 | |
2020 | Montgomery | 15.157.20 | Stone Mills Elementary | Trash Compactor Replacement | Replace the 1988 450SS Trash compactor. | $ 11,267 | $ 11,267 | 0 | $ 11,184 | |
2020 | Montgomery | 15.173.20 | Rockwell Elementary | Asphalt Resurfacing | Resurface the 27 year old original asphalt surface and line painting, project areas includes driveways, bus loop, parking and play areas. | $ 78,000 | $ 78,000 | 0 | $ 83,742 | |
2020 | Montgomery | 15.214.20 | Cedar Grove Elementary | Asphalt Resurfacing | Repair and resurface asphalt surface and line painting/marking. (Driveways and parking areas) | $ 65,000 | $ 65,000 | 0 | $ 64,365 | |
2020 | Montgomery | 15.249.20 | Piney Branch Elementary | Bleacher Replacement | Replace the manually operated wooden bleachers. | $ 44,900 | $ 44,900 | 0 | $ 44,900 | |
2020 | Montgomery | 15.158.20 | Quince Orchard High | Wall Replacement | Replace gym divider wall. | $ 95,500 | $ 95,500 | 0 | $ 95,500 | |
2020 | Montgomery | 15.275.20 | Shady Grove Middle | Water Heater Replacement | Replace the 24 year old domestic water heater system with two-100 gallons new water heaters. | $ 85,000 | $ 85,000 | 0 | $ 73,110 | |
2020 | Montgomery | 15.166.20 | Watkins Mill High | Gym Divider Wall Replacement | Replace the 30 year old gym divider. | $ 95,500 | $ 95,500 | 0 | $ 95,500 | |
2020 | Montgomery | 15.013.20 | Germantown Elementary | Gym Floor Replacement | Replacement of VCT gym floor with RobinWood Sport Wood Flooring System. | $ 72,572 | $ 72,572 | 0 | $ 72,572 | |
2020 | Calvert | 04.017.20 | Plum Point Middle | Partial Intercom Replacement | Replace the intercom head end equipment, administration desk units, and rewire head end into existing system. | $ 24,988 | $ 24,988 | $ 24,988 | ||
2020 | Calvert | 04.007.20 | Mt. Harmony Elementary | Partial Intercom Replacement | Replace the intercom head end equipment, administration desk units, and rewire the equipment into the existing system. | $ 20,934 | $ 13,994 | $ 6,940 | $ 13,994 | |
2020 | Frederick | 10.064.20 | Thurmont Primary | Envelope Repair/Water Infiltration | To address water infiltration thru the falling masonry assemblies. The work will include demolition of the exterior skin and cavity interstitial materials and replacement with new materials. | $ 99,847 | $ 99,847 | 0 | $ 99,847 | |
2020 | Somerset | 19.004.20 | Crisfield High | Intercom Replacement/New VOIP System | Replace the existing phone system at Crisfield High school with a new VOIP system to include phones in every classroom. Also, reconfigure/replace the existing intercom system and integrate a new PA system and master clock with the new VOIP phone system. | $ 18,017 | $ 18,017 | 0 | $ 18,017 | |
2020 | Somerset | 19.014.20 | Greenwood Elementary | Intercom Replacememt/New VOIP System | Replace the existing phone system school with a new VOIP system to include phones in every classroom. Also, reconfigure/replace the existing intercom system and integrate a new PA system and master clock with the new VOIP phone system. | $ 17,415 | $ 17,415 | 0 | $ 17,415 | |
2020 | Cecil | 07.020.20 | Perryville Elementary | Playground Restoration | Restore existing deteriorated playground not associated with recent interior renovations | $ 16,000 | $ 16,000 | 0 | $ 14,399 | |
2020 | Cecil | 07.031.20 | Cecilton Elementary | Flooring Replacement | Replace deteriorated VCT flooring in 5 existing classrooms. | $ 11,000 | $ 11,000 | 0 | $ 10,670 | |
2020 | Cecil | 07.011.20 | Thomson Estates Elementary | Flooring Replacement | Replace existing deteriorating VCT flooring in 5 classrooms | $ 11,500 | $ 11,500 | 0 | $ 11,020 | |
2020 | Cecil | 07.037.20 | Holly Hall Elementary | Flooring Replacement | Replace existing deteriorating VCT flooring in 5 classrooms. | $ 12,500 | $ 12,500 | 0 | $ 12,271 | |
2020 | Cecil | 07.034.20 | Bainbridge Elementary | Sidewalk Replacement | Replace and repair deteriorating exterior sidewalks in various locations. | $ 13,000 | $ 13,000 | 0 | $ 12,744 | |
2020 | Baltimore City | 30.041.20 | North Bend PK-8 #081 | Playground | Removal and site preparation for installation of new playground to include rubber surface. | $ 43,200 | $ 43,200 | $ 43,200 | ||
2020 | Baltimore City | 30.276.20 | Bragg Nature Study Center | CCTV Cameras | Provide DVR and CCTV cameras to monitor teaching areas, farm and property. | $ 17,500 | $ 17,500 | 0 | $ 15,869 | |
2020 | Wicomico | 22.007.20 | Delmar Elementary | Bathrooms Epoxy Floor Finish | Installation of a new epoxy floor finish. | $ 25,500 | $ 25,500 | $ 25,500 | ||
2020 | Baltimore City | 30.260.20 | Barclay PK-8 #054 | Flooring Replacement | Remove and install existing gym floor. | $ 78,074 | $ 78,074 | 0 | $ 78,074 | |
2020 | Anne Arundel | 02.049.20 | Shipley's Choice Elementary | Door Replacement | Replace folding doors located between the Gym and Cafeteria. | $ 52,000 | $ 52,000 | 0 | $ 52,000 | |
2020 | Baltimore City | 30.195.20 | Beechfield PK-8 #246 | Flooring Replacement | Replace the gym floor. | $ 63,577 | $ 63,577 | $ 63,577 | ||
2020 | Baltimore City | 30.159.20 | Maree G. Farring PK-8 #203 | Concrete Replacement | Remove /replace existing sidewalk in identified areas | $ 26,700 | $ 26,700 | 0 | $ 26,680 | |
2020 | Baltimore City | 30.127.20 | Rosemont PK-8 #063 | Asphalt & Concrete Replacement | Replace asphalt & concrete. | $ 77,000 | $ 77,000 | 0 | $ 77,000 | |
2020 | Cecil | 07.024.20 | Elk Neck Elementary | Air Conditioning Replacement | Air Conditioner Replacement | $ 14,600 | $ 14,600 | 0 | $ 13,310 | |
2020 | Cecil | 07.034.20 | Bainbridge Elementary | Boiler Controls Replacment | Upgrade/Replace both boilers. | $ 15,250 | $ 15,250 | 0 | $ 14,850 | |
2020 | Cecil | 07.041.20 | Leeds Elementary | Boiler Supply Line Upgrade | The request is to upgrade the boiler supply line. | $ 14,850 | $ 13,509 | 0 | $ 13,509 | |
2020 | Anne Arundel | 02.068.20 | Southern High | Door Replacement | Replace exterior doors and frames. | $ 262,600 | $ 164,336 | $ 98,262 | $ 164,336 | |
2020 | Baltimore City | 30.195.20 | Beechfield PK-8 #246 | Basketball Court Asphalt Repair | Repair the playgrounds and basketball court asphalt. | $ 34,935 | $ 34,935 | 0 | $ 34,935 | |
2020 | Baltimore County | 03.112.20 | Joppa View Elementary | Intercom System Replacement | Replace intercom system. | $ 140,000 | $ 125,000 | $ 15,000 | $ 125,000 | |
2020 | Baltimore County | 03.123.20 | Cromwell Valley Elementary | Intercom System Replacement | Replace intercom system. | $ 140,041 | $ 108,041 | $ 32,000 | $ 108,041 | |
2020 | Baltimore County | 03.004.20 | Fullerton Elementary | Intercom System Replacement | Replace intercom system. | $ 140,000 | $ 100,000 | $ 40,000 | $ 100,000 | |
2020 | Baltimore City | 30.110.20 | Baltimore City College High #480 | Plumbing | Replace existing domestic water booster pumps. | $ 49,450 | $ 49,450 | 0 | $ 49,450 | |
2020 | Washington | 21.031.20 | Williamsport High | Domestic Water Line Replacement | Domestic Water Line Replacement | $ 150,000 | $ 134,904 | $ 15,096 | $ 134,904 | |
2020 | Howard | 13.079.20 | Bryant Woods Elementary | Playground Equipment | Playground Replacement. | $ 92,000 | $ 87,776 | $ 92,000 | $ 87,776 | |
2020 | Baltimore City | 30.096.20 | Hamilton PK-8 #236 | Flooring Replacement | Replace VCT Flooring | $ 44,000 | $ 44,000 | 0 | $ 40,187 | |
2020 | Baltimore City | 30.204.20 | Dr. Bernard E. Harris, Sr. Elementary #250 | Storm Drain Replacement | Remove and replace new sections of collapsed storm water line. | $ 72,750 | $ 72,750 | 0 | $ 44,214 | |
2020 | Kent | 14.007.20 | Kent County High | Intercom Replacement | Intercom System Replacement | $ 5,285 | $ 5,285 | 0 | $ 5,285 | |
2020 | Prince George's | 16.208.20 | G. James Gholson Middle | Generator Replacement | Existing Generator Replacement | $ 128,000 | $ 128,000 | 0 | $ 128,000 | |
2020 | Prince George's | 16.133.20 | Kingsford Elementary | Generator Replacement | Existing Generator Replacement | $ 100,000 | $ 100,000 | 0 | $ 100,000 | |
2020 | Prince George's | 16.234.20 | Lake Arbor Elementary School | Generator Replacement | Existing Generator Replacement | $ 100,000 | $ 100,000 | 0 | $ 100,000 | |
2020 | Prince George's | 16.241.20 | Lamont Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.112.20 | Robert Frost Elementary School | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.135.20 | Magnolia Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.205.20 | Allenwood Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.123.20 | Barnaby Manor Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.189.20 | Beacon Heights Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.142.20 | Carollton Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Prince George's | 16.117.20 | Dodge Park Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | 0 | $ 134,000 | |
2020 | Baltimore City | 30.096.20 | Hamilton PK-8 #236 | Playground Equipment | Removal and disposal of existing playground equipment and installation of new playground equipment and a rubber surface system. | $ 36,810 | $ 36,810 | 0 | $ 36,810 | |
2020 | Baltimore City | 30.042.20 | William Paca E #83 | Playground Equipment | Removal and disposal of existing playground equipment and relocate and install new playground equipment and a rubber surface system to another area on the school site. | $ 46,910 | $ 46,910 | 0 | $ 43,325 | |
2021 | Montgomery | 15.234.21 | Cloverly Elementary | Door Replacement | Replace interior corridor and exterior doors. | $ 143,709 | $ 143,709 | $ 406 | $ 143,709 | |
2021 | Montgomery | 15.234.21 | Cloverly Elementary | Ceiling Tile Replacement | The 1st phase is to replace the suspended ceiling tiles, grid system and lights. | $ 235,000 | $ 235,000 | $ 406 | $ 235,000 | |
2021 | Montgomery | 15.165.21 | Resnik Elementary | Flooring | Replace gym floor (synthetic to wood). | $ 114,152 | $ 114,152 | 0 | $ 114,152 | |
2021 | Somerset | 19.007.21 | Deal Island Elementary | Partition Replacement | Remove and replace existing accordion stage partition. | $ 17,500 | $ 17,500 | 0 | $ 17,500 | |
2021 | Anne Arundel | 02.009.21 | Chesapeake Bay Middle | Countertops and Casework | Replace countertops and casework. | $ 197,488 | $ 197,488 | 0 | $ 197,488 | |
2021 | Anne Arundel | 02.056.21 | Belvedere Elementary | Cafeteria & Gym Doors | Replace in kind folding doors in the cafeteria and gym. | $ 42,000 | $ 42,000 | 0 | $ 38,000 | |
2021 | Anne Arundel | 02.113.21 | Shady Side Elementary | Cafeteria Doors | Replace in kind folding doors in cafeteria. | $ 45,000 | $ 45,000 | 0 | $ 45,000 | |
2021 | Howard | 13.023.21 | Swansfield Elementary | Playground Equipment | Replace the existing K-area playground installed in 2001. | $ 94,500 | $ 91,333 | $ 3,137 | $ 91,333 | |
2021 | Cecil | 07.031.21 | Cecilton Elementary | Playground Equipment | Replace and repair deteriorating playground equipment. | $ 11,000 | $ 11,000 | 0 | $ 10,360 | |
2021 | Cecil | 07.011.21 | Thomson Estates Elementary | Audio System | Upgrade the outdated public announcement system. | $ 13,000 | $ 13,000 | 0 | $ 12,937 | |
2021 | Baltimore City | 30.135.21 | Liberty Elementary #064 | Playground Equipment | Remove and replace two playgrounds installed in 1995, in partnership with the Goldseker Foundation. | $ 49,500 | $ 49,500 | 0 | $ 48,944 | |
2021 | Frederick | 10.012.21 | Walkersville High | Auditorium Seating | Replace the entire 1976 auditorium seating with 1,197 new seats that will meet current code and ADA requirements. | $ 181,268 | $ 181,268 | 0 | $ 181,268 | |
2021 | Prince George's | 16.085.21 | High Point High | PA System | Replace the public address system. | $ 85,000 | $ 85,000 | 0 | $ 85,000 | |
2021 | Wicomico | 22.002.21 | Pinehurst Elementary | VCT Flooring | Install new VCT flooring. | $ 13,419 | $ 13,419 | 0 | $ 13,419 | |
2021 | Wicomico | 22.022.21 | Pinehurst Elementary | Gym Floor | Repair the gym floor. | $ 42,330 | $ 36,964 | $ 5,366 | $ 36,964 | |
2021 | Allegany | 01.022.21 | Cash Valley Elementary | Air Handler Unit | Replace the multizone, packaged air handler unit with a variable refrigerant volume system. | $ 350,000 | $ 195,582 | $ 154,418 | $ 195,582 | |
2021 | Baltimore City | 30.149.21 | Morrell Park Pk-8 #220 | Asphalt and Concrete | Remove and replace asphalt parking lots, play areas and concrete sidewalk areas. | $ 140,000 | $ 140,000 | 0 | $ 105,705 | |
2021 | Harford | 12.013.21 | William S. James Elementary | Motor Control Center | Replace the motor control center equipment. | $ 60,000 | $ 60,000 | 0 | $ 26,746 | |
2021 | Harford | 12.028.21 | Havre de Grace Elementary | Gym & Stage Floors | Refinish the gym and stage floors. | $ 20,000 | $ 20,000 | 0 | $ 13,972 | |
2021 | Worcester | 23.013.21 | Cedar Chapel Special School | HVAC Wall Units Replacement | Remove ten classroom HVAC wall units and install new McQuay Type K Incremental Room Conditioners. | $ 37,590 | $ 37,590 | 0 | $ 37,590 | |
2021 | Wicomico | 22.012.21 | Northwestern Elementary | VCT Flooring | Install New VCT flooring in café/gym | $ 18,971 | $ 18,971 | 0 | $ 18,971 | 0 |
2021 | Caroline | 05.002.21 | North Caroline High | WWTP Lift Station | Rebuild one of the lift stations on the waste water treatment facility site. | $ 50,650 | $ 50,074 | $ 576 | $ 50,074 | 0 |
2021 | Baltimore County | 03.108.21 | Gunpowder Elementary | Modular Building Repair | Replace the 8,400 square ft. roof installed in 1995, including exterior walls, exterior doors and frames, VCT flooring, ceilings, lights, and interior paint. | $ 322,000 | $ 307,000 | $ 15,000 | $ 300,000 | |
2021 | Baltimore County | 03.188.21 | Carney Elementary | Modular Building Repair | Replace exterior walls, exterior doors and frames, VCT flooring, ceilings and lights, including interior paint. | $ 277,227 | $ 262,227 | $ 15,000 | $ 260,000 | |
2021 | Carroll | 06.024.21 | Francis Scott Key High | Gym Floor | Refinish the gym floor and repaint the existing lines. | $ 21,187 | $ 21,187 | 0 | $ 21,187 | |
2021 | Carroll | 06.043.21 | Oklahoma Road Middle | Gym Floor | Refinish the gym floor and repaint the existing lines. | $ 15,627 | $ 15,627 | 0 | $ 15,627 | |
2021 | Carroll | 06.007.21 | Mechanicsville Elementary | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | 0 | $ 15,992 | |
2021 | Carroll | 06.043.21 | Oklahoma Road Middle | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | 0 | $ 18,195 | |
2021 | Carroll | 06.023.21 | Winfield Elementary | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | 0 | $ 20,000 | |
2021 | Carroll | 06.038.21 | Friendship Valley Elementary | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | 0 | $ 18,144 | |
2021 | Talbot | 20.002.21 | Easton High | Trane Chiller | Upgrade control panel to monitor and maintain the aging Trane chiller. | $ 31,115 | $ 31,115 | 0 | $ 31,115 | |
2021 | Harford | 12.026.21 | North Harford Elementary | Parking Lot Repairs | Replace 22 LF of curb and 160 SF of sidewalk and install pavement markings. | $ 92,708 | $ 92,708 | 0 | $ 86,588 | |
2021 | Harford | 12.031.21 | North Bend Elementary | Gym Floor | Replace the existing gym floor with vinyl sheet goods. | $ 47,000 | $ 47,000 | 0 | $ 92,120 | |
2021 | Baltimore City | 30.262.21 | Edgewood Elementary | Floors | Installation of 500sqft gym flooring | $ 93,000 | $ 93,000 | 0 | $ 86,400 | |
2021 | Baltimore City | 30.096.21 | Hamilton Elementary/Middle | Water Pump | install a new 1000 GPM at 50 psi | $ 49,000 | $ 49,000 | 0 | $ 49,000 | |
2021 | Baltimore City | 30.20.21 | Dallas F. Nicholas ES | Security Fence | Replace security fencing | $ 16,000 | $ 16,000 | 0 | $ 16,000 | |
2021 | Baltimore City | 30.045.21 | Windsor Hill Elementary/Middle | Gym Floor Refurbishment | Sand existing gym floors and apply sealer | $ 22,000 | $ 22,000 | 0 | $ 14,490 | |
2021 | Baltimore City | 30.193.21 | Sinclair ES | Gym Floor | Installation of new gym floor with 25/32 x 21/4" MFMA or hardwood | $ 69,000 | $ 69,000 | 0 | $ 64,688 | |
2021 | Queen Anne's | 17.009.21 | Grasonville Elementary School | PA System | Replacement of the PA system. | $ 59,000 | $ 59,000 | 0 | $ 59,000 | |
2021 | Cecil | 07.013.21 | Perryville High | Sidewalks | Replace and repair deteriorating sidewalks. | $ 11,000 | $ 11,000 | 0 | $ 10,001 | |
2021 | St. Mary's | 18.020.21 | Great Mills High | Band Room Storage | Renovation of the existing band room storage area. | $ 50,074 | $ 50,074 | 0 | $ 49,876 | |
2021 | Garrett | 11.015.21 | Yough Glades Elementary | Playground | Replace existing playground. | $ 50,000 | $ 44,900 | $ 144,900 | $ 17,949 | |
2021 | Garrett | 11.004.21 | Grantsville Elementary | Playground | Upgrade sections of the existing playground. | $ 100,000 | $ 100,000 | 0 | $ 127,041 | |
2021 | Cecil | 07.013.21 | Perryville High | Stage Floor | Repair deteriorating stage floor and stairs. | $ 23,000 | $ 23,000 | 0 | $ 11,330 | |
2021 | Baltimore City | 30.030.21 | Hampden PK-8 #55 | Underground Oil Tank | Remove and install new double wall steel jacketed underground tank and double wall piping system. | $ 255,000 | $ 255,000 | 0 | $ 255,000 | |
2021 | Somerset | 19.004.21 | Crisfield High | Walk-In Refrigerator Replacement | Remove and replace the existing 1973 Walk-in cooler and freezer. | $ 40,000 | $ 15,000 | $ 25,000 | $ 15,000 | |
2021 | Baltimore City | 30.196.21 | Woodhome EM #205 | Intercom System | Replace absolute intercom, phone and paging system. | $ 24,863 | $ 24,863 | 0 | $ 24,863 | |
2021 | Baltimore City | 30.061.21 | Furman Templeton Elementary #125 | Playground Equipment | Remove and replace existing playground equipment. | $ 46,000 | $ 46,000 | 0 | $ 45,830 | |
2021 | Baltimore City | 30.056.21 | George G. Kelson #157 | Playground Equipment | Remove and replace existing playground equipment. | $ 48,000 | $ 48,000 | 0 | $ 47,046 | |
2021 | Baltimore City | 30.115.21 | Francis M. Wood #178 | Water Pump Replacement | Remove fire line pump. | $ 14,200 | $ 14,200 | 0 | $ 11,286 | |
2021 | Baltimore City | 30.092.21 | Roland Park Elementary/Middle # 233 | Water Pump Controller | Replace and install pump controller. | $ 22,400 | $ 22,400 | 0 | $ 17,582 | |
2021 | Prince George's | 16.207.21 | Perrywood Elementary | PA System | Replace the public address system for the entire school. | $ 60,000 | $ 60,000 | 0 | $ 45,499 | |
2021 | Prince George's | 16.230.21 | Panorama Elementary | PA System | Replace the public address system for the entire school. | $ 64,000 | $ 64,000 | 0 | $ 46,142 | |
2021 | Prince George's | 16.175.21 | Hillcrest Heights Elementary | PA System | Replace the public address system for the entire school. | $ 67,000 | $ 67,000 | 0 | $ 67,000 | |
2021 | Prince George's | 16.231.21 | Mary Mother Jones Elementary | PA System | Replace the public address system for the entire school. | $ 69,000 | $ 69,000 | 0 | $ 69,000 | |
2021 | Prince George's | 16.014.21 | Laurel High | PA System | Replace the public address system for the entire school. | $ 99,000 | $ 99,000 | 0 | $ 99,000 | |
2021 | Prince George's | 16.222.21 | Robert Gray Elementary | PA System | Replace the public address system for the entire school. | $ 64,000 | $ 64,000 | 0 | $ 64,000 | |
2021 | Prince George's | 16.089.21 | Bowie High | PA System | Replace the public address system for the entire school. | $ 86,000 | $ 86,000 | 0 | $ 86,000 | |
2021 | Prince George's | 16.234.21 | Lake Arbor Elementary | PA System | Replace the public address system for the entire school. | $ 73,000 | $ 73,000 | 0 | $ 73,000 | |
2021 | Prince George's | 16.117.21 | Dodge Park Elementary | PA System | Replace the public address system for the entire school. | $ 56,000 | $ 56,000 | 0 | $ 38,756 | |
2021 | Prince George's | 16.220.21 | Berwyn Heights Elementary | PA System | Replace the public address system for the entire school. | $ 80,000 | $ 80,000 | 0 | $ 41,625 | |
2021 | Prince George's | 16.209.21 | Patuxent Elementary | PA System | Replace the public address system for the entire school. | $ 66,000 | $ 66,000 | 0 | $ 66,000 | |
2021 | Washington | 21.008.21 | Smithsburg Middle | Fire Alarm System | Replace the existing fire alarm system, installed in 1976. | $ 200,000 | $ 134,904 | $ 65,096 | $ 134,904 | |
2021 | Baltimore County | 03.102.21 | Featherbed Lane Elementary | Doors | Replace original doors that are in poor condition. | $ 170,000 | $ 150,000 | $ 20,000 | $ 143,615 | |
2021 | Baltimore County | 03.102.21 | Featherbed Lane Elementary | Health Suite Renovation | Improve the original health suite office, including the triage and sick students areas. | $ 120,000 | $ 100,000 | $ 20,000 | $ 100,000 | |
2021 | Baltimore County | 03.011.21 | Perry Hall High | Door Lite Installation | Provide door lites into existing solid doors to increase visibility and increase the safety and security of the students and staff. | $ 65,000 | $ 55,000 | $ 10,000 | $ 55,000 | |
2021 | Worcester | 23.004.21 | Stephen Decatur High | Exterior Masonry Walls | Repair of approximately 3,000 square feet of masonry wall at the school gymnasium walls and at the auditorium wall. | $ 39,000 | $ 39,000 | 0 | $ 39,000 | |
2021 | Wicomico | 22.015.21 | Wicomico Middle | Masonry | Repair of masonry wall. | $ 37,273 | $ 37,273 | 0 | $ 37,273 | |
2021 | Anne Arundel | 02.088.21 | Hilltop Elementary | Exterior Doors & Frames | Remove and replace 28 exterior doors, 19 door frames and side lights. | $ 107,464 | $ 107,464 | 0 | $ 107,464 | |
2021 | Anne Arundel | 02.095.21 | Marley Glen Special | Exterior Doors & Frames | Remove and replace 37 exterior doors and 7 door frames. | $ 196,243 | $ 115,342 | $ 80,901 | $ 115,342 | |
2021 | Cecil | 07.027.21 | Bohemia Manor Middle/High | Audio System | Upgrade the outdated public announcement system. | $ 17,000 | $ 17,000 | 0 | $ 16,552 | |
2021 | Baltimore City | 30.179.21 | Lakeland PK-8 # 012 | Gym Floor Replacement | Replace gym floor and athletic markings. | $ 52,000 | $ 52,000 | 0 | $ 52,000 | |
2021 | Baltimore City | 30.276.21 | Bragg Nature Center Farm | Masonry | Remove and replace the existing sidewalk. | $ 54,100 | $ 54,100 | 0 | $ 54,100 | |
2021 | Baltimore City | 30.250.21 | Cecil Elementary | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,992 | $ 24,992 | 0 | $ 24,992 | |
2021 | Baltimore City | 30.218.21 | Dr. Nathan Pitts #058 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,950 | $ 24,950 | 0 | $ 24,925 | |
2021 | Baltimore City | 30.115.21 | Excel At Francis Woods #178 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,968 | $ 24,968 | 0 | $ 24,968 | |
2021 | Baltimore City | 30.246.21 | Edmondson High #400 | Intercom & Paging System | Replace and install intercom and paging system. | $ 43,056 | $ 43,056 | 0 | $ 43,007 | |
2021 | Baltimore City | 30.180.21 | Westside Skill Center | Intercom & Paging System | Replace and install intercom and paging system. | $ 23,076 | $ 23,076 | 0 | $ 23,076 | |
2021 | Baltimore City | 30.045.21 | Windsor Hills #087 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,988 | $ 24,988 | 0 | $ 24,848 | |
2021 | Baltimore City | 30.090.21 | Thomas Jefferson Elementary #232 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,973 | $ 24,973 | 0 | $ 24,973 | |
2021 | Cecil | 07.022.21 | Rising Sun High | Sidewalks | Repair and replace deteriorating sidewalks. | $ 15,000 | $ 15,000 | 0 | $ 10,400 | |
2021 | Baltimore City | 30.195.21 | Beechfield Elementary | Playground Equipment | Replace and install playground equipment. | $ 40,880 | $ 40,880 | 0 | $ 40,880 | |
2021 | Cecil | 07.034.21 | Bainbridge Elementary | VCT Flooring | Replace deteriorating carpeting. | $ 16,500 | $ 16,500 | 0 | $ 10,890 | |
2021 | Cecil | 07.035.21 | North East Elementary | VCT Flooring | Replace deteriorating carpeting. | $ 20,000 | $ 20,000 | 0 | $ 12,509 | |
2021 | Prince George's | 16.194.21 | DuVal High | Tennis Court | Refurbish two tennis courts. | $ 150,000 | $ 150,000 | 0 | $ 150,000 | |
2021 | Prince George's | 16.174.21 | Charles H. Flowers High | Tennis Court | Refurbish four tennis courts. | $ 190,000 | $ 190,000 | 0 | $ 190,000 | |
2021 | Calvert | 04.019.21 | Patuxent High | Intercom System | Partial intercom system replacement, including the head end equipment, the administrative desk intercom phone units and programming. | $ 49,753 | $ 38,292 | $ 11,461 | $ 38,292 | |
2021 | Montgomery | 15.151.21 | McAuliffe Elementary | Ceiling Tile Replacement | The phase 1st is to replace tectum ceiling tiles and existing fluorescent light fixtures. | $ 60,000 | $ 60,000 | 0 | $ 68,030 | |
2021 | Montgomery | 15.007.21 | Cold Spring Elementary | Masonry Wall Repair | Repair of masonry wall. | $ 49,790 | $ 49,790 | 0 | $ 41,760 | |
2022 | Baltimore City | 30.197.22 | James McHenry Elementary | Playground | Replace playground equipment and rubber surface. | $ 42,000 | $ 42,000 | $ 42,000 | ||
2022 | Baltimore City | 30.045.22 | Windsor Hills | Wall /Step | Rebuild stone wall and steps in the rear | $ 15,000 | $ 15,000 | $ 15,000 | ||
2022 | Baltimore City | 30.056.22 | George Kelson ES (sandtown Winchester Academy) | Sidewalk replacement and Asphalt resurfacing | Replace concrete sidewalks and resurface asphalt surfaces including parking lot | $ 145,000 | $ 145,000 | $ 143,725 | ||
2022 | Dorchester | 09.014.22 | Hurlock Elementary | Access Control | Furnish and install access control on essential exterior doors. | $ 23,365 | $ 23,365 | $ 23,365 | ||
2022 | Harford | 12.036.22 | Hall's Cross Roads | Wheelchair Lift | Replace the existing wheelchair lift with a commercial lift. | $ 36,000 | $ 36,000 | $ 36,000 | ||
2022 | Kent | 14.007.22 | Kent County HS | Drainage Repairs | Resurfacing track | $ 40,900 | $ 40,900 | $ 25,120 | ||
2022 | Queen Anne's | 17.005.22 | Centreville Es | PA System | Installing a new headend, admin console, speakers, and wiring to replace the existing PA system that was installed in 2003. | $ 50,000 | $ 50,000 | $ 50,000 | ||
2022 | Montgomery | 15.107.22 | Sherwood ES | Door windows and Frame installation | Replacing the original wire pane glass windows and metal door frames with thermal glass door windows and frames on the original sections of Sherwood elementary. | $ 313,000 | $ 313,000 | $ 312,651 | ||
2022 | Montgomery | 15.164.22 | Brooke Grove ES | Elevator Replacement | Modernize the two stop elevator to be in compliance with ADA regulations | $ 290,000 | $ 290,000 | $ 290,000 | ||
2022 | Cecil | 07.029.22 | Elkton Middle | Window Painting | Prep and paint all metal windows and soffits | $ 30,325 | $ 30,325 | $ 30,325 | ||
2022 | Cecil | 07.014.22 | Calvert Elementary | Gutter Replacement | Complete gutter and downspout replacement | $ 35,000 | $ 35,000 | $ 35,000 | ||
2022 | Cecil | 07.021.22 | Kenmore Elementary | gutter replacement | Complete gutter and downspout replacement | $ 10,728 | $ 10,728 | $ 10,728 | ||
2022 | Washington | 21.020.22 | South Hagerstown High | Gym Bleacher Replacement | Replace the existing wood bleachers. | $ 200,000 | $ 134,904 | $ 65,096 | $ 134,904 | |
2022 | Anne Arundel | 02.037.22 | Bates Middle | Wheelchair Lift Replacement | Remove and replace existing chairlift. | $ 40,000 | $ 40,000 | $ 40,000 | ||
2022 | Anne Arundel | 02.066.22 | Meade Heights Elementary | Replace Folding Doors in Gym/Café | Remove and replace folding doors in Gym/Cafe. | $ 70,000 | $ 70,000 | $ 70,000 | ||
2022 | Anne Arundel | 02.075.22 | Deale Elementary | Replace Folding Doors in Gym/Café | Remove and replace folding doors in Gym/Café | $ 75,000 | $ 75,000 | $ 75,000 | ||
2022 | Anne Arundel | 02.040.22 | Arundel High | Wheelchair Lift Replacement | Remove and replace existing chair lift. | $ 40,000 | $ 40,000 | $ 40,000 | ||
2022 | Anne Arundel | 02.057.22 | Arundel Middle | Wheelchair Lift Replacement | Remove and replace existing wheelchair lift | $ 40,000 | $ 11,000 | $ 29,000 | $ 11,000 | |
2022 | Anne Arundel | 02.010.22 | Four Seasons Elementary | Gym/Cafe Folding Doors | Install Folding Doors in Gym/Café | $ 65,000 | $ 65,000 | 0 | $ 65,000 | |
2022 | Anne Arundel | 02.092.22 | Brooklyn Park Middle | Replacement of Wheelchair Lift | Wheelchair Lift Replacement | $ 40,000 | $ 40,000 | 0 | $ 40,000 | |
2022 | Anne Arundel | 02.113.22 | Shady Side Elementary | Playground Equipment | Replace playground equipment. | $ 165,000 | $ 165,000 | 0 | $ 165,000 | |
2022 | Prince George's | 16.011.22 | Largo High | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 217,520 | $ 217,520 | 0 | $ 217,520 | |
2022 | Prince George's | 16.153.21 | Carole Highlands Elementary | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 134,197 | $ 134,197 | 0 | $ 134,197 | |
2022 | Prince Georges | 16.043.22 | Kettering Middle | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 158,236 | $ 158,236 | 0 | $ 158,236 | |
2022 | Prince Georges | 16.213.22 | Martin Luther King Middle | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 155,955 | $ 155,955 | 0 | $ 155,955 | |
2022 | Prince Georges | 16.107.22 | Gladys Noon Spellman ES | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 122,738 | $ 122,738 | 0 | $ 122,738 | |
2022 | Prince Georges | 16.197.22 | Andrew Jackson Academy | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 147,367 | $ 147,367 | 0 | $ 147,367 | |
2022 | Prince Georges | 16.025.22 | Bradbury Heights Elementary | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 138,004 | $ 138,004 | 0 | $ 138,004 | |
2022 | Howard | 13.005.22 | Centennial Lane Elementary | Playground Replacement | Replace the existing Kindergarten area playground installed in 2001. | $ 92,000 | $ 87,776 | $ 4,224 | $ 87,776 | |
2022 | Baltimore City | 30.234.22 | Johnston Square | Urinal Replacement | Remove original floor-mounted urinals and hang 4 new walls hung urinals and install four new flush valves. | $ 19,000 | $ 19,000 | $ 19,000 | ||
2022 | Wicomico | 22.002.22 | Pinehurst Elementary | Floor Replacement | Remove and install new rubber flooring. | $ 46,971 | $ 46,000 | $ 971 | $ 46,000 | |
2022 | Cecil | 07.026.22 | Rising Sun Elementary | Playground Equipment Replacement | Installation of new playground equipment. | $ 11,500 | $ 11,500 | $ 11,500 | ||
2022 | Somerset | 19.004.22 | Crisfield Academy and High School | Gymnasium Floor Resurfacing | Refinish main gymnasium floor, auxiliary gymnasium floors, and auditorium stage including treads and risers. | $ 35,450 | $ 35,450 | 0 | $ 35,450 | |
2022 | Harford | 12.001.22 | Fallston High | Bleacher Seating Replacement | Replace the bleacher and support posts. | $ 31,000 | $ 31,000 | $ 31,000 | ||
2022 | Wicomico | 22.022.22 | Pinehurst Elementary | VCT Floor Replacement | Replace the VCT Flooring on the 2nd floor | $ 24,728 | $ 24,000 | $ 728 | $ 24,000 | |
2022 | Wicomico | 22.022.22 | Pinehurst Elementary | Rubber Floor Replacement | Removal and installation of new rubber flooring | $ 37,295 | $ 36,627 | $ 668 | $ 36,627 | |
2022 | Baltimore City | 30.242.22 | Matthew A. Henson Elementary #o29 | Asphalt Replacement | Reconstruction of entire rear parking area. | $ 160,000 | $ 160,000 | $ 160,000 | ||
2022 | Baltimore City | 30.023.22 | Francis Scott Key Elementary/Middle #076 | Playground Equipment | Replace playground equipment and associated site work. | $ 16,000 | $ 16,000 | $ 16,000 | ||
2022 | Charles | 08.011.22 | Arthur Middleton Elementary | Switchgear Replacement | Replace the switchgear. | $ 400,000 | $ 209,492 | $ 190,508 | $ 209,492 | |
2022 | Baltimore City | 30.243.22 | Franklin Square PreK-8 #095 | Gymnasium Floor Replacement | Replace Gymnasium Floor | $ 79,265 | $ 79,265 | $ 79,265 | ||
2022 | Baltimore City | 30.029.22 | Margaret Brent PreK-8 #053 | Gymnasium Floor Replacement | Replace Gymnasium floor. | $ 98,360 | $ 98,360 | $ 98,360 | ||
2022 | Baltimore City | 30.148.22 | Falstaff PreK-8 #241 | Gymnasium Floor Replacement | Replace Gymnasium floor. | $ 85,000 | $ 85,000 | $ 85,000 | ||
2022 | Baltimore City | 30.113.22 | Carver Vocational -Technical High (CTE) #454 | Plumbing Replacement | Replace existing drain tile. | $ 125,450 | $ 125,450 | $ 125,450 | ||
2022 | Baltimore City | 30.020.22 | Dallas F. Nicholas Elementary #039 | Water Heaters Replacement | Replace existing water heaters with 4 Navo tankless water heaters and install new PVC flues. | $ 37,500 | $ 37,500 | $ 37,500 | ||
2022 | Baltimore City | 30.095.22 | Glenmount PreK-8 #235 | Plumbing Replacement | Replace plumbing. | $ 18,400 | $ 18,400 | $ 18,400 | ||
2022 | Baltimore City | 30.181.22 | Francis Scott Key Elementary/Middle School | Asphault Repair | Replace concrete. | $ 33,516 | $ 33,516 | $ 33,516 | ||
2022 | Carroll | 06.048.22 | Century High School | Elevator Replacement | Replace Elevator Components | $ 56,450 | $ 56,450 | $ 56,450 | ||
2022 | Carroll | 06.052.22 | Winters Mill High School | Elevator Replacement | Replace Elevator Components | $ 56,450 | $ 56,450 | $ 56,450 | ||
2022 | Carroll | 06.024.22 | Francis Scott Key High School | Elevator Replacement | Replace Elevator Components | $ 56,450 | $ 24,361 | $ 24,361 | ||
2022 | Baltimore City | 30.188.22 | Walbrook KIPP #347 | Concrete Sidewalks | Install concrete sidewalks. | $ 17,400 | $ 17,400 | $ 17,400 | ||
2022 | Baltimore County | 03.011.22 | Perry Hall High | Replace Intercom | Replace Intercom | $ 655,000 | $ 655,000 | $ 5,000 | $ 655,000 | |
2022 | Baltimore County | 03.111.22 | Woodmoor Elementary | Replace Intercom | Replace Intercom | $ 210,000 | $ 210,000 | $ 30,000 | $ 210,000 | |
2022 | Baltimore County | 03.069.22 | Padonia International Elementary School | Replace the fencing Improv | Fencing Improvements | $ 35,000 | $ 35,000 | $ 5,000 | $ 35,000 | |
2022 | Baltimore County | 03.147.22 | Deer Park Middle | Replace Chair lift. | Replace chairlift. | $ 45,500 | $ 45,500 | $ 5,000 | $ 45,435 | |
2022 | Baltimore City | 30.210.22 | Garrett Heights PreK-8 #212 | Water Heaters Replacement | Replace existing water heaters with four (4) Navo tankless water heaters and install new PVC flues. | $ 53,000 | $ 53,000 | $ 53,000 | ||
2022 | Baltimore City | 30.061.22 | Furman Templeton PreK-5 #125 | Water Heaters Replacement | Replace existing water heaters with 4 Navo tankless water heaters and install PVC flues. | $ 45,050 | $ 45,050 | $ 45,050 | ||
2022 | Baltimore City | 30.224.22 | Abbottston Elementary | Playground Rubber Surface | Installation of rubber surface and resources to support equipment installation. | $ 49,000 | $ 49,000 | $ 49,000 | ||
2022 | Garrett | 11.009.22 | Northern Middle | PA System | Replace PA system. | $ 21,959 | $ 21,959 | $ 21,959 | ||
2022 | Baltimore City | 30.402.22 | Northern Building (AKA Reginald Lewis) | Fence Replacement | Replace the fencing around the stadium field area. | $ 16,500 | $ 16,500 | 0 | $ 16,500 | |
2022 | Calvert | 04.022.22 | Windy Hill Middle | Intercom and Paging System | Partial intercom system replacement, including the paging system. | $ 29,990 | $ 29,990 | $ 29,990 | ||
2022 | St.Mary's County | 18.019.22 | Chopticon High School | Restroom Renovation | To replace the floor title, stall partitions, urinals in one of th restrooms with the inclusion of privacy screens for each urinal. | $ 50,508 | $ 50,074 | $ 434 | $ 50,074 | |
2022 | Baltimore City | 30.274.22 | Harlem Park Building #078 | Asphalt and Concrete | Asphalt and concrete replacement. | $ 177,144 | $ 177,114 | $ 177,114 | ||
2022 | Baltimore City | 30.041.22 | North Bend Elementary | Asphalt and Concrete Repair | Provide new concrete sidewalks and aprons , asphalt overlay : | $ 207,000 | $ 207,000 | $ 207,000 | ||
2022 | Dorchester | 09.005.22 | Vienna Elementary | Access Control Exterior Doors | Install access control to exterior doors for continued exterior security measures. | $ 40,302 | $ 38,292 | $ 2,010 | $ 38,292 | |
2022 | Dorchester | 09.010.22 | Maple Elementary | Access Control Exterior Doors | Install Access Control on exterior doors | $ 31,868 | $ 14,927 | $ 16,941 | $ 14,927 | |
2022 | Frederick | 10.052.22 | Orchard Grove ES | Fire Alarm Replacement | Replace fire alarm system with current code complaint equipment providing strobes and voice evacuation. | $ 182,622 | $ 182,622 | $ 182,622 | ||
2022 | Garrett | 11.009.22 | Grantville ES | PA System | Installation of 40 speakers, and 10 horns to replace the PA system | $ 16,033 | $ 16,003 | $ 16,003 | ||
2023 | Allegany | 01.035 | Braddock Middle | Plumbing/Casework/Electrical Replacement | Replace the existing 1965 casework and the consumer science lab, including the replacement of plumbing and electric outlets. | $ 225,000 | $ 195,582 | $ 195,000 | $ 195,582 | |
2023 | Anne Arundel | 02.023 | Broadneck Elementary | Doors/Frames Replacement | Replace exterior doors and frames. | $ 121,740 | $ 11,373 | $ 101,367 | $ 11,373 | |
2023 | Anne Arundel | 02.085 | Brooklyn Park Elementary | Door Replacement | Replace exterior doors and frames. | $ 162,456 | $ 162,456 | 0 | $ 162,456 | |
2023 | Anne Arundel | 02.115 | Crofton Woods Elementary | Doors /Frames Replacement | Replace exterior doors and frames. | $ 125,000 | $ 125,000 | 0 | $ 125,000 | |
2023 | Anne Arundel | 02.127 | Lindale Middle | Door Replacement | Install folding doors in the auditorium. | $ 80,000 | $ 80,000 | 0 | 0 | |
2023 | Anne Arundel | 02.038 | Crofton Middle | Door Replacement | Folding door in main gym. | $ 133,422 | $ 133,422 | $ 133,422 | ||
2023 | Anne Arundel | 02.127 | Lindale Middle | Door Replacement | Install folding doors in the cafeteria/gymnasium. | $ 80,000 | $ 80,000 | 0 | 0 | |
2023 | Anne Arundel | 02.031 | Fort Smallwood Elementary | Folding doors in the café/gym | Replace folding doors in Cafeteria and gymnasium. | $ 70,000 | $ 70,000 | 0 | $ 70,000 | |
2023 | Anne Arundel | 02.020 | Glen Burnie High | Elevator Chairlift Replacement | Replace the elevator chairlift. | $ 40,000 | $ 20,000 | $ 20,000 | $ 20,000 | |
2023 | Baltimore | 03.078 | Hernwood Elementary | Bathroom Renovation | Convert one existing storage room and one existing conference room into an ADA compliant bathroom stalls. | $ 280,000 | $ 250,000 | 0 | $ 250,000 | |
2023 | Baltimore | 03.041 | Dundalk Middle | Auditorium | Replace sections of the auditorium. | $ 205,000 | $ 195,000 | 0 | $ 195,000 | |
2023 | Baltimore | 03.176 | Southwest Academy | Locker Replacement | Replace Lockers. | $ 440,000 | $ 429,000 | 0 | $ 429,000 | |
2023 | Baltimore City | 30.042 | William Paca Elementary #83 | Elevator | Renovate and upgrade elevator. | $ 308,287 | $ 308,287 | 0 | $ 308,287 | |
2023 | Baltimore City | 30.040 | William H Lemmel Building #079 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 107,582 | $ 107,582 | 0 | $ 107,582 | |
2023 | Baltimore City | 30.168 | Booker T Washington Building #130 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 123,435 | $ 123,435 | 0 | $ 123,435 | |
2023 | Baltimore City | 30.099 | Benjamin Franklin Building #239 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 123,147 | $ 123,147 | 0 | $ 123,147 | |
2023 | Baltimore City | 30.108 | William S Bear Special Ed #301 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 77,297 | $ 77,297 | 0 | $ 77,297 | |
2023 | Baltimore City | 30.284 | Baltimore Leadership School for Young Women | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 42,941 | $ 42,941 | 0 | $ 42,941 | |
2023 | Baltimore City | 30.128 | Paul Laurence Dunbar High #414 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 147,038 | $ 147,038 | 0 | $ 147,038 | |
2023 | Baltimore City | 30.178 | Baltimore School for the Arts #415 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 92,672 | $ 92,672 | 0 | $ 92,672 | |
2023 | Baltimore City | 30.147 | Paul Laurence Dunbar Middle Building #133 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 93,104 | $ 93,104 | 0 | $ 93,104 | |
2023 | Baltimore City | 30.146 | Digital Harbor High #416 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 111,066 | $ 111,066 | 0 | $ 111,066 | |
2023 | Baltimore City | 30.113 | Carver Vocational - Technical High CTE #454 | Security Cameras and Access Control | Install CCTV cameras, exterior door monitoring system and building access control. | $ 132,463 | $ 132,463 | 0 | $ 132,463 | |
2023 | Caroline | 05.071 | Ridgely Elementary | Playground Replacement | Replace playground equipment. | $ 199,947 | $ 103,910 | $ 96,037 | $ 103,910 | |
2023 | Carroll | 06.048 | Century High School | Caulk Replacement | Remove and recalk the building exterior | $ 70,000 | $ 41,131 | 0 | $ 41,131 | |
2023 | Carroll | 06.052 | Winters Mill High | Caulk Replacement | Refinish the existing lines on the gymnasium. | $ 70,000 | $ 41,130 | 0 | $ 41,130 | |
2023 | Carroll | 06.052 | Winters Mill High | Gymnasium Floor Upgrades | Repaint the gym floor existing lines. | $ 30,000 | $ 30,000 | 0 | $ 30,000 | |
2023 | Carroll | 06.002 | Northwest Middle | Gymnasium Floor Upgrades | Repaint the gym existing lines | $ 25,000 | $ 25,000 | 0 | $ 25,000 | |
2023 | Cecil | 07.013 | Perryville High | Track Resurfacing | Resurface, clean, patch and re-line multiple layers. | $ 40,000 | $ 40,000 | 0 | $ 40,000 | |
2023 | Cecil | 07.024 | Elk Neck Elementary | Floor Replacement | Gym floor replacement. | $ 46,000 | $ 46,000 | 0 | $ 46,000 | |
2023 | Cecil | 07.019 | Conowingo Elementary | Floor Replacement | Remove existing deteriorated carpeting and replace with new VCT flooring in approx. 8. classrooms. Replace carpet with new VCT flooring in approximately 8 classrooms. | $ 24,000 | $ 24,000 | 0 | $ 24,000 | |
2023 | Cecil | 07.019 | Conowingo Elementary | RTU Replacement | Replace Roof Top Unit's (RTUs) coil, accessories, piping, fans, motors, drive and all associated controls. | $ 29,750 | $ 29,750 | 0 | $ 29,750 | |
2023 | Dorchester | 09.008 | New Directions Learning Academy | Security Camera/Access Control | Install video security camera system and access control. | $ 64,303 | $ 38,378 | $ 25,925 | $ 38,378 | |
2023 | Dorchester | 09.001.24 | Sandy Hill Elementary | Gym Renovation | Replace concrete composite gym floor and repaint ceiling and walls. | $ 97,960 | $ 38,378 | 0 | ||
2023 | Frederick | 10.008 | Thurmont Middle | Fire Alarm Replacement | Replace the 2002 fire alarm system. | $ 182,622 | $ 182,622 | 0 | 0 | |
2023 | Garrett | 11.015 | Yough Glades Elementary | PA Replacement | Replace the PA system. | $ 19,059 | $ 19,059 | $ 19,059 | ||
2023 | Harford | 12.002 | Magnolia Elementary | Sewer Lines | Replace sewer piping. | $ 46,895 | $ 46,895 | 0 | $ 46,895 | |
2023 | Harford | 12.053 | Meadowvale Elementary | Doors /Frames Replacement | Replace twenty doors and two door frames. | $ 21,000 | $ 21,000 | 0 | $ 21,000 | |
2023 | Harford | 12.036 | Halls Cross Roads Elementary | Wheelchair Lift Replacement | Replace 2 wheelchair lifts to commercial lift. | $ 42,000 | $ 42,000 | 0 | $ 42,000 | |
2023 | Harford | 12.013 | William S. James Elementary | Concrete Replacement | Replace the sidewalk, curb, and gutter | $ 48,000 | $ 48,000 | 0 | $ 48,000 | |
2023 | Harford | 12.038 | Emmorton Elementary | Concrete Replacement | Replace the sidewalk, curb, drain and gutter | $ 45,000 | $ 45,000 | 0 | $ 45,000 | |
2023 | Harford | 12.030 | Fallston Middle | Sand/Paint Gym | Apply two coats of buckeye seal oil to existing lines, new logo and auxiliary gym | $ 25,761 | $ 25,761 | 0 | $ 25,761 | |
2023 | Harford | 12.043 | Forest Hill Elementary | Fence Replacement | Remove and Install approximately 510ft of 4ft chain link fencing. | $ 25,000 | $ 25,000 | 0 | $ 25,000 | |
2023 | Harford | 12.038 | Emmorton Elementary | Fence Replacement | Remove and Install approximately 212ft of 4ft chain link fencing and 486ft chain link fencing. | $ 26,900 | $ 26,900 | 0 | $ 26,900 | |
2023 | Harford | 12.014 | Edgewood Middle | Exterior Lighting | To replace 34 existing parking lot lights. | $ 38,028 | $ 38,028 | $ 38,028 | $ 38,028 | |
2023 | Harford | 12.053 | Meadowvale Elementary | Fence Replacement | Install chain link fencing and personnel gate. | $ 45,000 | $ 45,000 | 0 | $ 45,000 | |
2023 | Howard | 13.064 | Hammond Elementary | Playground Replacement | Replace existing playground. | $ 92,000 | $ 87,776 | $ 4,224 | $ 87,776 | |
2023 | Kent | 14.007 | Kent County High School | Building Renovation | Interior and exterior building improvements | $ 12,790 | $ 12,790 | 0 | $ 12,790 | |
2023 | Montgomery | 15.226 | Blake (James Hubert) High | Sound System Replacement | Replace the sound system in the auditorium. | $ 210,000 | $ 210,000 | 0 | $ 207,914 | |
2023 | Montgomery | 15.089 | New Hampshire Estate Elementary School | Elevator Replacement | Replace the elevator. | $ 275,000 | $ 275,000 | 0 | $ 275,000 | |
2023 | Montgomery | 15.166 | Watkins Mill High | Doors/Frames Replacement | Replace the exterior doors and frames. | $ 120,693 | $ 120,693 | $ 120,693 | ||
2023 | Prince George's | 16.033 | Crossland High | Bleacher/Press-Box Replacement | To replace the stadium bleachers and press box. | $ 1,209,426 | $ 1,209,426 | $ 1,209,426 | ||
2023 | Queen Anne's | 17.013 | Church Hill Elementary | Communication System | Replace the telephone system. | $ 24,900 | $ 24,900 | 0 | $ 24,900 | |
2023 | Queen Anne's | 17.005 | Centreville Elementary | Communication System | Replace the telephone system. | $ 24,900 | $ 24,900 | 0 | $ 24,900 | |
2023 | St. Mary's | 18.024 | Dynard Elementary | Bathroom Renovation | Modify the bathroom so that it is ADA compliant. | $ 79,687 | $ 50,074 | $ 50,074 | ||
2023 | Wicomico | 22.015 | Wicomico Middle | Floor Replacement | Replace floors on the first level. | $ 325,395 | $ 107,229 | 0 | $ 106,627 | |
2023 | Worcester | 23.013 | Cedar Chapel Special School | Playground Equipment | Install playground equipment and resurface site. | $ 240,000 | $ 77,186 | 0 | $ 77,186 | |
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | Local ASP Approved | State ASP Approved | State/Local Cost Share |
FY 2010-2019
ASP 10-19
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | State ASP Approved | State/Local Cost Share |
---|---|---|---|---|---|---|---|---|---|
2010 | Queen Anne's | 17.021.10 | Bayside Elementary | Technology Wiring | Wiring for equipment upgrades in 28 classrooms and media center. Upgrades to include e-beam, voice enhancement, LCD Projectors and document cameras. | $ 60,000 | $ 36,198 | $ 36,198 | 100 |
2010 | Harford | 12.005.10 | Havre de Grace High | Emergency Generator | Replacement of emergency generator. | $ 30,000 | $ 34,042 | $ 34,042 | |
2010 | Harford | 12.020.10 | C. Milton Wright High | Boiler | Re-tubing of two (2) boilers. | $ 40,000 | $ 31,464 | $ 31,464 | |
2010 | Harford | 12.018.10 | Center for Educational Opportunity | Electrical | Replacement/upgrade of main electric service entrance switchboard equipment. | $ 48,880 | $ 48,880 | $ 48,880 | |
2010 | Harford | 12.039.10 | Havre de Grace Middle | Bleachers | Replacement of indoor bleachers. | $ 60,000 | $ 25,016 | $ 25,016 | |
2010 | Baltimore City | 30.108.10 | William S. Baer #301 | Heating Fuel Tank Removal/Replacement | Removal of current fuel tank and replacement with double wall steel jacketed underground tank with double wall piping system. | $ 246,000 | $ 246,000 | $ 246,000 | 100 |
2010 | Baltimore City | 30.222.10 | Graceland Park-O'Donnell Heights PK-8 #240 | Heating Fuel Tank Removal/Replacement | Removal of current fuel tank and replacement with double wall steel jacketed underground tank with double wall piping system. | $ 238,000 | $ 238,000 | $ 238,000 | 100 |
2010 | Baltimore City | 30.086.10 | John Ruhrah PK-8 #228 | Heating Fuel Tank Removal/Replacement | Removal of current fuel tank and replacement with double wall steel jacketed underground tank with double wall piping system. | $ 240,000 | $ 240,000 | $ 240,000 | 100 |
2010 | Baltimore City | 30.260.10 | Barclay PK-8 #054 | Heating Fuel Tank Removal/Replacement | Removal of current fuel tank and replacement with double wall steel jacketed underground tank with double wall piping system. | $ 238,000 | $ 238,000 | $ 238,000 | 100 |
2010 | Baltimore City | 30.148.10 | Fallstaff PK-8 #241 | Heating Fuel Tank Removal/Replacement | Removal of current fuel tank and replacement with double wall steel jacketed underground tank with double wall piping system. | $ 230,000 | $ 230,000 | $ 230,000 | 100 |
2010 | Baltimore City | 30.108.10 | William S. Baer #301 | Fire Alarm Replacement | Replace and upgrade fire alarm system to meet current fire code regulations. | $ 46,914 | $ 46,914 | $ 46,914 | 100 |
2010 | Dorchester | 09.009.10 | Cambridge-South Dorchester High | ADA Accessibility | Install ADA door operators on approximately 12 doors and low profile panic bars on 38 exterior doors not previously upgraded. | $ 97,200 | $ 38,292 | $ 38,292 | 1 |
2010 | Montgomery | 15.011.10 | Woodlin Elementary | Ceiling and Lighting | Replace damaged and stained original acoustical ceilings system and lighting in Classrooms 1 - 6 and upper corridors. This will capture energy savings and address IAQ complaints. | $ 49,825 | $ 49,825 | $ 49,825 | 1 |
2010 | Montgomery | 15.156.10 | Goshen Elementary | Asphalt Replacement | Play Area in poor condition cracked and heaving causing trip hazards. | $ 26,613 | $ 26,613 | $ 26,613 | 1 |
2010 | Montgomery | 15.159.10 | Capt. James E. Daly Elementary | Sidewalks | Concrete sidewalks are cracked and heaving that is causing a safety concern. | $ 31,282 | $ 31,282 | $ 31,282 | 1 |
2010 | Montgomery | 15.153.10 | Waters Landing Elementary | P.A. System Replacement | Due to repeated failure and inability to secure repair parts. | $ 22,499 | $ 22,499 | $ 22,499 | 1 |
2010 | Montgomery | 15.148.10 | Clopper Mill Elementary | Sidewalks | Concrete sidewalks are cracked and heaving that is causing a safety concern. | $ 15,019 | $ 15,019 | $ 15,019 | 1 |
2010 | Montgomery | 15.122.10 | Highland Elementary | Sidewalks | Concrete sidewalks are cracked and heaving that is causing a safety concern. | $ 14,513 | $ 14,753 | $ 14,753 | 1 |
2010 | Montgomery | 15.088.10 | Montgomery Knolls Elementary | P.A. System Replacement | Due to repeated failure and inability to secure repair parts. | $ 21,247 | $ 21,247 | $ 21,247 | 1 |
2010 | Montgomery | 15.090.10 | Damascus High | P.A. System Replacement | Due to repeated failure and inability to secure repair parts. | $ 31,089 | $ 31,090 | $ 31,090 | 1 |
2010 | Montgomery | 15.164.10 | Brooke Grove Elementary | P.A. System Replacement | Due to repeated failure and inability to secure repair parts. | $ 21,748 | $ 21,748 | $ 21,748 | 1 |
2010 | Montgomery | 15.259.10 | Roberto Clemente Middle | Partitions Replacement | Partitions throughout are in poor conditions and posing a safety and health hazard. | $ 32,835 | $ 32,835 | $ 32,835 | 1 |
2010 | Montgomery | 15.161.10 | Robert Frost Middle | Interior Door Lock Replacements | Original locks worn-out, repeated failure, high maintenance cost and difficulty securing parts. (75% of total building (Old Sections) | $ 38,056 | $ 49,993 | $ 49,993 | 1 |
2010 | Montgomery | 15.126.10 | Wheaton Woods Elementary | Asphalt Replacement | Play Areas in poor condition cracked and heaving causing trip hazards. (Phase 1 of 2) | $ 47,120 | $ 47,120 | $ 47,120 | 1 |
2010 | Montgomery | 15.158.10 | Quince Orchard High | P.A. System Replacement | Due to repeated failure and inability to secure repair parts. | $ 31,089 | $ 31,090 | $ 31,090 | 1 |
2010 | Montgomery | 15.147.10 | Flower Hill Elementary | Partition Replacements | Partitions throughout are in poor conditions and posing a safety and health hazard. | $ 15,462 | $ 15,462 | $ 15,462 | 1 |
2010 | Montgomery | 15.235.10 | Sligo Middle | Ceiling and Lighting | Replace damaged and stained original acoustical ceilings system and lighting in the kitchen. This will capture energy savings and address IAQ and Health Dept. complaints. | $ 24,880 | $ 25,397 | $ 25,397 | 1 |
2010 | Montgomery | 15.019.10 | Seneca Valley High | Interior Door Replacements | Original doors have exceeded their life-cycle and requiring high maintenance cost. Door in poor condition. (Gymnasium Area only) | $ 18,722 | $ 18,722 | $ 18,722 | 1 |
2010 | Montgomery | 15.156.10 | Goshen Elementary | Trash Compactor Replacement | Original compactor worn-out, high maintenance cost, parts have to be custom made. | $ 11,125 | $ 11,125 | $ 11,125 | 1 |
2010 | Montgomery | 15.249.10 | Piney Branch Elementary | Trash Compactor Replacement | Original compactor worn-out, high maintenance cost, parts have to be custom made. | $ 11,125 | $ 11,125 | $ 11,125 | 1 |
2010 | Montgomery | 15.210.10 | Tilden Center | Trash Compactor Replacement | Original compactor worn-out, high maintenance cost, parts have to be custom made. | $ 11,125 | $ 11,125 | $ 11,125 | 1 |
2010 | Montgomery | 15.048.10 | Garrett Park Elementary | Trash Compactor Replacement | Original compactor worn-out, high maintenance cost, parts have to be custom made. | $ 11,125 | $ 11,125 | $ 11,125 | 1 |
2010 | Montgomery | 15.221.10 | Laytonsville Elementary | Asphalt Replacement | Bus loop and area by loading dock in poor condition sink hole cracked and heaving. | $ 30,027 | $ 30,027 | $ 30,027 | 1 |
2010 | Montgomery | 15.238.10 | Redland Middle | Replace Library Security Gate System | Due to repeated failure and inability to secure repair parts. Will improve security and prevent property thefts. | $ 15,000 | $ 10,267 | $ 10,267 | 1 |
2010 | Montgomery | 15.158.10 | Quince Orchard High | Main Entrance Masonry Canopy Repairs | Masonry Canopy is cracking and failing. | $ 28,000 | $ 27,915 | $ 27,915 | 1 |
2010 | Montgomery | 15.011.10 | Woodlin Elementary | Trash Compactor Replacement | Original compactor worn-out, high maintenance cost, parts have to be custom made. | $ 11,125 | $ 11,125 | $ 11,125 | 1 |
2010 | Carroll | 06.002.10 | Northwest Middle | Electrical Equipment Replacement | Electrical system replacement of main switchboard and motor control centers. | $ 157,600 | $ 137,261 | $ 137,261 | 100 |
2010 | Montgomery | 15.042.10 | Ridgeview Middle | Replace Library Security Gate System | Due to repeated failures and inability to secure repair parts. This project will improve security and deter property theft. | $ 10,267 | $ 10,267 | $ 10,267 | 100 |
2010 | Baltimore County | 03.069.10 | Padonia Elementary | HVAC | Remove and replace all three (3) Air Handling Units for the building. | $ 275,000 | $ 184,746 | $ 184,746 | |
2010 | Baltimore County | 03.080.10 | Kingsville Elementary | Lockers | Remove and replace all corridor lockers. | $ 200,000 | $ 52,905 | $ 52,905 | |
2010 | Baltimore County | 03.115.10 | Old Court Middle | Lockers | Remove and replace all lockers. | $ 114,737 | $ 102,237 | $ 102,237 | |
2010 | Baltimore County | 03.122.10 | General John Stricker Middle | Lockers | Remove and replace all lockers. | $ 95,797 | $ 95,797 | $ 95,797 | |
2010 | Prince George's | 16.214.10 | Fort Foote Elementary | Tech Fab Panels | Repair tech fab panels in rooms: 6, 8, 10, 11, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23 and 24. | $ 227,000 | $ 219,500 | $ 219,500 | 1 |
2010 | Prince George's | 16.214.10 | Fort Foote Elementary | Ceiling Tile | Replace metal pan ceiling with 2 x 4 acoustical lay in ceiling tile. Replace lights as needed. | $ 90,000 | $ 88,185 | $ 88,185 | 1 |
2010 | Prince George's | 16.046.10 | Friendly High | Site Work | Resurface and stripe track. | $ 185,000 | $ 206,000 | $ 206,000 | 1 |
2010 | Prince George's | 16.200.10 | Seabrook Elementary | Ceiling Tile | Replace metal pan ceiling with 2 x 4 acoustical lay in ceiling tile. Replace/refinish entrance floor. Replace/refinish doors and woodwork. | $ 36,000 | $ 34,989 | $ 34,989 | 1 |
2010 | Prince George's | 16.094.10 | Buck Lodge Middle | Exterior Repairs | Repair exterior ceramic tile wall system and recaulk building. | $ 25,000 | $ 22,100 | $ 22,100 | 1 |
2010 | Prince George's | 16.049.10 | Lewisdale Elementary | Piping | Phase ll - Piping, insulation and hanger replacement. | $ 143,000 | $ 142,700 | $ 142,700 | 1 |
2010 | Prince George's | 16.008.10 | Dwight D. Eisenhower Middle | Flooring | Replace gym floor. | $ 93,000 | $ 92,217 | $ 92,217 | 1 |
2010 | Prince George's | 16.120.10 | Forest Heights Elementary | Ceiling Tile | Replace 12 x 12 acoustical tile with 2 x 4 lay-in ceiling tile on second floor. | $ 56,000 | $ 54,884 | $ 54,884 | 1 |
2010 | Prince George's | 16.156.10 | Thurgood Marshall Middle | Casework | Replace casework on 1st and 2nd floor. | $ 210,000 | $ 209,780 | $ 209,780 | 1 |
2010 | Prince George's | 16.239.10 | Glenarden Woods Elementary | Ceiling | Replace metal pan ceiling in halls. | $ 46,000 | $ 45,814 | $ 45,814 | 1 |
2010 | Prince George's | 16.001.10 | Gwynn Park High | Ceiling | Replace casework in Family Science Room. | $ 65,000 | $ 64,934 | $ 64,934 | 1 |
2010 | Frederick | 10.032.10 | Kemptown Elementary | Chiller Replacement | Replace chiller that is currently running on only one circuit. | $ 79,539 | $ 77,766 | $ 77,766 | 1 |
2010 | Frederick | 10.034.10 | Monocacy Middle | Boiler Repair | Retube first and second passes of boiler tubes in 200 Horse Power Kewanee Boilers and replace burners for a more energy efficient operation. | $ 58,814 | $ 58,814 | $ 58,814 | 1 |
2010 | Cecil | 07.028.10 | Cecil County School of Technology | Electrical | Replace original motor control center, two associated sub-panels, two transformers, and provide contact points for BAS. | $ 28,400 | $ 28,400 | $ 28,400 | 1 |
2010 | Talbot | 20.010.10 | Easton Elementary - Moton Building | Site Work Paving | Project will add 7,164 sf of new parking area to an existing 8,712 sf paved area. | $ 35,000 | $ 34,020 | $ 34,020 | |
2010 | Kent | 14.006.10 | Garnett Elementary | Playground | Replace wooden playground structures. | $ 44,000 | $ 38,292 | $ 38,292 | 100 |
2010 | Charles | 08.009.10 | Maurice J. McDonough High | P/A System Replacement | Replace existing P/A system with CCPS standard (StarCall® system). | $ 18,530 | $ 18,530 | $ 18,530 | 1 |
2010 | Charles | 08.004.10 | Dr. Gustavus Brown Elementary | P/A System Replacement | Replace existing P/A system with CCPS standard (StarCall® system). | $ 12,955 | $ 12,955 | $ 12,955 | 1 |
2010 | Charles | 08.027.10 | Dr. Thomas L. Higdon E. | P/A System Replacement | Replace existing P/A system with CCPS standard (StarCall® system). | $ 11,985 | $ 11,985 | $ 11,985 | 1 |
2010 | Garrett | 11.002.10 | Friendsville Elementary | Sound System | The sound system and PA is in need of a complete replacement. It is the original system and parts are unavailable. It is not possible to make announcements and change classes using the bell system. | $ 14,000 | $ 13,589 | $ 13,589 | |
2010 | Garrett | 11.006.10 | Broad Ford Elementary | Brick Repair | The bricks are crumbling at the corners of the building due to mortar deterioration and falling from the joints. This is especially dangerous in the access and egress areas of the school. | $ 24,292 | $ 24,292 | $ 24,292 | |
2010 | Cecil | 07.026.10 | Rising Sun Elementary | Casework Replacement | Replace delaminated casework in classrooms. 1991 casework has been de-laminating for years and efforts to re-adhere have repeatedly failed. This project will be the first in a series to replace as many classrooms of casework as funding allows. | $ 60,728 | $ 60,728 | $ 60,728 | 100 |
2010 | Calvert | 04.005.10 | Northern High | Bleacher Replacement | Replace existing wooden bleachers with new motorized aluminum bleachers complete with current ADA provisions. | $ 66,000 | $ 38,292 | $ 38,292 | 100 |
2010 | Worcester | 23.001.10 | Showell Elementary | Lighting Systems/Site Redevelopment | Demo existing 34-year-old site lighting fixtures and replace with new energy efficient 100mh (halogen) pole top fixtures. | $ 16,800 | $ 16,800 | $ 16,800 | 100 |
2010 | Worcester | 23.002.10 | Pocomoke Elementary | Lighting Systems/Site Redevelopment | Demo existing 34-year-old site lighting fixtures and replace with new energy efficient 100mh (halogen) pole top fixtures. | $ 15,200 | $ 15,200 | $ 15,200 | 100 |
2010 | Worcester | 23.008.10 | Snow Hill Elementary | Lighting Systems/Site Redevelopment | Demo existing 31-year-old site lighting fixtures and replace 8 lights with new energy efficient 100mh (halogen) pole top fixtures. | $ 12,300 | $ 12,300 | $ 12,300 | 100 |
2010 | Washington | 21.051.10 | Funkstown Elementary | Window and Door Replacement | Remove and replace 62 existing window frames (408 sf of glass), and 30 existing doors and door frames that were original to the facility. | $ 200,000 | $ 134,904 | $ 134,904 | 100 |
2010 | Montgomery | 15.168.10 | Rosa Parks Middle | VCT Floor Tile | Replace VCT in 60% of the corridors that is badly cracked and loose. | $ 13,855 | $ 13,855 | $ 13,855 | 100 |
2010 | Howard | 13.042.10 | Deep Run Elementary | Flooring | Replace 37,458 sf of the original 1990 carpet. | $ 87,776 | $ 87,776 | $ 87,776 | 100 |
2010 | Baltimore County | 03.001.10 | Pine Grove Middle | Bleachers | Replace gym bleacher. | $ 40,000 | $ 44,410 | $ 44,410 | 1 |
2010 | Baltimore County | 03.147.10 | Deer Park Middle | Bleachers | Replace gym bleacher. | $ 40,000 | $ 46,900 | $ 46,900 | 1 |
2010 | Baltimore County | 03.008.10 | Western School of Technology/Science | Ceiling and Lighting | Replace ceiling and lighting in student Cafeteria and Kitchen. | $ 44,800 | $ 44,800 | $ 44,800 | 1 |
2010 | Baltimore County | 03.181.10 | Winand Elementary | Intercom System | Replace existing intercom system. | $ 40,000 | $ 40,000 | $ 31,000 | 1 |
2010 | Baltimore County | 03.105.10 | Lansdowne Elementary | Flooring | Remove and replace floor tile in 16 classrooms in the North and East wings of the school. | $ 117,862 | $ 117,862 | $ 117,862 | 1 |
2010 | St. Mary's | 18.014.10 | Mechanicsville Elementary | Ceiling and Lighting Replacement | This project will replace the existing ceiling grid and lighting fixtures in (10) ten classrooms. Lighting fixtures will be replaced with updated fixtures to improve lighting fixtures, where applicable to increase the energy efficiency in the building. | $ 50,073 | $ 48,550 | $ 48,550 | 1 |
2010 | Anne Arundel | 02.023.10 | Broadneck Elementary | Flooring | Replace floor tile in Café & Gym. | $ 90,000 | $ 33,916 | $ 33,916 | |
2010 | Anne Arundel | 02.036.10 | West Annapolis Elementary | Flooring | Replace floor tile in Multi - Purpose Room. | $ 50,000 | $ 14,009 | $ 14,009 | |
2010 | Anne Arundel | 02.102.10 | Waugh Chapel Elementary | Flooring | Replace floor tile in Multi - Purpose Room. | $ 50,000 | $ 54,954 | $ 54,954 | |
2010 | Anne Arundel | 02.012.10 | Chesapeake High | Generator | Replace emergency generator. | $ 104,914 | $ 104,914 | $ 104,914 | |
2010 | Anne Arundel | 02.020.10 | Glen Burnie High | Fire Safety | Replace fire alarm system in buildings C & D. | $ 175,000 | $ 134,800 | $ 134,800 | |
2010 | Anne Arundel | 02.093.10 | Brock Bridge Elementary | Fire Safety | Replace fire alarm system. | $ 57,357 | $ 57,357 | $ 57,357 | |
2010 | Frederick | 10.060.10 | Lewistown Elementary | Window and Exterior Door Replacement | Phase I: three (3) store front window units on south side boiler room and kitchen of original building section, one (1) store front window unit on east side corridor on 1967 addition, one (1) store front window unit on west side corridor on 1967 addition, two (2) single exterior door units on south side, one ( 1) double exterior door unit south side of original building, one (1) double exterior door unit on the north side of 1967 addition and all door units to including hardware and continuous hinges. | $ 53,542 | $ 46,042 | $ 46,042 | 1 |
2010 | Wicomico | 22.015.10 | Wicomico Middle | Window Replacement | Remove all of the failing single glazed windows in the 1958 portion of "B" wing and replace with new, more efficient insulated glazed windows. Install new sill flashing and caulk all new window installations. | $ 106,627 | $ 106,627 | $ 106,627 | 100 |
2011 | Carroll | 06.003.11 | Westminster Elementary | Doors | Replace original fire rated doors and associated hardware. | $ 25,400 | $ 25,400 | $ 25,339 | |
2011 | Carroll | 06.036.11 | Westminster West Middle | Doors | Replace original fire rated doors and associated hardware. | $ 64,600 | $ 64,600 | $ 66,894 | |
2011 | Wicomico | 22.012.11 | Northwestern Elementary | Renovation | Renovations to the original 1966/1967 portion of the building: new ceilings, new flooring, new interior lighting fixtures and four (4) ADA toilet room upgrades (two gang toilets and two individual toilets). In the 1992 addition: new ceilings and new interior light fixtures. This is a portion of a larger HVAC renovation project. Project combined with QZAB funding. | $ 333,000 | $ 88,419 | $ 88,419 | |
2011 | Baltimore County | 03.127.11 | Franklin Middle | Stage Lighting | Remove and replace stage lighting and associated controls. | $ 156,000 | $ 138,574 | $ 131,063 | 100 |
2011 | Kent | 14.002.11 | Galena Elementary | Access Control | Provide a new access control system. | $ 29,884 | $ 2,942 | $ 2,942 | |
2011 | Kent | 14.004.11 | Rock Hall Elementary | Access Control | Provide a new access control system. | $ 24,746 | $ 24,746 | $ 24,746 | |
2011 | Kent | 14.003.11 | Kent County Middle | Access Control | Provide a new access control system. Project combined with QZAB funding. | $ 37,066 | $ 4,066 | $ 4,065 | |
2011 | Harford | 12.014.11 | Edgewood Middle | Concrete Replacement | Repair all deteriorated concrete fascia panels surrounding window systems and vents on the entire building. | $ 33,000 | $ 32,825 | $ 32,825 | 100 |
2011 | Allegany | 01.024.11 | Westernport Elementary | Playground Equipment | Replacement of the existing wooden equipment, installed in 1992. The new equipment will be ADA accessible and installed with modular rubber tile fall protection. Project combined with QZAB funding. | $ 160,000 | $ 81,092 | $ 81,092 | |
2011 | Montgomery | 15.052.11 | Burtonsville Elementary | Flooring | Replace the synthetic gym floor. | $ 47,000 | $ 47,000 | $ 42,679 | |
2011 | Montgomery | 15.161.11 | Robert Frost Middle | Windows and Doors | Replace 2 exterior doors and frames and all exterior courtyard fixed windows and frames that are badly rusted causing weather infiltration and compromising security. | $ 144,490 | $ 144,490 | $ 144,490 | |
2011 | Montgomery | 15.103.11 | Damascus Elementary | Windows | Replace 58 exterior windows that are badly rusted causing weather infiltration and compromising security. | $ 54,984 | $ 54,984 | $ 59,424 | |
2011 | Montgomery | 15.224.11 | Mark Twain Spec. Ed. (Blair G. Ewing Center ) | Windows and Doors | Replace 11 exterior doors and frames and 37 exterior windows that are badly rusted causing weather infiltration and compromising security. | $ 99,729 | $ 99,729 | $ 99,729 | |
2011 | Montgomery | 15.063.11 | Newport Mills Middle | Site Work | Site restoration of multi-purpose field to correct major erosion and drainage problems. | $ 41,371 | $ 41,371 | $ 41,371 | |
2011 | Montgomery | 15.231.11 | Argyle Middle | Asphalt Replacement | Replace asphalt on basketball courts that are in poor condition with major cracks and loose asphalt that is causing safety issues. This will include asphalt line painting as required. | $ 24,606 | $ 24,606 | $ 24,576 | |
2011 | Montgomery | 15.022.11 | Benjamin Banneker Middle | Asphalt Replacement | Replace asphalt on basketball courts that are in poor condition with major cracks and loose asphalt that is causing safety issues. This will include asphalt line painting as required. | $ 20,436 | $ 20,436 | $ 20,436 | |
2011 | Montgomery | 15.135.11 | Sherwood High | Windows and Doors | Replace 16 exterior doors and frames and 16 exterior window lights along side of door units that are badly rusted causing weather infiltration and compromising security. | $ 47,696 | $ 47,696 | $ 47,802 | |
2011 | Montgomery | 15.156.11 | Goshen Elementary | Partitions | Replace all restroom toilet partitions. | $ 19,234 | $ 19,234 | $ 19,234 | |
2011 | Washington | 21.001.11 | Boonsboro High | Bleachers | Remove and replace 35-year-old, manually operated, wood gym bleachers (installed in 1975) that require frequent repair with new, motorized, resin bleachers. Work will consist of demolition of the existing bleachers, electrical work, floor work, and installation of the new bleacher assembly. | $ 85,000 | $ 50,000 | $ 50,000 | |
2011 | Washington | 21.017.11 | Northern Middle | Underground Fuel Tank Replacement | Replace existing 30 old underground fuel oil tank (installed in 1980), including all piping and test all surrounding soils for residual contamination and mitigate if necessary. Install new above ground fuel oil tank, including all grading, concrete, retaining walls, piping, fuel oil pumps, etc. | $ 120,000 | $ 61,867 | $ 61,867 | |
2011 | Cecil | 07.026.11 | Rising Sun Elementary | Casework Replacement (Phase II) | Replace 1991 delaminated casework in classroom # 3. | $ 21,000 | $ 21,000 | $ 19,800 | 100 |
2011 | Cecil | 07.040.11 | North East High | Food Lab Renovation | Replace casework, sinks, ceilings, and flooring in food lab. Remove wallpaper and paint. Provide exhaust from room (currently return air goes to plenum). | $ 45,000 | $ 45,000 | $ 45,000 | 100 |
2011 | Talbot | 20.007.11 | White Marsh Elementary | Playground Equipment | Replace existing 30-year-old playground. | $ 38,500 | $ 38,292 | $ 38,292 | 100 |
2011 | Prince George's | 16.110.11 | Charles Carroll Middle | Ceiling | Replace metal pan ceiling in rooms 300 - 312, the 300 corridor, rooms 200 - 204 and the 200 corridor. | $ 105,000 | $ 104,756 | $ 104,756 | 1 |
2011 | Prince George's | 16.033.11 | Crossland High | Ceiling | Replace metal pan ceiling in all rooms in the 200 wing (200-233) and hallways. | $ 90,000 | $ 90,000 | $ 89,557 | 1 |
2011 | Prince George's | 16.120.11 | Forest Heights Elementary | Ceiling | Replace metal pan ceiling in rooms 109 and 210. | $ 16,000 | $ 16,000 | $ 15,975 | 1 |
2011 | Prince George's | 16.156.11 | Thurgood Marshall Middle | Casework | Replace wooden casework in rooms: 104 - 106, 108 - 110, 112, 121, 127 - 129, 201 - 204, 208, 209, and 214. | $ 154,000 | $ 153,326 | $ 153,326 | 1 |
2011 | Prince George's | 16.001.11 | Gwynn Park High | Ceiling and Lighting | Replace ceiling tiles, remove and replace lights in the Main Office, Principal and Vice Principal's Offices, Rooms 114 - 117, 120 -123, 127 - 137, 150, library, staff offices, studio, control room, 202, 204, 205, 207, 209, 211, 213, 215, 217, 219, 221, 225, 229, 233, 238, 246, 248, and 2nd floor corridor. | $ 70,000 | $ 70,000 | $ 70,000 | 1 |
2011 | Prince George's | 16.214.11 | Fort Foote Elementary | Panels | Replace 33 tech fab panels in rooms: 1-5, 7, 9, 11, 13, 15, resource room, media center, and multi-purpose room. | $ 163,000 | $ 162,387 | $ 162,387 | 1 |
2011 | Prince George's | 16.214.11 | Fort Foote Elementary | Ceiling | Replace metal pan ceiling in rooms: 1-5, Main Office, and Principal's Office. | $ 35,000 | $ 35,000 | $ 34,650 | 1 |
2011 | Prince George's | 16.194.11 | Duval High | Flooring | Replace gym floor. | $ 137,000 | $ 136,895 | $ 136,895 | 1 |
2011 | Prince George's | 16.046.11 | Friendly High | Cabinets | Replace cabinets in rooms 104 and 105. | $ 85,000 | $ 85,000 | $ 84,349 | 1 |
2011 | Prince George's | 16.119.11 | Pointer Ridge Elementary | Storefront | Replace metal storefront (panel wall) on rear of two wings. | $ 66,000 | $ 66,000 | $ 65,778 | 1 |
2011 | Prince George's | 16.128.11 | John Hanson Elementary/Middle | Flooring | Replace gym floor. | $ 82,000 | $ 82,000 | $ 81,690 | 1 |
2011 | Anne Arundel | 02.120.11 | Woodside Elementary | Ceiling and Lighting | Replace ceilings, lighting and remove asbestos. | $ 187,000 | $ 92,170 | $ 112,578 | 100 |
2011 | Anne Arundel | 02.008.11 | Linthicum Elementary | Asphalt Replacement Phase I | Partially replace failed asphalt in parking lot and play area, overlay entire lot, and repair storm drain. | $ 82,000 | $ 77,700 | $ 98,216 | 100 |
2011 | Baltimore County | 03.104.11 | Hebbville Elementary | Flooring | Remove floor tile and replace with a renewable tile product for entire school. | $ 278,411 | $ 263,411 | $ 288,994 | 100 |
2011 | Baltimore County | 03.079.11 | Oliver Beach Elementary | Clock System | Replace existing clock and bell systems. | $ 60,000 | $ 60,000 | $ 45,900 | 100 |
2011 | Baltimore County | 03.057.11 | Victory Villa Elementary | HVAC | Install air conditioning system for computer classroom. | $ 50,000 | $ 51,782 | $ 47,906 | 100 |
2011 | Queen Anne's | 17.004.11 | Centreville Middle | Flooring | Replace carpet with tile in 21 classrooms and replace carpet in the band room and autism room. Carpet continues to cause indoor air quality issues in the classroom and this carpet needs to be replaced. | $ 55,000 | $ 50,073 | $ 50,073 | 100 |
2011 | Baltimore County | 03.011.11 | Perry Hall High | Auditorium | Replace operable partition in auditorium and replace portions of existing fixed auditorium seating. | $ 100,000 | $ 99,875 | $ 99,875 | 100 |
2011 | Calvert | 04.005.11 | Northern High | Chiller Replacement | The 150 ton air cooled chiller is losing refrigerant and the supports for the chiller barrel have rusted out. The project will include replacing the chiller, adding a heat exchanger and two sets of pumps. | $ 225,000 | $ 38,292 | $ 38,292 | 100 |
2011 | Caroline | 05.001.11 | Greensboro Elementary | Site Work | Repave existing bus loop. | $ 45,000 | $ 41,522 | $ 32,579 | 100 |
2011 | Carroll | 06.038.11 | Friendship Valley Elementary | Doors | Replace twenty-five (25) doors, frames, and associated hardware located: A013, 113A, 113B, 115, A07, C04 and C05. | $ 44,000 | $ 44,000 | $ 45,028 | 100 |
2011 | Worcester | 23.011.11 | Pocomoke Middle | Site Lighting | Demo existing 41-year-old site lighting (wiring only) for 17 lights located in the visitor and staff parking lot. | $ 18,000 | $ 18,000 | $ 18,000 | 100 |
2011 | Worcester | 23.008.11 | Snow Hill Elementary | Site Lighting | Replace 13 existing 32-year-old site lighting fixtures and replace with new energy efficient 100mh (halogen) pole top fixtures. | $ 11,500 | $ 11,500 | $ 11,500 | 100 |
2011 | Somerset | 19.014.11 | Greenwood Elementary | Parking Lot | Expand parking lot. | $ 55,000 | $ 31,753 | $ 31,753 | 100 |
2011 | Charles | 08.016.11 | Matthew Henson Middle | Clock System | This project will provide an Ethernet-wired master clock which can be remotely programmed and wireless clocks with buzzers throughout the building. | $ 10,053 | $ 10,053 | $ 10,053 | 100 |
2011 | Charles | 08.023.11 | Mt. Hope/Nanjemoy Elementary | Clock System | This project will provide an Ethernet-wired master clock which can be remotely programmed and wireless clocks with buzzers throughout the building. | $ 10,115 | $ 10,115 | $ 10,115 | 100 |
2011 | Charles | 08.008.11 | Indian Head Elementary | Clock System | This project will provide an Ethernet-wired master clock which can be remotely programmed and wireless clocks with buzzers throughout the building. | $ 10,088 | $ 10,088 | $ 10,088 | 100 |
2011 | Charles | 08.025.11 | Daniel of St. Thomas Jenifer Elementary | Clock System | This project will provide an Ethernet-wired master clock which can be remotely programmed and wireless clocks with buzzers throughout the building. | $ 10,088 | $ 10,088 | $ 10,088 | 100 |
2011 | Garrett | 11.008.11 | Southern Middle | Asphalt Replacement | Repair original parking lot pavement, any "soft" spots, and overlay the entire lot with asphalt and striping. | $ 32,000 | $ 31,753 | $ 31,000 | 100 |
2011 | Frederick | 10.039.11 | Hillcrest Elementary | Network Infrastructure | Purchase necessary materials to upgrade technology infrastructure in each classroom to support enhancements for Title I school programs. | $ 36,000 | $ 30,624 | $ 30,591 | 100 |
2011 | Frederick | 10.060.11 | Lewistown Elementary | Windows and Doors | Replace one (1) rusting and deteriorated hollow metal door and frame unit on north end main corridor and three (3) sets of store front window units, two on east side and one on west side of building along main corridors. | $ 49,000 | $ 39,389 | $ 39,389 | 100 |
2011 | Frederick | 10.040.11 | Monocacy Elementary | Doors | Install new security doors and frames. | $ 12,000 | $ 11,992 | $ 11,992 | 100 |
2011 | Frederick | 10.038.11 | New Midway Elementary | Windows | Replace original rusting and deteriorating non-insulated single pane windows and frames and storm window coverings. | $ 24,000 | $ 24,997 | $ 24,997 | 100 |
2011 | Baltimore County | 03.147.11 | Deer Park Middle | Folding Partition | Remove and replace an operable wall system in cafeteria. | $ 45,000 | $ 45,000 | $ 64,213 | 100 |
2011 | Baltimore County | 03.147.11 | Deer Park Middle | Intercom System | Remove and replace existing intercom system. | $ 80,000 | $ 80,000 | $ 46,991 | 100 |
2011 | Harford | 12.021.11 | Magnolia Middle | Masonry Walls | Installation of expansion and control joints in masonry walls of gym and activity room. | $ 29,000 | $ 28,410 | $ 28,410 | 100 |
2011 | Harford | 12.002.11 | Magnolia Elementary | Asphalt Replacement | Resurfacing the entire parking lot and bus loop. | $ 118,000 | $ 119,024 | $ 119,024 | 100 |
2011 | Dorchester | 09.009.11 | Cambridge-South Dorchester High | Doors | Replace existing main entrance single doors. | $ 25,000 | $ 20,000 | $ 18,615 | 100 |
2011 | Dorchester | 09.005.11 | Vienna Elementary | Playground Resurface | Remove large cypress tree growing in paved play area, repave and resurface area. | $ 25,000 | $ 11,753 | $ 11,753 | 100 |
2011 | Anne Arundel | 02.122.11 | Arlington Echo Education Center | Roofing and Siding | Replace water damaged fascia's and repair rain gutters for (2) sleeping cottage shingle roofs. Replace water damaged siding (T1-11) on the garage and dining hall. | $ 25,000 | $ 25,000 | $ 18,391 | 100 |
2011 | Anne Arundel | 02.051.11 | Corkran Middle | Exterior Doors | Provide and install aluminum insert frame with continuous hinge and capping over existing steel jamb. Replace door slabs and install new door hardware. | $ 25,000 | $ 25,000 | $ 24,917 | 100 |
2011 | Anne Arundel | 02.051.11 | Corkran Middle | Sidewalks and Curbs | Replace deteriorated concrete sidewalk, curb and gutter, install new handicap curb cuts and bring existing handicap curb cuts to current ADA standards. | $ 80,000 | $ 80,000 | $ 79,550 | 100 |
2011 | Anne Arundel | 02.007.11 | Magothy River Middle | Sidewalks and Curbs | Replace deteriorated concrete sidewalk, curb and gutter, install new handicap curb cuts and bring existing handicap curb cuts to current ADA standards. | $ 49,122 | $ 35,878 | $ 42,480 | 100 |
2011 | Anne Arundel | 02.096.11 | Severn River Middle | Sidewalks and Curbs | Replace deteriorated concrete sidewalk, curb and gutter, install new handicap curb cuts and bring existing handicap curb cuts to current ADA standards. | $ 49,122 | $ 35,878 | $ 42,480 | 100 |
2011 | Cecil | 07.040.11 | North East High | Restroom Renovation | Replace fixtures, tile floors, partitions in boys and girls gang toilet rooms on 1st floor D Block. | $ 13,627 | $ 13,627 | $ 12,480 | 100 |
2011 | St. Mary's | 18.002.11 | Spring Ridge Middle | Doors | Replace 13 sets of exterior doors in kind utilizing the existing door frames. | $ 49,900 | $ 41,522 | $ 41,522 | 1 |
2011 | Frederick | 10.005.11 | Middletown High | Kitchen Equipment | Kitchen Equipment - Replacement of original 1974 commercial dishwasher unit in food preparation area. The original piece of equipment has ceased to operate and repair and replacement parts are no longer available. The replacement unit is spaced around a Hobart, model CLCS66e. Replacement equipment will allow continuation of food service operations in a primary food preparation kitchen facility that services both Middletown High and 5 additional satellite facilities. (See attached photos and documents.) | $ 60,000 | $ 44,435 | $ 44,435 | |
2011 | Baltimore City | 30.176.11 | Lyndhurst PK-5 #088 | Underground Storage Tank | Provide required heating fuel system equipment upgrades including new 10,000-gallon double wall steel underground tank and double wall piping system. | $ 275,955 | $ 275,955 | $ 275,955 | |
2011 | Baltimore City | 30.199.11 | Edgecombe Circle PK-8 #062 | Underground Storage Tank | Provide required heating fuel system equipment upgrades including new 10,000 gallon double wall steel underground tank and double wall piping system. | $ 236,433 | $ 236,433 | $ 236,432 | |
2011 | Baltimore City | 30.262.11 | Edgewood PK-5 #067 | Underground Storage Tank | Provide required heating fuel system equipment upgrades including new 10,000 gallon double wall steel underground tank and double wall piping system. | $ 229,578 | $ 229,578 | $ 229,577 | |
2011 | Baltimore City | 30.208.11 | Steuart Hill PK-8 #004 | Aboveground Storage Tank | Provide and install 1 new 2,000-gallon double wall steel ballistic fire rated above ground oil tank system. | $ 79,344 | $ 79,344 | $ 79,343 | |
2011 | Baltimore City | 30.144.11 | Tench Tilghman Elementary/Middle #013 | Underground Storage Tank | Provide required heating fuel system equipment upgrades including new 2,500 gallon double wall steel underground tank and double wall piping system. | $ 143,885 | $ 143,885 | $ 143,884 | |
2011 | Baltimore City | 30.198.11 | Coldstream Park Elementary #031 | Intercom System Replacement | $ 21,100 | $ 21,100 | $ 21,061 | ||
2011 | Baltimore City | 30.205.11 | Yorkwood Elementary #219 | Intercom System Replacement | Replace intercom system. | $ 23,300 | $ 23,300 | $ 23,187 | |
2011 | Baltimore City | 30.018.11 | Charles Carroll Barrister Elementary #034 | Intercom System Replacement | Replace intercom system. | $ 17,900 | $ 17,900 | $ 17,838 | |
2011 | Baltimore City | 30.022.11 | Montebello PK-8 #044 | Intercom System Replacement | Replace intercom system. | $ 19,700 | $ 19,700 | $ 19,580 | |
2011 | Baltimore City | 30.181.11 | Francis Scott Key Elementary/Middle #076 | Intercom System Replacement | $ 17,300 | $ 17,300 | $ 17,293 | ||
2011 | Baltimore City | 30.086.11 | John Ruhrah PK-8 #228 | Intercom System Replacement | $ 20,300 | $ 20,300 | $ 19,976 | ||
2011 | Baltimore City | 30.148.11 | Fallstaff PK-8 #241 | Ceiling | Removal and installation of ceiling tiles and grids in 1010 main office, 101 inner main office, store main office, faculty lounge, eastside entry vestibule, auditorium, entry level hallway, room 104, 108-1, 108-5, 108-7, 108-9, 108-10, 108-12, 108-13, 108-14, library and rooms 109, 111, 112, 113, 114, 117, Mr. B ESOL room, boys restroom, girls restroom, lower level hallway, 200, 202-1, 202-2, 203, 204, second floor hallway and north stairway. | $ 19,887 | $ 19,887 | $ 18,270 | |
2011 | Baltimore City | 30.022.11 | Montebello PK-8 #044 | Gymnasium | Strip the floor and walls, repair floor boards as identified, restripe basketball court, refinish floor, paint and install safely padding in end zones. | $ 38,000 | $ 38,000 | $ 37,875 | |
2012 | Baltimore County | 03.075.12 | Eastern Technical High | Exterior Stairs/Railings | Remove and replace exterior concrete stairs and railings at front entrance. | $ 28,500 | $ 28,500 | $ 28,500 | 100 |
2012 | Charles | 08.012.12 | F.B. Gwynn Center | Communication System | Replace Public Address system | $ 15,240 | $ 15,240 | $ 15,240 | 100 |
2012 | Charles | 08.028.12 | William B. Wade Elementary | Communication System | Replace Public Address system | $ 18,750 | $ 18,750 | $ 18,750 | 100 |
2012 | Charles | 08.034.12 | C. Paul Barnhart Elementary | Communication System | Replace Public Address system | $ 16,610 | $ 16,610 | $ 16,610 | 100 |
2012 | Charles | 08.016.12 | Matthew Henson Middle | Communication System | Replace Public Address system | $ 18,605 | $ 18,605 | $ 18,605 | 100 |
2012 | Kent | 14.001.12 | Millington Elementary | Access Control System | Install new access control system | $ 23,100 | $ 22,362 | $ 22,362 | 100 |
2012 | Kent | 14.008.12 | Worton Elementary | Access Control System | Install new access control system | $ 31,600 | $ 31,600 | $ 31,600 | 100 |
2012 | Baltimore County | 03.149.12 | Lansdowne High | Plumbing | The water service between the water meter (at the street) and building is original (1963) to the school and there has been water infiltrating paved areas indicating the line is leaking. A new line for existing domestic use and future sprinkler system will be designed and installed. | $ 214,876 | $ 214,876 | $ 214,876 | 1 |
2012 | Baltimore County | 03.147.12 | Deer Park Magnet Middle | Window and Exterior Door Replacement | Replace windows and exterior doors. | $ 611,000 | $ 596,000 | $ 596,000 | 1 |
2012 | Baltimore County | 03.080.12 | Kingsville Elementary | Health Suite ADA Renovation | Reconfiguration of toilet room, mechanical system and program open space; including electrical upgrades. Replace plumbing fixtures and domestic water piping. | $ 223,150 | $ 193,635 | $ 193,635 | 1 |
2012 | Baltimore City | 30.191.12 | Brehms Lane Elementary #231 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 24,200 | $ 24,119 | $ 24,119 | 1 |
2012 | Baltimore City | 30.202.12 | City Springs PK-8 #008 | Underground Storage Tank Replacement | Removal and replacement of the 10,000 gallon underground storage tank and replace with 4,000 gallon underground storage tank. Provide required heating fuel system equipment upgrades including new double wall steel underground tank and double wall piping system. | $ 225,000 | $ 218,319 | $ 218,319 | 1 |
2012 | Baltimore City | 30.204.12 | Dr. Bernard Harris Sr. Elementary #250 | Fire Alarm Replacement | To provide a new Notifier fire alarm system. Provide, install and test a Notifier addressable NFW 100 fire alarm panel with a built in digital communications dialer. Also provided is, LCD 80 character annunciator (Main Entrance) smoke detectors, heat detectors, pull stations, horn strobes, strobes, monitor modules for flows, tampers and kitchen hood suppression system. New cabling conduit and back boxes will be provided. | $ 47,000 | $ 44,529 | $ 44,529 | 1 |
2012 | Baltimore City | 30.219.12 | Fairmount-Harford Institute #456 | Asphalt and Concrete Replacement | Remove the existing deteriorated roadway and parking lot to a depth of eleven 11". Replace with a total of 6" of RC-6 aggregate base, and a total of 5" of HMA (3" of 19 MM base course, and 2" of 12.5MM surface course.) This area which extends approximately 74' estimated, or behind the face of the school is approximately 1,142 yards. | $ 55,000 | $ 47,155 | $ 47,155 | 1 |
2012 | Baltimore City | 30.256.12 | Furley Elementary #206 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 21,700 | $ 21,637 | $ 21,637 | 1 |
2012 | Baltimore City | 30.261.12 | Gwynns Falls Elementary #060 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 21,100 | $ 21,093 | $ 21,093 | 1 |
2012 | Baltimore City | 30.240.12 | Holabird Elementary PK-8 #229 | Intercom System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 17,400 | $ 17,353 | $ 17,353 | 1 |
2012 | Baltimore City | 30.159.12 | Maree G. Farring PK-8 #203 | Intercom System Replacement | Provide and install Bogen Multicom 96 intercom system for administrative and classroom paging. | $ 24,300 | $ 24,263 | $ 24,263 | 1 |
2012 | Baltimore City | 30.258.12 | Medfield Heights Elementary #249 | Asphalt, Sidewalk, and Curb Replacement | Remove and replace concrete sidewalk with 5" concrete sidewalks. These areas total approximately 4,991 sf. Remove and replace deteriorated wheelchair ramp, approximately 50 sf. Remove and replace deteriorated Type "A" concrete curb, 20" x 8", approximately 212 lf. Furnish and install detectable warning surface, 2' x 4', in new wheelchair ramp. Remove and replace deteriorated portion of asphalt entrance road, 4" depth. This area is approximately 191 square yards. Furnish and install new bituminous concrete base, 3" depth, in this area. Resurface the entrance road and an additional 363 square yards. With surface course bituminous concrete averaging 1 1/2" in compacted depth. This area is a total of 554 square yards. | $ 76,000 | $ 75,910 | $ 75,910 | 1 |
2012 | Baltimore City | 30.069.12 | Mt. Royal Elementary/Middle #066 | Gymnasium Resurfacing, Lining and Painting | Scrape and refinish wood baseboard at perimeter of gym, remove floor plates and patch wood flooring, repair boards in various areas as needed, sand gym floor, seal floor Maple Flooring Manufacturers’ Association(MFMA) approved sealer, apply 2-coats MFMA approved gym finish to floor. Layout and paint game lines (standard e. school layout). Volleyball court shall be regulation size, add badminton court. Paint walls. | $ 30,000 | $ 19,221 | $ 19,221 | 1 |
2012 | Baltimore City | 30.229.12 | Northwood Elementary #242 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 22,100 | $ 22,093 | $ 22,093 | 1 |
2012 | Baltimore City | 30.038.12 | Sarah M. Roach PK-5 #073 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 22,300 | $ 22,229 | $ 22,229 | 1 |
2012 | Baltimore City | 30.155.12 | Sharp-Leadenhall Sp. Ed. #314 | Underground Storage Tank Replacement | Removal and replacement of the 10,000 gallon underground storage tank. Provide required heating fuel system equipment upgrades including new double wall steel underground tank and double wall piping system. | $ 230,000 | $ 223,911 | $ 223,911 | 1 |
2012 | Baltimore City | 30.193.12 | Sinclair Lane Elementary #248 | Asphalt Replacement | Mill 3" off entire parking lot. Repave entire parking lot with surface course Hot Mix Asphalt averaging 3" in compacted thickness. This area is approximately 1,097 square yards. Repaint pavement markings onto new surface similar to existing parking layout. | $ 30,000 | $ 31,220 | $ 31,220 | 1 |
2012 | Baltimore City | 30.228.12 | Southside Building #181/Carter Woodson | Underground Storage Tank Replacement | Removal and replacement of two (2) 10,000 gallon underground storage tanks. Provide required heating fuel system equipment upgrades including new double wall steel underground tank and double wall piping system. | $ 325,000 | $ 320,198 | $ 320,198 | 1 |
2012 | Baltimore City | 30.228.12 | Southside Building #181/New Era Complex | Asphalt and Concrete Replacement | Remove and replace existing deteriorated concrete curb and gutter along main driveway (@250 LF). Remove the first 606 LF. Beginning from the main entrance driveway at Cherry Hill Rd., to a depth of 5". Also remove the road to the left or south side of the school, to a depth of 5". This road is approximately 199 LF by 18' wide. Repave these two sections of roadway with a total of 5" of Hot Mix Asphalt (HMA), 3" 19 MM base course and 2" of 12.5 MM surface course. These areas total approximately 1,609 square yards. At the rear area behind the school, mill perimeter of proposed paving area along all curbs and utility structures to allow for proper tie-ins. Resurface the area with Hot Mix Asphalt averaging 2 1/2" in compacted thickness. This area is approximately 1,891 square yards. | $ 90,000 | $ 89,880 | $ 89,880 | 1 |
2012 | Baltimore City | 30.228.12 | Southside Building #181/New Era #422 Complex | Fire Alarm Replacement | Install a new Notifier 320 fire alarm system. This system is a one for one replacement of the old fire alarm system to include fire alarm panel, fire alarm LED annunciator, pull stations, smoke detectors, heat detectors, horn strobes and relay modules for the magnetic door holders. All existing wiring and conduits will be reused. | $ 95,000 | $ 95,000 | $ 54,957 | 1 |
2012 | Baltimore City | 30.040.12 | William H. Lemmel Building #079 | Underground Storage Tanks Replacement | Removal and replacement of two (2) 10,000 gallon underground storage tanks. Provide required heating fuel system equipment upgrades including new double wall steel underground tank and double wall piping system. | $ 340,000 | $ 333,690 | $ 333,690 | 1 |
2012 | Baltimore City | 30.108.12 | William S. Baer Sp. Ed. PK-12 #301 | Asphalt and Concrete Replacement | Including the parking area, prepare the lots for asphalt resurfacing and additional parking spots. This will include removal of and need for base repair, milling along the perimeter of the lot to tie in properly to existing sidewalks and adjacent pavements. Resurface this lot with surface course asphalt averaging 2" in compacted thickness. | $ 38,000 | $ 48,578 | $ 49,578 | 1 |
2012 | Baltimore City | 30.238.12 | Patapsco PK-8 #163 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 22,500 | $ 22,496 | $ 22,496 | 1 |
2012 | Harford | 12.001.12 | Fallston High | Hot Water Storage Tank | Replace the existing hot water storage tank unit. | $ 87,179 | $ 87,179 | $ 87,179 | 1 |
2012 | Harford | 12.017.12 | Jarrettsville Elementary | Emergency Generator | Replace the existing emergency generator. | $ 30,000 | $ 30,000 | $ 30,000 | 1 |
2012 | Montgomery | 15.231.12 | Argyle Middle | Public Address System Replacement | Due to repeated failures and inability to secure repair parts. | $ 19,284 | $ 19,284 | $ 19,284 | 1 |
2012 | Montgomery | 15.224.12 | Mark Twain Spec. Ed. (Blair G. Ewing Center ) | Exterior Lighting | Replace all exterior lighting including: wall and pole mounted light fixtures that are in poor condition and beyond their life-cycle and have become high maintenance items. Replace 17 parking lot lighting steel poles that are badly rusted and a safety hazard with new aluminum poles. | $ 28,150 | $ 26,999 | $ 26,999 | 1 |
2012 | Montgomery | 15.103.12 | Damascus Elementary | Exterior Window Replacement - Phase 2 of 4 | Replace original windows that are rusted out and causing water and air infiltration. The new windows will be high energy-efficient upgraded thermo panes (25% of the Southeast side of Building ). | $ 75,840 | $ 75,840 | $ 75,840 | 1 |
2012 | Montgomery | 15.103.12 | Damascus Elementary | Asphalt Replacement | Replace asphalt in front bus circle and re-striping of new asphalt as required. | $ 47,611 | $ 47,611 | $ 47,611 | 1 |
2012 | Montgomery | 15.051.12 | Darnestown Elementary | Ceiling/Lighting Replacement | Replace the original acoustical ceiling system and light fixtures that are in poor condition and require a high degree of maintenance. (All Purpose Room and Computer Lab) | $ 18,024 | $ 17,359 | $ 17,359 | 1 |
2012 | Montgomery | 15.169.12 | Dr. Charles R. Drew Elementary | Exterior Window Replacement Phase 1 of 4 | Replace original windows that are rusted out causing water and air infiltration. The new windows will be high energy-efficient upgraded thermo panes (25% of the North side of the building). | $ 47,975 | $ 47,975 | $ 47,975 | 1 |
2012 | Montgomery | 15.020.12 | Fields Road Elementary | Public Address System Replacement | Replace the Public Address System, due to repeated failures and inability to secure repair parts. | $ 17,664 | $ 17,664 | $ 17,664 | 1 |
2012 | Montgomery | 15.147.12 | Flower Hill Elementary | Exterior Window Replacement Phase 3 of 5 | Replace original windows that are rusted out and causing water and air infiltration. The new windows will be high energy-efficient upgraded thermo panes (30 % of the East side of Building). | $ 89,803 | $ 89,803 | $ 89,803 | 1 |
2012 | Montgomery | 15.182.12 | John T. Baker Middle | Ceiling and Lighting Replacement Phase I | Replace the original acoustical ceiling system and light fixtures in the lower level corridor and cafeteria that are in poor condition and require a high degree of maintenance. | $ 78,621 | $ 78,621 | $ 78,621 | 1 |
2012 | Montgomery | 15.194.12 | Maryvale Elementary | Sidewalk Replacement | Repair cracked and heaving concrete sidewalks. | $ 27,967 | $ 27,967 | $ 27,967 | 1 |
2012 | Montgomery | 15.236.12 | North Lake Center | Asphalt Replacement | Replace asphalt in rear play area and re-striping of new asphalt as required. | $ 14,842 | $ 14,842 | $ 14,842 | 1 |
2012 | Montgomery | 15.140.12 | Oakland Terrace Elementary | Trash Compactor Replacement | Replace original worn-out compactor. | $ 10,565 | $ 10,565 | $ 10,565 | 1 |
2012 | Montgomery | 15.066.12 | Poolesville High | Public Address System Replacement | Replace the Public Address system, due to repeated failures and inability to secure repair parts. | $ 23,467 | $ 23,467 | $ 23,467 | 1 |
2012 | Montgomery | 15.237.12 | Radnor Center | Exterior Door Replacement | Replace original rusted out exterior doors in rooms 6, 10 and 11, that are causing security concerns and water and air infiltration. The new doors will be an energy-efficient upgrade with full perimeter weather-striping. | $ 25,074 | $ 25,074 | $ 25,074 | 1 |
2012 | Montgomery | 15.259.12 | Roberto Clemente Middle | Trash Compactor Replacement | Replace original worn-out compactor. | $ 11,469 | $ 11,459 | $ 11,459 | 1 |
2012 | Montgomery | 15.235.12 | Sligo Middle | Public Address System Replacement | Due to repeated failures and inability to secure repair parts. | $ 23,462 | $ 23,462 | $ 23,462 | 1 |
2012 | Montgomery | 15.039.12 | Stedwick Elementary | Public Address System Replacement | Replace the Public Address System, due to repeated failures and inability to secure repair parts. | $ 21,209 | $ 21,209 | $ 21,209 | 1 |
2012 | Montgomery | 15.252.12 | Stonegate Elementary | Public Address System Replacement | Replace the Public Address system, due to repeated failures and inability to secure repair parts. | $ 26,054 | $ 26,054 | $ 26,054 | 1 |
2012 | Montgomery | 15.218.12 | Strathmore Elementary | Asphalt Replacement | Replace asphalt in all parking lots and play areas. Project includes re-striping new asphalt as required. | $ 52,947 | $ 52,947 | $ 52,947 | 1 |
2012 | Montgomery | 15.174.12 | Summit Hall Elementary | Asphalt Replacement | Replace asphalt in all parking lots and play areas. Project includes re-striping new asphalt as required. | $ 20,549 | $ 20,549 | $ 20,549 | 1 |
2012 | Montgomery | 15.081.12 | Takoma Park Elementary | Trash Compactor Replacement | Replace original worn-out compactor. | $ 10,565 | $ 10,565 | $ 10,565 | 1 |
2012 | Montgomery | 15.142.12 | Thomas Edison High | Trash Compactor Replacement | Replace original worn-out compactor. | $ 10,565 | $ 10,565 | $ 10,565 | 1 |
2012 | Montgomery | 15.166.12 | Watkins Mill High | P.A. System Replacement | Replace the Public Address system, due to repeated failures and inability to secure repair parts. | $ 30,371 | $ 30,371 | $ 30,371 | 1 |
2012 | Montgomery | 15.143.12 | Woodfield Elementary | Asphalt Replacement | Replace asphalt in all play areas. Project includes re-stripping new asphalt as required. | $ 24,360 | $ 24,360 | $ 24,360 | 1 |
2012 | Montgomery | 15.011.12 | Woodlin Elementary | Exterior Door Replacement | Replace original rusted out exterior doors in rooms 1 to 16 that are causing security concerns and water and air infiltration. The new doors will be an energy-efficient upgrade with full perimeter weather-stripping (Rooms 1 to 16). | $ 94,666 | $ 94,666 | $ 94,666 | 1 |
2012 | Baltimore City | 30.137.12 | Northeast Middle #049 | Intercom System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 25,000 | $ 24,969 | $ 24,969 | 1 |
2012 | Baltimore City | 30.237.12 | West Baltimore Building #080 | Asphalt, Sidewalk, and Curb Replacement | Remove the existing deteriorated roadway to a depth of 11". Replace with 6" of RC-6 aggregate base, and a total of 5" of Hot Mix Asphalt (3" of 19 MM base course, and 2" of 12.5 MM surface course). This area is an "L" shaped road extending from North Bend Road around to the parking lot of W. Baltimore Middle School. It is approximately 495' long by 15' wide. | $ 46,000 | $ 58,100 | $ 58,100 | 1 |
2012 | Baltimore City | 30.251.12 | Pimlico PK-8 #223 | Asphalt and concrete dumpster and parking area replacement (rear) | Prepare the lot for asphalt resurfacing. This will include approximately 250 square yards of base repair, milling along the perimeter of the lot to tie in properly to existing sidewalks and adjacent pavements. Resurface this lot with surface course asphalt averaging 2" in compacted thickness. This lot is approximately 3,116 square yards. The project includes the area up to the southeast corner of the school. Remove the existing deteriorated and broken concrete parking bumpers and replace with approximately 48 new parking bumpers. Pavement markings will be reapplied. Dumpster Area - Mill this area's perimeter to prepare for a Hot Mix Asphalt resurfacing. The project includes removing the existing asphalt around the inlets, in front of doors, and at limits of the proposed resurfacing. Excavate proposed concrete dumpster pad area to a depth of 14". Furnish and install 6" RC-6 aggregate sub base. Install concrete dumpster pad. This pad will be 8" thick with wire mesh reinforcement. High-early strength concrete will be used in order to minimize dumpster relocation time. The proposed pad will be 24' W x 30 ' D or 80 yards. Furnish and install a Hot Mix Asphalt resurfacing of the remaining area. The resurfacing will average 3" in compacted thickness. This area is approximately 434 square yards. | $ 70,000 | $ 68,415 | $ 68,415 | 1 |
2012 | Baltimore City | 30.251.12 | Pimlico PK-8 #223 | Asphalt parking area and driveway, curb replacement (front/flagpole lot) | Remove collapsed trench drain and concrete apron. Re-pave the area with 4" base course asphalt. Resurface this rear lot with surface course asphalt averaging 2" in compacted thickness. This lot is approximately 821 square yards. Restripe pavement markings. | $ 21,000 | $ 19,995 | $ 19,995 | 1 |
2012 | Talbot | 20.010.12 | Easton Elementary - Moton Building | Communications System | Replace entire telephone system. | $ 16,750 | $ 12,309 | $ 12,309 | 1 |
2012 | Talbot | 20.005.12 | Easton Elementary - Dobson Building | Communications System | Replace entire telephone system. | $ 10,000 | $ 10,000 | $ 10,000 | 1 |
2012 | Allegany | 01.001.12 | George's Creek Elementary | Chiller Replacement | The CentraVac chiller is original to the 1975 construction. This project will replace the original chiller with an energy efficient multi-stage rotary screw chiller. The chilled water pumps, related controls and emergency cut-offs will also be replaced. | $ 190,000 | $ 137,810 | $ 137,810 | 1 |
2012 | Cecil | 07.026.12 | Rising Sun Elementary | Casework Replacement | Replace casework in 5 to 7 classrooms. | $ 135,320 | $ 125,566 | $ 125,566 | 1 |
2012 | Harford | 12.045.12 | Riverside Elementary | Plumbing | Repair sink holes in the ball field area. Replace the entire 200'. Of pipe with new 15" reinforced concrete culvert pipe and redbrick the inlets where attached. | $ 25,000 | $ 24,318 | $ 24,318 | 1 |
2012 | Dorchester | 09.009.12 | Cambridge-South Dorchester High | Windows and Doors | Repair and/or replace the glazing door systems at the courtyard off of the Cafeteria. Install entrance to courtyard directly off of Cafeteria. The interior courtyard at this facility has a window wall system (steel frame, single pane) that dates from original construction. | $ 22,220 | $ 22,220 | $ 22,220 | 1 |
2012 | Baltimore City | 30.253.12 | Gilmor Elementary #107 | Asphalt Removal and Replacement | Removal of entire asphalt paved portion of the driveway and dumpster area to a depth of 11". The new pavement section will consist of 6" of RC-6 and 5" of Hot Mix Asphalt. Area totals 644 square yards. | $ 32,990 | $ 28,450 | $ 28,450 | 1 |
2012 | Frederick | 10.041.12 | Ballenger Creek Middle | HVAC | Replace 10 rooftop HVAC units and 4 heating and ventilation units installed in 1990 | $ 257,358 | $ 214,839 | $ 214,839 | 1 |
2012 | Anne Arundel | 02.032.12 | Broadneck High | AHU Replacement | Replace two (2) original air handling units that have deteriorated due to age. | $ 500,000 | $ 253,400 | $ 253,400 | 1 |
2012 | Anne Arundel | 02.009.12 | Chesapeake Bay Middle | Generator Replacement | Replace the existing generator that has deteriorated due to age. We are replacing in kind an emergency generator that will operate life safety functions and power the kitchen refrigerators and freezers. | $ 130,000 | $ 161,433 | $ 161,433 | 1 |
2012 | Wicomico | 22.005.12 | Beaver Run Elementary | Lighting Replacement | Replace existing incandescent lighting fixtures throughout existing exterior corridors (breezeways) with energy efficient exterior rated fluorescent fixtures (approximately 56). | $ 23,000 | $ 23,000 | $ 23,000 | 1 |
2012 | Wicomico | 22.019.12 | Pittsville Elementary/Middle | Locker Replacement | Replace existing worn and damaged single tier lockers (approximately 266) located in Area A adjacent to the main entrance with double tier lockers (approximately 135) along the perimeter of the lobby area. Lockers will be installed on existing concrete and tile base. | $ 38,931 | $ 37,131 | $ 37,131 | 1 |
2012 | Wicomico | 22.018.12 | Mardela Middle/High | Lighting | Upgrade and retro-fit existing fluorescent T12 ballasts to T8 in the Media Center, classrooms and corridors. | $ 40,000 | $ 39,459 | $ 39,459 | 1 |
2012 | Wicomico | 22.002.12 | Pinehurst Elementary | Lighting | Upgrade and retro-fit existing fluorescent T12 ballasts to T8 in the Media Center, classrooms, cafeteria, kitchen and corridors. | $ 40,000 | $ 22,262 | $ 22,262 | 1 |
2012 | Carroll | 06.012.12 | South Carroll High | Chiller Replacement | Replace aging chiller, air cooled condenser and associated circulation pump. | $ 380,000 | $ 193,433 | $ 193,433 | 1 |
2012 | Somerset | 19.012.12 | Marion Sarah Peyton School | Restroom Renovation | Renovate two gang bathrooms in the 1972 wing. | $ 60,000 | $ 53,962 | $ 53,962 | 1 |
2012 | Baltimore County | 03.086.12 | Seventh District Elementary | Flooring | Remove existing carpet throughout school and replace with VCT. | $ 77,717 | $ 83,121 | $ 83,121 | 1 |
2012 | Howard | 13.053.12 | River Hill High | Flooring | Replace the removable Orchestra pit flooring system. | $ 200,000 | $ 35,786 | $ 35,786 | 1 |
2012 | Worcester | 23.007.12 | Buckingham Elementary | Underground Fuel Tanks and Boilers | Replace oil burners on two Weil-McLain boilers with liquid propane burners. | $ 23,800 | $ 23,800 | $ 23,800 | 1 |
2012 | Worcester | 23.007.12 | Buckingham Elementary | Site Lighting | Replace nine (9) existing 34-year-old site lighting fixtures and replace with new energy efficient 100mh (halogen) pole top fixtures. | $ 13,400 | $ 13,396 | $ 13,396 | 1 |
2012 | Worcester | 23.007.12 | Buckingham Elementary | Plumbing | Remove 34-year-old domestic water shut-off valves and associated water lines and replace with new. | $ 16,000 | $ 16,000 | $ 16,000 | 1 |
2012 | Calvert | 04.011.12 | Beach Elementary | Rooftop Units | Install packaged RTU, new ductwork, structural modifications, electrical service and controls in the gymnasium. | $ 180,000 | $ 53,948 | $ 53,948 | 1 |
2012 | Caroline | 05.001.12 | Greensboro Elementary | Playground Resurface | Replace existing loose fill playground surface with poured in place surface. | $ 35,566 | $ 35,566 | $ 35,566 | 1 |
2012 | Garrett | 11.013.12 | Accident Elementary | Hallway Renovation | Repair vinyl walls and drywall as needed and install tile on the walls for a distance of 6' from floor level on all hallway walls. | $ 53,500 | $ 38,350 | $ 38,350 | 1 |
2012 | Harford | 12.021.12 | Magnolia Middle | Parking Lot Resurfacing | Resurface the bus loop, loading dock, and parking areas. | $ 164,842 | $ 164,842 | $ 164,842 | 1 |
2012 | Prince George's | 16.131.12 | Cooper Lane Elementary | Flooring | Abate existing 30,000 sf of asbestos containing floor tiles and install new VCT and related vinyl base. | $ 150,000 | $ 141,055 | $ 141,055 | 1 |
2012 | Prince George's | 16.131.12 | Cooper Lane Elementary | Ceiling Replacement | Demolish existing 25,000 sf of suspended ceiling in hallways, secure lighting, exit signs, speakers, cameras etc., prior to new ceiling installation. Install new suspended ceiling and reinstall all related ceiling components. | $ 150,000 | $ 150,000 | $ 130,000 | 1 |
2012 | Prince George's | 16.001.12 | Gwynn Park High | Art Room Renovation | Demolish existing cabinetry, counter tops and related millwork in two (2) art classrooms. Replace in-kind, 60 cabinets and 50 LF of countertop. | $ 95,000 | $ 95,000 | $ 95,000 | 1 |
2012 | Prince George's | 16.159.12 | Drew Freeman Middle | Science Lab Renovation | Demolish existing science cabinetry, countertops and related plumbing and millwork in two (2) science classrooms. | $ 125,000 | $ 149,000 | $ 149,000 | 1 |
2012 | Prince George's | 16.001.12 | Gwynn Park High | Ceiling Tile Replacement | Replace existing 20,000 sf of ceiling tile, lights, and grid with standard 2x4 lay-in system. | $ 200,000 | $ 200,000 | $ 180,000 | 1 |
2012 | Prince George's | 16.229.12 | Thomas Johnson Middle | Flooring | Replace VAT in kitchen with anti-slip quarry tile. Remove, replace and test for functionality all existing kitchen equipment and other related wiring and piping. | $ 100,000 | $ 100,000 | $ 100,000 | 1 |
2012 | Prince George's | 16.128.12 | John Hanson Montessori | Bleacher Replacement | Demolish existing bleacher system and related components. Replace in-kind with new bleacher system and components. | $ 50,000 | $ 50,000 | $ 50,000 | 1 |
2012 | Prince George's | 16.002.12 | Eleanor Roosevelt High | Athletic Field Replacement | Demolish four (4) existing tennis courts, totaling 25,000 sf. Demolish existing perimeter metal fencing 700 LF. Install new tennis court including lines, netting, posts and related components. Replace new black vinyl clad perimeter fencing. | $ 119,200 | $ 119,200 | $ 119,200 | 1 |
2012 | Prince George's | 16.103.12 | Surrattsville High | Athletic Field Replacement | Replace three (3) existing tennis courts, totaling 17,000 sf. Replace existing perimeter metal fencing 540 linear feet. Replace new tennis court including lines, netting, posts and related components. Replace new black vinyl clad perimeter fencing. | $ 94,400 | $ 137,535 | $ 137,535 | 1 |
2012 | Prince George's | 16.099.12 | Tanglewood Special Education | Parking Lot Resurfacing | Demolish existing 2,500 square yards of parking lot asphalt. Replace with new 4” base and 2” topping. Provide parking lines, directional arrows and handicap markings. | $ 150,000 | $ 146,878 | $ 146,878 | 1 |
2012 | Prince George's | 16.178.12 | Hyattsville Middle | Parking Lot Resurfacing | Demolish existing 4,500 square yards of parking lot asphalt. Replace with new 4" base and 2" topping. Provide parking lines, directional arrows and handicap markings. | $ 100,000 | $ 170,184 | $ 170,184 | 1 |
2012 | Prince George's | 16.178.12 | Hyattsville Middle | Ceiling Replacement | Demolish existing 40,000 sf of suspended ceiling in hallways. Secure lighting, exit signs, speakers, cameras etc., prior to new ceiling installation. Install new suspended ceiling and reinstall all related ceiling components. | $ 150,000 | $ 150,000 | $ 58,999 | 1 |
2012 | Prince George's | 16.002.12 | Eleanor Roosevelt High | Athletic Track Refurbishment | Remove existing rubberized surface, overlay with asphalt and replace with latex "Plexi-pave" or equivalent; restripe and mark track to existing layout. | $ 130,000 | $ 126,968 | $ 126,968 | 1 |
2012 | Prince George's | 16.002.12 | Eleanor Roosevelt High | Gym Floor Replacement | Replace existing hardwood floor with new athletic flooring system to include sleepers or subfloor. Restripe and finish. | $ 150,000 | $ 177,426 | $ 177,426 | 1 |
2012 | Prince George's | 16.153.12 | Carole Highlands Elementary | Folding Partitions | Demolish existing operable Multipurpose Room partition, track, motor and components, replace with new system. Partition is 1,080 sf and contains 15 panels and one (1) door. | $ 60,000 | $ 60,000 | $ 60,000 | 1 |
2012 | Prince George's | 16.008.12 | Dwight D. Eisenhower Middle | Flooring | Demolish existing stage hardwood flooring, nosing, sleepers and related trim. Flooring system is 1,600 sf. Replace with new in-kind, hardwood flooring, nosing, sleepers and trim. | $ 35,000 | $ 24,891 | $ 24,891 | 1 |
2012 | Baltimore County | 03.003.12 | Chesapeake High | Emergency Generator Replacement | Replace and upgrade the old and failing emergency generator and transfer switches. | $ 75,000 | $ 70,180 | $ 70,180 | 1 |
2012 | Dorchester | 09.013.12 | North Dorchester High | Underground Storage Tank | Remove and replace the underground fuel storage tank and replace with one above ground storage tank. | $ 31,742 | $ 24,161 | $ 24,161 | 1 |
2012 | Wicomico | 22.016.12 | Fruitland Primary | Lighting | Upgrade and retro-fix existing fluorescent T12 ballasts to T8 in the Media Center, classrooms, cafeteria, kitchen and corridors. | $ 42,000 | $ 26,069 | $ 26,069 | 1 |
2012 | Queen Anne's | 17.004.12 | Centreville Middle | Lighting Systems | Increase the lighting in eight (8) student bathrooms, use energy efficient T5 lights and connect one light in each bathroom to the existing generator. | $ 10,000 | $ 4,704 | $ 4,704 | 1 |
2012 | Queen Anne's | 17.021.12 | Bayside Elementary | Security System | Install swipe card access readers at the main entrance, teacher parking lot entrance and door from cafeteria that leads to the play area. | $ 12,320 | $ 10,357 | $ 10,357 | 1 |
2012 | Queen Anne's | 17.004.12 | Centreville Middle | Security System | Install swipe card access readers at the main entrance, side entrance to portable and back door to play area. | $ 12,320 | $ 10,357 | $ 10,357 | 1 |
2012 | Queen Anne's | 17.004.12 | Centreville Middle | Plumbing Fixtures | The pedal on the trough sink in the bathrooms has rusted out. A retrofit kit is available to install an infrared sensor device to refurbish the sinks in the eight bathrooms. | $ 11,000 | $ 11,659 | $ 11,659 | 1 |
2012 | Queen Anne's | 17.009.12 | Grasonville Elementary | Partition Replacement | Replace the movable partition between the gym and cafeteria. | $ 61,600 | $ 33,489 | $ 33,489 | 1 |
2012 | Talbot | 20.006.12 | Chapel District Elementary | Communications System | Replace entire telephone system. | $ 24,436 | $ 24,436 | $ 24,436 | 1 |
2012 | Baltimore County | 03.133.12 | Dulaney High | Concrete Replacement | Remove and replace the exterior concrete landing and stairs at the Auditorium exit. | $ 36,982 | $ 36,982 | $ 36,982 | 1 |
2012 | Washington | 21.004.12 | Hickory Elementary | Roof/Chiller Replacement | The existing, packaged, 100 ton air cooled chiller (circa 1975) mounted on the roof of the building will be removed and replaced. The replacement chiller will move the compressor(s) and heat exchanger into an available space within a remote area of the building directly below the existing unit, coupled with an air cooled condensing unit on the roof above. Two new chilled water pumps will be installed to replace the single pump currently employed to offer redundancy in the system. This project will also replace approximately 3,200 sf of single ply EPDM roofing that is in poor condition in the "mechanical well" with 4-ply built up roofing and appropriate tapered insulation to ensure appropriate drainage. In addition to the changes and upgrades to the automatic temperature controls needed as a result of the change out of the chiller, this project will also add and/or upgrade direct digital controls to various air handling units throughout the building to ensure optimum, centralized control of all the units at the school. | $ 210,000 | $ 190,111 | $ 190,111 | 100 |
2012 | Anne Arundel | 02.012.12 | Chesapeake High | Window Replacement | Remove existing curtain walls and install eight (8) new store front windows. Abate asbestos containing material as required. | $ 140,000 | $ 227,700 | $ 227,700 | 1 |
2012 | Caroline | 05.006.12 | Ridgely Elementary | HVAC Replacement | Replace aging HVAC units in two (2) computer labs and administrative areas. | $ 35,000 | $ 34,512 | $ 34,512 | 1 |
2012 | St. Mary's | 18.024.12 | Dynard Elementary | HVAC | Upgrade the existing heating unit in the gymnasium to include cooling. | $ 70,566 | $ 68,352 | $ 68,352 | 1 |
2013 | Baltimore City | 30.186.13 | Armistead Gardens PK-8 #243 | Intercom and System Replacement | Provide and install Bogen Multicom 96 intercom system for administrative and classroom paging. | $ 21,390 | $ 22,695 | $ 22,695 | 1 |
2013 | Baltimore City | 30.185.13 | Baltimore Polytechnic Institute #403 | Asphalt and Concrete Replacement | Furnish and install 2'' resurfacing of designated deteriorated areas approximately 6,470 SY. Remove and replace deteriorated concrete curb approximately 290 LF and sidewalk areas approximately 3,220 sf. Pavement markings to be reapplied. | $ 113,475 | $ 113,475 | $ 113,475 | 1 |
2013 | Baltimore City | 30.245.13 | Harbor View Elementary #304 for Bay Brook Middle Building #124B | Asphalt and Concrete Replacement | Resurface upper parking lot, parking markings to include numbering, furnish and install new concrete curb and gutter, repair damaged wall, remove and replace concrete sidewalk. | $ 67,465 | $ 67,465 | $ 67,465 | 1 |
2013 | Baltimore City | 30.214.13 | Belmont Elementary #217 | Intercom and System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 18,825 | $ 18,825 | $ 18,825 | 1 |
2013 | Baltimore City | 30.225.13 | Mary Ann Winterling Elementary #150 | Underground Storage Tank Replacement | Provide for closure and abandonment of one (1) 10,000 gallon underground storage tank heating oil tank and install one (1) 2,000 double wall steel ballistic and fire rated above ground tank within 10' high fence. | $ 151,191 | $ 158,658 | $ 158,658 | 1 |
2013 | Baltimore City | 30.110.13 | Baltimore City College #480 | Asphalt and Concrete Replacement | Resurface upper parking lot, parking markings to include numbering, furnish and install new concrete curb and gutter, repair damaged wall, remove and replace concrete stepping, resurface asphalt walkways and surface area in front of school, and remove concrete block statue foundation in center of path. | $ 189,375 | $ 189,375 | $ 189,375 | 1 |
2013 | Baltimore City | 30.198.13 | Coldstream Park PK-8 #031 | Asphalt and Concrete Replacement | Remove and patch deteriorated asphalt approximately 793 square yards. Furnish and install 15 new concrete parking bumpers, resurface entire parking lot and drive lanes with surface course asphalt average 2' in compacted thickness approximately 4,948 square yards. Furnish and install three concrete jersey barriers at entrance to direct flow of traffic. Furnish and install a 15'x 20' concrete dumpster pad. Remove and replace 5" concrete sidewalk approximately 2,200 sf. Furnish and install painted pavement markings. | $ 115,020 | $ 115,020 | $ 115,020 | 1 |
2013 | Baltimore City | 30.248.13 | Curtis Bay PK-8 #207 | Intercom and System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 21,956 | $ 20,791 | $ 20,791 | 1 |
2013 | Baltimore City | 30.020.13 | Dallas F. Nicholas, Sr. Elementary #039 | Underground Storage Tank Replacement | Remove and replace one (1) 10,000 gallon underground oil fuel tank and installation of double wall piping system. | $ 218,537 | $ 227,385 | $ 227,385 | 1 |
2013 | Baltimore City | 30.244.13 | Dr. Martin Luther King, Jr. PK-8 #254 | Intercom and System Replacement | Provide and install Bogen Multicom 96 intercom system for administrative and classroom paging. | $ 22,562 | $ 22,562 | $ 22,562 | 1 |
2013 | Baltimore City | 30.138.13 | Dr. Raynor Browne PK-8 #025 | Underground Storage Tank Replacement | Remove and replace one (1) 10,000 gallon underground oil fuel tank and installation of double wall piping system. | $ 244,992 | $ 244,993 | $ 244,993 | 1 |
2013 | Baltimore City | 30.262.13 | Edgewood Elementary #067 | Asphalt and Concrete Replacement | Remove and replace concrete dumpster pad, remove and replace approximately 101 LF of deteriorated concrete curb, remove and replace deteriorated concrete sidewalk approximately 386 sf. At front entrance of school remove and replace broken concrete wall caps, approximately 21 LF. | $ 17,340 | $ 17,340 | $ 17,340 | 1 |
2013 | Baltimore City | 30.262.13 | Edgewood Elementary #067 | Intercom and System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 18,125 | $ 16,978 | $ 16,978 | 1 |
2013 | Baltimore City | 30.148.13 | Fallstaff PK-8 #241 | Strom Drain Replacement | Provide material and labor to replace four (4) storm drains, approximately 175' of pipe and rebuild inlet. | $ 22,750 | $ 21,788 | $ 21,788 | 1 |
2013 | Baltimore City | 30.167.13 | Forest Park High #406 | Concrete Step Replacement | Remove and replace the deteriorated large set of steps at the main entrance. | $ 59,840 | $ 59,840 | $ 59,840 | 1 |
2013 | Baltimore City | 30.167.13 | Forest Park High #406 | Intercom and System Replacement | Provide and install Bogen Multicom 120 intercom system for administrative and classroom paging. | $ 24,762 | $ 24,762 | $ 24,762 | 1 |
2013 | Baltimore City | 30.111.13 | Fredrick Douglass High #450 | Asphalt and Concrete Replacement | Furnish and install between 1.5" and 2" of hot mix asphalt throughout the parking lot, approximately 7,500 SY. Remove and replace deteriorated concrete sidewalk approximately 6,000 sf and curb approximately 1,200 LF. Remove and replace set of deteriorating concrete steps at entrance of school. | $ 197,810 | $ 178,965 | $ 178,965 | 1 |
2013 | Baltimore City | 30.161.13 | Gardenville Elementary #211 | Intercom and System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 17,865 | $ 17,513 | $ 17,513 | 1 |
2013 | Baltimore City | 30.271.13 | Grove Park PK-8 #224 | Intercom and System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 20,289 | $ 20,289 | $ 20,289 | 1 |
2013 | Baltimore City | 30.271.13 | Grove Park PK-8 #224 | Asphalt and Concrete Replacement | Remove and replace deteriorated 5" concrete sidewalk at designated areas 1,015 sf. Furnish and install approximately 26 LF of depressed curb at wheelchair ramp install one (1) ADA warning surface at wheelchair ramp. Remove the existing deteriorated concrete loading dock area to a depth of eight 8". Furnish and install new concrete paving 8" depth, reinforced with welded wire mesh. We will use high-early strength concrete in order to minimize the "down time" at the loading dock. This area is approximately 107 SY. Remove and replace approximately 80 LF of designated deteriorated concrete curbing. Remove and replace deteriorated concrete sidewalk (5" depth) at designated locations. These areas total approximately 1,856 sf adjacent to playground area in back. Remove the existing deteriorated designated concrete sidewalk to a depth of 6". This area will receive new concrete sidewalk poured at a depth of 6" and reinforced with wire mesh. This area is approximately 376 sf playground area remove deteriorated asphalt pavement area to a depth of 4". Furnish and install new hot mix asphalt (HMA) paving averaging 4" in compacted thickness. | $ 71,900 | $ 68,900 | $ 68,900 | 1 |
2013 | Baltimore City | 30.019.13 | Harford Heights Building #036 | Asphalt and Concrete Replacement | Remove deteriorated hot mix asphalt (HMA) pavement, furnish and install asphalt averaging 4" (700 SY). Mill designated areas to a depth of 2-2.25" (1,455 square yards.) Furnish and install surface course HMA over the patch areas as well as the milled areas, averaging 2.5" in compact thickness (2,155 SY). | $ 63,325 | $ 63,325 | $ 63,325 | 1 |
2013 | Baltimore City | 30.189.13 | Hazelwood K-8 #210 | Intercom and System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 19,775 | $ 19,110 | $ 19,110 | 1 |
2013 | Baltimore City | 30.130.13 | Langston Hughes Elementary #005 | Underground Storage Tank Replacement | Remove and replace one (1) 10,000 gallon underground oil fuel tank and installation of double wall piping system. | $ 242,340 | $ 242,340 | $ 242,340 | 1 |
2013 | Baltimore City | 30.040.13 | William H. Lemmel Building #079 | Asphalt and Concrete Replacement | Mill out existing asphalt pavement in the front lot as well as the roadway leading to the back of the school. Install pavement markings in similar markings. | $ 62,135 | $ 62,135 | $ 62,135 | 1 |
2013 | Baltimore City | 30.225.13 | Mary Ann Winterling Elementary #150 | Intercom and System Replacement | Provide and install Bogen Multicom 72 intercom system for administrative and classroom paging. | $ 24,420 | $ 22,287 | $ 22,287 | 1 |
2013 | Baltimore City | 30.201.13 | Mary E. Rodman Elementary #204 | Plumbing | Replace 3" domestic hot water line approximately 200' of deteriorated steel pipe and breaking throughout. | $ 42,900 | $ 36,418 | $ 36,418 | 1 |
2013 | Baltimore City | 30.225.13 | Mary Ann Winterling Elementary #150 | Asphalt and Concrete Replacement | Remove the deteriorated pavement to 9", furnish and install high - early concrete with wire mesh reinforcement to a depth of 9". Furnish and install 2" of surface course hot mix asphalt over the remaining area. Remove and replace deteriorated concrete sidewalk area. | $ 22,287 | $ 24,420 | $ 24,420 | 1 |
2013 | Baltimore City | 30.258.13 | Medfield Heights Elementary #249 | Intercom and System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 28,649 | $ 16,341 | $ 16,341 | 1 |
2013 | Baltimore City | 30.022.13 | Montebello PK-8 #044 | Asphalt and Concrete Replacement | Remove and replace designated deteriorated concrete sidewalk 3,322 sf, remove and replace broken step, install approximately 30 tons of topsoil where conditions pose a tripping hazard. Furnish and install 2" of depth of hot mix asphalt resurfacing. Rebuild inlet in parking lot entrance. | $ 78,285 | $ 78,285 | $ 78,285 | 1 |
2013 | Baltimore City | 30.022.13 | Montebello PK-8 #044 | Waterproofing | Provide and furnish material, equipment and labor to waterproof and repipe water lines that are allowing water intrusion into the side of the building at the west side of the school. | $ 87,207 | $ 51,215 | $ 51,215 | 1 |
2013 | Baltimore City | 30.232.13 | Moravia Park Middle Building #105B | Intercom and System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 18,205 | $ 18,205 | $ 18,205 | 1 |
2013 | Baltimore City | 30.268.13 | Mt. Washington Elementary #221 | Asphalt and Concrete Replacement | Remove existing deteriorated pavement to a depth of 9". Furnish and install 3" of base asphalt and 1.5" of surface course asphalt. Paint stripes on lot for parking. | $ 29,550 | $ 29,550 | $ 29,550 | 1 |
2013 | Baltimore City | 30.054.13 | Samuel F. B. Morse Elementary #098 | Asphalt and Concrete Replacement | Furnish and install 2" hot mix asphalt resurfacing of entire parking lot approximately 1,300 SY. Remove and replace the existing deteriorated concrete apron to lot. Remove and replace deteriorated sidewalk approximately 3,000 sf. Furnish and install new pavement sealant over play lot. | $ 58,280 | $ 58,280 | $ 58,280 | 1 |
2013 | Baltimore City | 30.193.13 | Sinclair Lane Elementary #248 | Intercom and System Replacement | Provide and install Bogen Multicom 48 intercom system for administrative and classroom paging. | $ 19,015 | $ 16,867 | $ 16,867 | 1 |
2013 | Baltimore City | 30.193.13 | Sinclair Lane Elementary #248 | Ceiling and Lighting | Install new 2x4 Caltex Tile/Grid (10,863 sf). Demolition of 65 existing ceiling mounted lights, install 96 2x4/4-bulb lay in lights. Relocate 12 exit signs, 12 motion detectors and cameras. Relocate electrical conduit as required, lower 40 air returns, install 30 new flex duct and new ceiling lay in diffusers. | $ 120,000 | $ 120,000 | $ 120,000 | 1 |
2013 | Baltimore City | 30.208.13 | Steuart Hill Academic Academy PK-8 #004 | Intercom and System Replacement | Provide and install Bogen Multicom 96 intercom system for administrative and classroom paging. | $ 23,358 | $ 23,358 | $ 23,358 | 1 |
2013 | Baltimore City | 30.064.13 | Walter P. Carter PK-8 #134 | Asphalt and Concrete Replacement | Remove and replace deteriorated concrete mainly to the right side of the school and sidewalk, project also includes widening of two (2) existing ADA wheelchair ramps and removal of a third. | $ 67,295 | $ 67,295 | $ 67,295 | 1 |
2013 | Baltimore City | 30.227.13 | Western High Building #407 | Asphalt and Concrete Replacement | Furnish and install 2" and 2.5" resurfacing of designated deteriorated areas, approximately 13,500 SY. Milling of certain areas will also be done; repair and replace necessary storm drain inlet. Remove and replace deteriorated concrete curb approximately 300 LF and sidewalk areas, approximately 3,220 sf. Reapply pavement markings. | $ 176,410 | $ 176,410 | $ 176,410 | 1 |
2013 | Baltimore City | 30.222.13 | Graceland Park/O'Donnell Heights PK-8 #240 | Storm Drain Replacement | Replace 325' of deteriorated terra cotta storm drain pipe. | $ 55,225 | $ 54,600 | $ 54,600 | 1 |
2013 | Dorchester | 09.013.13 | North Dorchester High | HVAC Replacement | Replace three (3) failed, original RTU's and associated controls for the auditorium. Replacement units will be modern and energy efficient. | $ 120,000 | $ 91,500 | $ 91,500 | 1 |
2013 | Dorchester | 09.008.13 | New Directions Learning Academy | Chiller Replacement | Replace chiller and burner assemblies, including associated controls. | $ 194,881 | $ 104,881 | $ 104,881 | 1 |
2013 | Carroll | 06.042.13 | Westminster High | Seating Replacement | Replace 1,600 seats in the auditorium (approximately 1,050 main level and approximately 550 on balcony level). | $ 280,000 | $ 214,918 | $ 214,918 | 1 |
2013 | Montgomery | 15.208.13 | Burnt Mills Elementary | P. A. System Replacement | Replace P.A. system due to repeated failures and inability to secure repair parts. | $ 25,000 | $ 16,813 | $ 16,813 | 1 |
2013 | Montgomery | 15.163.13 | Rachel Carson Elementary | Exterior Window Replacement | Replace 150 original exterior operable windows throughout the building. The glass block will be replaced with upgraded thermo-pane window units that will be premium high energy efficient windows. | $ 350,000 | $ 350,000 | $ 348,232 | 1 |
2013 | Montgomery | 15.192.13 | Greenwood Elementary | Exterior Door Replacement | Replace 18 exterior doors around the original section of the building. The upgraded door units will be premium high energy efficient products. | $ 85,000 | $ 79,978 | $ 79,978 | 1 |
2013 | Montgomery | 15.175.13 | Thomas W. Pyle Middle | Interior and Exterior Door Replacement | Replace 25 interior doors and five (5) exterior doors in the originally section of building. The upgraded door units will be premium high energy efficient products. | $ 50,000 | $ 51,144 | $ 51,144 | 1 |
2013 | Montgomery | 15.160.13 | Sequoyah Elementary | Window Replacement | Replace 58 large fixed windows at the ends of the lower and upper corridors. The upgraded windows units will be premium high energy efficient products. | $ 80,000 | $ 120,967 | $ 120,967 | 1 |
2013 | Montgomery | 15.166.13 | Watkins Mill High | Window Replacement | Replace all stairwell glass block with thermo-pane premium high energy efficient window units. | $ 183,000 | $ 207,534 | $ 207,534 | 1 |
2013 | Montgomery | 15.221.13 | Laytonsville Elementary | Window Replacement | Replace 30 exterior windows, the upgraded window units will be premium high energy efficient products. | $ 48,000 | $ 82,160 | $ 82,160 | 1 |
2013 | Montgomery | 15.158.13 | Quince Orchard High | Window Replacement | Replace 48 large fixed courtyard windows in the main stairwell. The upgraded window units will be premium high energy efficient products. | $ 110,000 | $ 111,452 | $ 111,452 | 1 |
2013 | Montgomery | 15.162.13 | Ronald McNair Elementary | Basketball Court Renovations | Renovate four (4) exterior basketball courts, replace asphalt, basketball backboards, and poles, including re-stripping new asphalt as required. | $ 30,000 | $ 31,896 | $ 31,896 | 1 |
2013 | Montgomery | 15.249.13 | Piney Branch Elementary | Flooring Replacement | Replace floor covering; remove existing carpet and asbestos floor tile (by sink areas) in rooms 201 thru 206, 211 thru 216, 401, 403 thru 414 and 418, and replace with VCT. Perform flooring asbestos abatement as required. | $ 95,000 | $ 60,828 | $ 60,828 | 1 |
2013 | Montgomery | 15.119.13 | White Oak Middle | Lighting Replacement | Replace gymnasium lighting. | $ 25,000 | $ 22,086 | $ 22,086 | 1 |
2013 | Montgomery | 15.249.13 | Piney Branch Elementary | Emergency Generator Replacement | Replace the old emergency standby generator system. | $ 130,000 | $ 96,083 | $ 96,083 | 1 |
2013 | Montgomery | 15.011.13 | Woodlin Elementary | P. A. System Replacement | Replace P.A. system due to repeated failures and inability to secure repair parts. | $ 25,000 | $ 16,992 | $ 16,992 | 1 |
2013 | Montgomery | 15.259.13 | Roberto Clemente Middle | P. A. System Replacement | Replace P.A. system due to repeated failures and inability to secure repair parts. | $ 25,000 | $ 23,444 | $ 23,444 | 1 |
2013 | Montgomery | 15.122.13 | Highland Elementary | P. A. System Replacement | Replace P.A. system due to repeated failures and inability to secure repair parts. | $ 26,000 | $ 18,644 | $ 18,644 | 1 |
2013 | Montgomery | 15.047.13 | Rock Terrace Special Education | P. A. System Replacement | Replace P.A. system due to repeated failures and inability to secure repair parts. | $ 45,000 | $ 29,444 | $ 29,444 | 1 |
2013 | Montgomery | 15.077.13 | Travilah Elementary | P. A. System Replacement | Replace P.A. system due to repeated failures and inability to secure repair parts. | $ 25,000 | $ 21,788 | $ 21,788 | 1 |
2013 | Montgomery | 15.205.13 | Beall Elementary | Emergency Generator Replacement | Replace the old emergency standby generator system. | $ 130,000 | $ 130,000 | $ 109,568 | 1 |
2013 | Baltimore City | 30.090.13 | Thomas Jefferson PK-8 #232 | Asphalt Installation | Install asphalt to provide for larger parking area and driveway. Two (2) areas are approximately 20' x 80' with 25 wheel stops. | $ 40,830 | $ 40,830 | $ 40,830 | 1 |
2013 | Baltimore City | 30.148.13 | Fallstaff PK - 8 #241 | Asphalt and Concrete Replacement | Overlay 453 square yards of 2" hot mix asphalt surface in driveway, remove and replace deteriorated concrete curb approximately 119 LF. Remove and replace deteriorated concrete sidewalk along side of school approximately 117 sf to include 20 sf of ADA warning surface. Remove and replace deteriorated concrete areas. | $ 35,620 | $ 35,620 | $ 35,620 | 1 |
2013 | Cecil | 07.015.13 | Chesapeake City Elementary | Gym Roof Replacement | Replace original 1939 slate roof over gym and approximately 500 sf of concealed copper gutters. | $ 66,000 | $ 59,975 | $ 59,975 | 1 |
2013 | Cecil | 07.040.13 | North East High | Locker Room Upgrades | Renovate the boy's locker room: replace lockers, benches, and bathroom fixtures. Install slip resistant flooring material (currently painted concrete). Provide ADA accessibility. | $ 310,000 | $ 181,581 | $ 181,581 | 1 |
2013 | Cecil | 07.026.13 | Rising Sun Elementary | Casework (Phase IV) | Replace casework, install lockers and sinks. Classrooms 14 and 32-39. | $ 122,229 | $ 118,551 | $ 118,551 | 1 |
2013 | Baltimore City | 30.165.13 | Robert Poole Building (ACCE) #056 | Plumbing | Remove and replace 400' of domestic water line one (1) return and two (2) supply lines. | $ 139,043 | $ 119,946 | $ 119,946 | 1 |
2013 | Baltimore City | 30.184.13 | Calverton PK-8 #075 | Structural | Remove and replace exterior gym wall and stairwell adjacent, reinforce wall and structure. | $ 164,406 | $ 177,924 | $ 177,924 | 1 |
2013 | Baltimore City | 30.144.13 | Tench Tilghman PK-8 #013 | Windows | Remove and replace 10 adjustable gym windows. | $ 18,000 | $ 17,898 | $ 17,898 | 1 |
2013 | Baltimore City | 30.021.13 | Hamilton Building #041 (City Neighbors) | Elevator Replacement | Remove and reinstall new elevator for passenger and ADA use; comply with 2010 ADA standards design. | $ 301,400 | $ 301,400 | $ 301,400 | 1 |
2013 | Baltimore City | 30.090.13 | Thomas Jefferson PK-8 #232 | Flooring | Remove and replace gym floor to include inserts and athletic lining. | $ 49,600 | $ 47,368 | $ 47,368 | 1 |
2013 | Baltimore City | 30.256.13 | Furley Elementary #206 | Storm Drain Replacement | Replace 300' of deteriorated terra cotta storm drain pipe. | $ 43,000 | $ 34,474 | $ 34,474 | 1 |
2013 | Baltimore City | 30.130.13 | Langston Hughes Elementary #005 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,687 | $ 21,687 | $ 21,687 | 1 |
2013 | Baltimore City | 30.267.13 | Eutaw Marshburn Elementary #011 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,025 | $ 21,025 | $ 21,025 | 1 |
2013 | Baltimore City | 30.242.13 | Mathew A. Henson Elementary #029 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,697 | $ 21,697 | $ 21,697 | 1 |
2013 | Baltimore City | 30.023.13 | Federal Hill Prep. PK-8 #045 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 20,898 | $ 20,898 | $ 20,898 | 1 |
2013 | Baltimore City | 30.030.13 | Hampden PK-8 # 055 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 20,250 | $ 20,250 | $ 20,250 | 1 |
2013 | Baltimore City | 30.034.13 | John Eager Howard Elementary #061 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 17,925 | $ 17,925 | $ 17,925 | 1 |
2013 | Baltimore City | 30.127.13 | Rosemont PK-8 #063 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,598 | $ 21,523 | $ 21,523 | 1 |
2013 | Baltimore City | 30.184.13 | Calverton PK-8#075 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 65,000 | $ 65,000 | $ 65,000 | 1 |
2013 | Baltimore City | 30.176.13 | Lyndhurst PK-5 #088 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 20,967 | $ 20,848 | $ 20,848 | 1 |
2013 | Baltimore City | 30.053.13 | Collington Square PK-8 #097 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,147 | $ 21,147 | $ 21,147 | 1 |
2013 | Baltimore City | 30.068.13 | Alexander Hamilton Elementary #145 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 22,698 | $ 22,698 | $ 22,698 | 1 |
2013 | Baltimore City | 30.230.13 | Dr. Carter Goodwin Woodson PK-8 #160 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 22,977 | $ 22,977 | $ 22,977 | 1 |
2013 | Baltimore City | 30.201.13 | Mary E. Rodman Elementary #204 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,896 | $ 21,896 | $ 21,896 | 1 |
2013 | Baltimore City | 30.210.13 | Garrett Heights PK-8 #212 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 23,396 | $ 23,263 | $ 23,263 | 1 |
2013 | Baltimore City | 30.149.13 | Morrell Park PK-8 #220 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 23,578 | $ 23,548 | $ 23,548 | 1 |
2013 | Baltimore City | 30.148.13 | Fallstaff PK-8 #241 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 27,036 | $ 22,750 | $ 22,750 | 1 |
2013 | Baltimore City | 30.257.13 | Callaway Elementary #251 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,850 | $ 21,731 | $ 21,731 | 1 |
2013 | Baltimore City | 30.134.13 | Calvin Rodwell Elementary #256 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 18,705 | $ 18,635 | $ 18,635 | 1 |
2013 | Baltimore City | 30.171.13 | Claremont Special Ed. High #307 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 20,142 | $ 20,142 | $ 20,142 | 1 |
2013 | Baltimore City | 30.242.13 | Mathew A. Henson Elementary #029 | Playground Surfacing | Playground surface removal and replacement of one (1) pour rubber surface. | $ 31,297 | $ 34,880 | $ 34,880 | 1 |
2013 | Baltimore City | 30.258.13 | Medfield Heights Elementary #249 | Playground Surfacing | Playground surface removal and replacement of one (1) pour rubber surface. | $ 17,750 | $ 28,640 | $ 28,640 | 1 |
2013 | Baltimore City | 30.186.13 | Armistead Gardens PK-8 #243 | Playground Surfacing | Playground surface removal and replacement of one pour rubber surface. | $ 35,055 | $ 34,850 | $ 34,850 | 1 |
2013 | Baltimore City | 30.198.13 | Coldstream Park PK-8 #031 | Playground Surfacing | Playground surface removal and replacement of one pour rubber surface. | $ 23,540 | $ 23,540 | $ 23,540 | 1 |
2013 | Baltimore City | 30.054.13 | Samuel F. B. Morse Elementary #098 | Playground Surfacing | Playground surface removal and replacement of one (1) pour rubber surface. | $ 37,813 | $ 37,813 | $ 37,813 | 1 |
2013 | Baltimore City | 30.205.13 | Yorkwood Elementary #219 | Asphalt and Concrete Replacement | Remove and replace designated 5" concrete sidewalk approximately 376'. Mill, tie in locations for hot mix asphalt (HMA) resurfacing 3" approximately 240 SY, and resurface at 2" depth of HMA approximately 2,864 SY. Pavement markings to be reapplied. | $ 64,785 | $ 64,785 | $ 64,785 | 1 |
2013 | Frederick | 10.041.13 | Ballenger Creek Middle | Rooftop HVAC Replacement (Phase II) | Replace nine (9) rooftop HVAC units, associated gas piping, and four (4) heating/ventilation units installed in 1990. | $ 1,124,562 | $ 930,006 | $ 912,850 | 1 |
2013 | Harford | 12.046.13 | Joppatowne High | Paving | Replace the pavement associated with water main break. | $ 37,632 | $ 37,632 | $ 37,632 | 1 |
2013 | Harford | 12.013.13 | William S. James Elementary | Stormwater Management | Replace deteriorated clay pipe and repair three (3) inlets. | $ 17,189 | $ 17,189 | $ 17,189 | 1 |
2013 | Carroll | 06.022.13 | Hampstead Elementary | Fire Alarm Replacement | Upgrade old system to new addressable system. | $ 182,028 | $ 94,700 | $ 94,700 | 1 |
2013 | Carroll | 06.005.13 | Sandymount Elementary | Fire Alarm Replacement | Upgrade old system to new addressable system. | $ 182,242 | $ 104,700 | $ 104,700 | 1 |
2013 | Baltimore City | 30.188.13 | Walbrook Building #411 | Tennis Court Renovations | $ 213,364 | $ 213,337 | $ 213,337 | 1 | |
2013 | Baltimore City | 30.228.13 | Southside Building #181 | Tennis Court Renovations | Tennis and basketball court refurbishment/replacement. | $ 190,110 | $ 186,723 | $ 186,723 | 1 |
2013 | Baltimore City | 30.110.13 | Baltimore City College #480 | Tennis Court Renovations | $ 313,972 | $ 305,711 | $ 305,711 | 1 | |
2013 | Baltimore City | 30.214.13 | Belmont Elementary #217 | Underground Fuel Tank Replacement | Replace the underground fuel tank. | $ 196,835 | $ 196,835 | $ 196,835 | 1 |
2013 | Wicomico | 22.018.13 | Mardela Middle/High | Water Tank and Heater Replacement | Replace the original domestic water storage tank and domestic hot water heater in the existing boiler room. | $ 180,000 | $ 126,134 | $ 126,134 | 1 |
2013 | Wicomico | 22.016.13 | Fruitland Primary | Site Redevelopment | Separate vehicular drop-off/pick-up from staff/visitor parking area and expand parking area with revised site access entrance to improve safety and site accessibility. | $ 380,000 | $ 381,000 | $ 381,000 | 1 |
2013 | Anne Arundel | 02.007.13 | Magothy River Middle | Folding Door | Replace the folding doors in the mini-gymnasium that have deteriorated due to age. | $ 46,937 | $ 46,937 | $ 46,937 | 1 |
2013 | Anne Arundel | 02.099.13 | South River High | Boiler | Replace 1993 boiler that has deteriorated due to age. This project also includes chimney modifications and repairs as required. | $ 320,474 | $ 279,674 | $ 279,674 | 1 |
2013 | Anne Arundel | 02.012.13 | Chesapeake High | Window Replacement (Phase 2) | Remove existing curtain walls and install new store front windows. Abate asbestos containing material as required. | $ 266,816 | $ 240,959 | $ 240,959 | 1 |
2013 | Anne Arundel | 02.096.13 | Severn River Middle | Folding Door | Replace the folding doors in the mini-gymnasium that have deteriorated due to age. | $ 46,937 | $ 46,937 | $ 46,937 | 1 |
2013 | Anne Arundel | 02.087.13 | MacArthur Middle | Folding Door | Replace three (3) folding doors in the large group area that have deteriorated due to age. | $ 116,575 | $ 116,574 | $ 116,574 | 1 |
2013 | Anne Arundel | 02.013.13 | Meade High | Auditorium Seating | Replace auditorium seating that has deteriorated due to age. | $ 350,000 | $ 144,129 | $ 144,129 | 1 |
2013 | Anne Arundel | 02.099.13 | South River High | Elevator | Restore/refurbish existing elevator that have deteriorated due to age. | $ 194,000 | $ 194,000 | $ 194,000 | 1 |
2013 | Anne Arundel | 02.007.13 | Magothy River Middle | Elevator | Restore/refurbish existing elevator that has deteriorated due to age. | $ 173,400 | $ 173,400 | $ 173,400 | 1 |
2013 | Baltimore County | 03.160.13 | Arbutus Elementary | Air Conditioning Installation | Provide and install a chiller (including DDC controls), replacement air handling units for administration, gymnasium and cafeteria. | $ 1,030,000 | $ 1,092,500 | $ 1,092,500 | 1 |
2013 | Baltimore County | 03.148.13 | Kenwood High | Intercom/Clock System Upgrade | Install new intercom system; include new speakers, wiring and horns. The system main console wiring will tie into the MDF/IDF locations. | $ 400,000 | $ 424,609 | $ 424,609 | 1 |
2013 | Baltimore County | 03.097.13 | Hereford Middle | Air Conditioning Installation | Provide and install the chiller, replacement mechanical terminal units not previously replaced, branch piping, DDC controls and valves for the new equipment, and insulation and other appurtenances. | $ 1,810,000 | $ 1,872,000 | $ 1,872,000 | 1 |
2013 | Washington | 21.046.13 | Fountaindale Elementary | Roof Replacement | Replace the entire 53,406 sf 1987 built-up roof. | $ 1,005,000 | $ 686,796 | $ 686,796 | 1 |
2013 | Harford | 12.038.13 | Emmorton Elementary | Flooring | Replace synthetic gym floor. | $ 78,082 | $ 79,741 | $ 79,741 | 1 |
2013 | Harford | 12.046.13 | Joppatowne High | Folding Partition | Replace folding partition in gym with vinyl roll up curtain. | $ 14,050 | $ 14,050 | $ 14,050 | 1 |
2013 | Harford | 12.047.13 | Roye Williams Elementary | Paving | Repair and resurface entire lot and driveway. | $ 235,110 | $ 235,110 | $ 235,110 | 1 |
2013 | Harford | 12.050.13 | Southampton Middle | Storm Drain Replacement | Replace storm drain under the athletic fields. | $ 113,027 | $ 113,027 | $ 113,027 | 1 |
2013 | Harford | 12.031.13 | North Bend Elementary | Storm Drain Replacement | Repair pilot channel, dewatering devices, vault clean outs, outfall and stabilization. | $ 67,663 | $ 67,663 | $ 67,663 | 1 |
2013 | Charles | 08.005.13 | General Smallwood Middle | HVAC Replacement (Phase I) | Replace approximately 50% of the 76 HVAC unit ventilators. | $ 262,774 | $ 260,463 | $ 260,463 | 1 |
2013 | Worcester | 23.007.13 | Buckingham Elementary | Exterior Door Replacement | Remove and provide/install new exterior doors (43 total), including main entrance, classrooms, corridors, gymnasium and cafeteria doors. Includes replacement of doors, frames, hardware, thresholds, transoms and sidelights. | $ 193,000 | $ 197,249 | $ 197,249 | 1 |
2013 | Baltimore City | 30.239.13 | Arundel PK - 8 #164 | Storm Drain Replacement | Replace 400' of deteriorated sanitary line. | $ 93,225 | $ 93,225 | $ 93,225 | 1 |
2013 | Baltimore City | 30.176.13 | Lyndhurst PK-5 #088 | Asphalt and Concrete Replacement | Mill, furnish and install 2" of asphalt, remove and replace deteriorated concrete sidewalk and steps. Paint stripes on lot for parking. | $ 51,745 | $ 51,745 | $ 51,745 | 1 |
2013 | Montgomery | 15.154.13 | Clearspring Elementary | Windows and Doors Replacement | Replace courtyard windows in southwest wall. Replace exterior doors and window lights in all exits 1 thru 18. Replace two (2) garage overhead doors. All replacement units will be premium high energy efficient products. | $ 155,058 | $ 179,898 | $ 179,898 | 1 |
2013 | Montgomery | 15.047.13 | Rock Terrace Special Education | Emergency Generator Replacement | Replace 27 year old emergency standby generator system that is at high risk of failure and has exceeded its anticipated life-cycle. Service part are difficult to secure. | $ 130,000 | $ 110,322 | $ 110,322 | 1 |
2013 | Montgomery | 15.137.13 | Poolesville Elementary | Emergency Generator and Lighting System Replacement | $ 130,000 | $ 130,000 | $ 104,202 | 1 | |
2013 | Montgomery | 15.235.13 | Sligo Middle | Asphalt Replacement | Replace asphalt and basketball goals (posts, backboards, rims) on basketball courts. | $ 55,831 | $ 55,831 | $ 55,831 | 1 |
2013 | Montgomery | 15.125.13 | Tilden Middle | Locker Repair | Refurbish all corridor lockers. This will include various repairs and painting of the existing lockers. | $ 50,000 | $ 13,230 | $ 13,230 | 1 |
2013 | Montgomery | 15.098.13 | Fairland Elementary | P. A. System Replacement | Due to repeated failures and inability to secure repair parts. | $ 25,000 | $ 20,331 | $ 20,331 | 1 |
2013 | Baltimore County | 03.073.13 | Owings Mills High | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 1800) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 245,000 | $ 245,000 | $ 245,000 | 1 |
2013 | Baltimore County | 03.069.13 | Padonia Elementary | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 700) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 95,000 | $ 95,000 | $ 95,000 | 1 |
2013 | Baltimore County | 03.074.13 | Jacksonville Elementary | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 1200) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 155,000 | $ 155,000 | $ 155,000 | 1 |
2013 | Baltimore County | 03.114.13 | Towson High | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 2000) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 240,000 | $ 240,000 | $ 240,000 | 1 |
2013 | Baltimore County | 03.096.13 | Seven Oaks Elementary | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 700) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 100,000 | $ 100,000 | $ 100,000 | 1 |
2013 | Baltimore County | 03.087.13 | Lutherville Laboratory | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 800) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 90,000 | $ 90,000 | $ 90,000 | 1 |
2013 | Baltimore County | 03.057.13 | Victory Villa Elementary | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 600) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 77,000 | $ 77,000 | $ 77,000 | 1 |
2013 | Baltimore County | 03.035.13 | Chesapeake Terrace Elementary | Complete Lighting System Upgrade | Retrofit/replace all interior/exterior lighting fixtures (approximately 650) with new energy efficient luminaires and lighting controls. Provide all labor and materials required to install new fixtures/retrofit kits. | $ 85,000 | $ 85,000 | $ 85,000 | 1 |
2013 | Anne Arundel | 02.017.13 | Georgetown East Elementary | P.A System | Replace obsolete public address system. | $ 327,332 | $ 286,907 | $ 286,907 | 1 |
2013 | Anne Arundel | 02.109.13 | Oakwood Elementary | P.A System | Replace obsolete public address system. | $ 258,850 | $ 223,337 | $ 223,337 | 1 |
2013 | Anne Arundel | 02.048.13 | Odenton Elementary | P.A System | Replace obsolete public address system. | $ 312,850 | $ 283,125 | $ 283,125 | 1 |
2013 | Anne Arundel | 02.049.13 | Shipley's Choice Elementary | P.A System | Replace obsolete public address system. | $ 244,731 | $ 204,306 | $ 204,306 | 1 |
2013 | Harford | 12.038.13 | Emmorton Elementary | Storm Water Management | Re-align gate, wire brush and recoat riser top, regrade erosion channel in center of pond, remove sediment and vegetation from dewatering pipe and from the storm drain outfall. Remove sediment and riprap from barrel outfall, repair downstream dam slope, lime and permanent seed areas. | $ 79,741 | $ 78,082 | $ 78,082 | 1 |
2013 | Harford | 12.030.13 | Fallston Middle | Storm Water Management | Wire brush and recoat riser top, lime and permanent seed areas, mow to toe of downstream dam slope, remove riprap place on end wall apron and cut vegetation in center of channel. | $ 37,832 | $ 37,832 | $ 37,832 | 1 |
2013 | Harford | 12.007.13 | North Harford Middle | Storm Water Management | Remove fallen debris from top of riser, remove tree limbs from low flow pipe, cut and remove woody vegetation from within 25' of riser and repair mower rut damage on downstream dam slope. | $ 16,400 | $ 16,400 | $ 16,400 | 1 |
2013 | Harford | 12.034.13 | Church Creek Elementary | Storm Water Management | Remove sediment from storm drain outlet, remove trash from pond, remove rocks from inside storm drain outfall and replace flared end section. | $ 94,367 | $ 91,117 | $ 91,117 | 1 |
2013 | Harford | 12.029.13 | Ring Factory Elementary | Storm Water Management | Remove sediment from curb opening, remove and replace riprap pilot channel and fill in hole next to riser. | $ 98,824 | $ 92,393 | $ 92,393 | 1 |
2013 | Harford | 12.033.13 | Fountain Green Elementary | Storm Water Management | Remove sediment and vegetation from dewatering pipe, mow to waterline, and repair invert of barrel pipe at end wall. | $ 27,738 | $ 27,738 | $ 27,738 | 1 |
2013 | Harford | 12.001.13 | Fallston High | Emergency Generator Replacement | Replace generator for emergency light and exit signs only. | $ 19,625 | $ 19,625 | $ 19,625 | 1 |
2013 | Baltimore City | 30.177.13 | George Washington Elementary #022 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 25,000 | $ 22,874 | $ 22,874 | |
2013 | Baltimore City | 30.204.13 | Dr. Bernard E. Harris, Sr. Elementary #250 | Asphalt and Concrete Replacement | Remove and replace deteriorated concrete mainly to the left side of the school and sidewalk, also to include resurfacing of the parking lot. | $ 93,000 | $ 92,720 | $ 92,720 | |
2013 | Baltimore City | 30.204.13 | Dr. Bernard E. Harris, Sr. Elementary #250 | Tennis Court Repairs | Refurbish, overlay with new sealant and repaint two (2) tennis courts, replace center posts and end footers of net. | $ 22,637 | $ 22,067 | $ 22,067 | |
2013 | Baltimore City | 30.111.13 | Frederick Douglas High #450 | Tennis Court Renovations | Tennis court refurbishment replacement. | $ 178,965 | $ 197,810 | $ 197,810 | |
2013 | Baltimore City | 30.214.13 | Belmont Elementary #217 | Asphalt and Concrete Replacement | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 49,960 | $ 49,960 | $ 49,960 | |
2013 | Talbot | 20.010.13 | Easton Elementary - Moton Building | Security System | Purchase and installation of a security system: four (4) Category six (6) cable runs (4 doors); one (1) camera; one (1) door intercom to phone system; four (4) door access latches, controllers, and readers; one (1) power Ethernet data switch; and one (1) video surveillance server. | $ 17,585 | $ 17,775 | $ 17,775 | 1 |
2013 | Talbot | 20.005.13 | Easton Elementary - Dobson Building | Security System | Purchase and installation of a security system: four (4) Category six (6) cable runs (five (5) doors); one (1) camera; one (1) door intercom to phone system; five (5) door access latches, controllers, and readers; and one (1) power Ethernet data switch. (shared video surveillance server w/motion) | $ 17,846 | $ 17,199 | $ 17,199 | 1 |
2013 | Talbot | 20.006.13 | Chapel District Elementary | Security System | Purchase and installation of a security system: four (4) Category 6 cable runs (five (5) doors); one (1) camera; one (1) door intercom to phone system; 5 door access latches, controllers, and readers; one (1) power Ethernet data switch; and one (1) video surveillance server. | $ 19,719 | $ 16,962 | $ 16,962 | 1 |
2013 | Harford | 12.050.13 | Southampton Middle | Motor Control Replacement | Replace motor control center. | $ 45,590 | $ 45,590 | $ 45,590 | 1 |
2013 | Harford | 12.017.13 | Jarrettsville Elementary | ADA Modifications | Furnish and install a new ADA concrete ramp and remove and replace existing concrete curb and sidewalk at outside perimeter of bus loop. | $ 49,634 | $ 49,634 | $ 49,634 | 1 |
2013 | Carroll | 06.030.13 | Mt. Airy Elementary | Fire Alarm Replacement | Upgrade old system to new addressable system. | $ 172,000 | $ 91,825 | $ 91,825 | 1 |
2013 | Talbot | 20.002.13 | Easton High | Security System | Purchase and installation of a security system: four (4) category 6 cable runs, six (6) doors; one (1) camera; one (1) door intercom to phone system; six (6) door access latches, controllers and readers; three (3) power Ethernet data switches; one (1) video surveillance server; and back-up equipment. | $ 55,001 | $ 42,791 | $ 42,791 | 1 |
2013 | Talbot | 20.004.13 | Easton Middle | Security System | Purchase and installation of a security system: four (4) Category six (6) cable runs (three (3) doors); one (1) camera; one (1) door intercom to phone system; three (3) door access latches; controllers, and readers; three (3) power Ethernet data switches; and one (1) video surveillance server. | $ 19,535 | $ 19,062 | $ 19,062 | 1 |
2013 | Talbot | 20.007.13 | White Marsh Elementary | Security System | Purchase and installation of a security system: four (4) Category six (6) cable runs (four (4) doors); one (1) camera; one (1) door intercom to phone system; four (4) door access latches, controllers, and readers; one (1) power Ethernet data switch; and one (1) video surveillance server. | $ 18,089 | $ 16,234 | $ 16,234 | 1 |
2013 | Talbot | 20.008.13 | St. Michaels Middle/High | Security System | Purchase and installation of a security system: four (4)Category six (6) cable runs (three (3) doors); one (1) camera; one (1) door intercom to phone system; three (3) door access latches, controllers, and readers; two (2) power Ethernet data switches; and one (1) video surveillance server. | $ 16,430 | $ 12,326 | $ 12,326 | 1 |
2013 | Talbot | 20.001.13 | St. Michaels Elementary | Security System | Purchase and installation of a security system: four (4) Category six (6) cable runs (five (5) doors); one (1) camera; one (1) door intercom to phone system; five (5) door access latches, controllers, and readers; one (1) power Ethernet data switch; and one (1) video surveillance server. | $ 19,677 | $ 15,855 | $ 15,855 | 1 |
2013 | Talbot | 20.009.13 | Tilghman Elementary | Security System | Purchase and installation of a security system: four (4) Category six (6) cable runs (three (3) doors); one (1) camera; one (1) door intercom to phone system; three (3) door access latches, controllers, and readers; one (1) power Ethernet data switch; and one (1) video surveillance server. | $ 15,386 | $ 12,346 | $ 12,346 | 1 |
2013 | Calvert | 04.011.13 | Beach Elementary | AHU and DX Repair/Replacement | The Trane AHU will be reconditioned and have a new heat coil installed. The supporting roof top DX 3 ton unit will be replaced. | $ 37,500 | $ 37,372 | $ 37,342 | 1 |
2013 | Calvert | 04.009.13 | Southern Middle | HVAC Control System | Replace the old pneumatic HVAC control system which operates the five main air handling units for this facility. | $ 24,900 | $ 24,891 | $ 24,891 | 1 |
2013 | Calvert | 04.015.13 | Plum Point Elementary | HVAC Control System | Installation of a web based HVAC control system to allow this facility to communicate with and be controlled by the CCPS energy management system. | $ 24,300 | $ 20,360 | $ 20,360 | 1 |
2013 | Calvert | 04.019.13 | Patuxent High | Carpet Replacement | Remove carpet in the classroom corridors and replace with VCT. | $ 24,500 | $ 21,840 | $ 21,840 | 1 |
2013 | Calvert | 04.019.13 | Patuxent High | Flooring | Replace the rubber stairwell riser treads and landing tiles in kind. | $ 83,796 | $ 89,218 | $ 89,218 | 1 |
2013 | Kent | 14.008.13 | Worton Elementary | Security System | Install new CCTV cameras to enhance security. | $ 23,135 | $ 23,085 | $ 23,085 | 1 |
2013 | Kent | 14.007.13 | Kent County High | Security System | Install new CCTV cameras to enhance security, includes security for the Intensive Behavioral Academic Learning Center (Kent H.) relocatable building. | $ 74,273 | $ 74,273 | $ 74,273 | 1 |
2013 | Kent | 14.003.13 | Kent County Middle | Security System | Install new CCTV cameras to enhance security. | $ 29,818 | $ 29,818 | $ 29,818 | 1 |
2013 | Kent | 14.006.13 | Garnett Elementary | Security System | Install new CCTV cameras to enhance security. | $ 37,191 | $ 37,091 | $ 37,091 | 1 |
2013 | Prince George's | 16.197.13 | Andrew Jackson Academy | Pipe Insulation Replacement | Re-insulate piping in ceilings throughout the 1971 building. | $ 200,000 | $ 236,990 | $ 236,990 | 1 |
2013 | Prince George's | 16.163.13 | Annapolis Road High | Parking Lot Repair | Refurbish parking to include lot 4" base, 4" coarse, 2" fine and stripe. | $ 375,000 | $ 447,870 | $ 447,870 | 1 |
2013 | Prince George's | 16.164.13 | Ardmore Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top , an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 18,197 | $ 18,197 | 1 |
2013 | Prince George's | 16.123.13 | Barnaby Manor Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top , an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 22,529 | $ 22,529 | 1 |
2013 | Prince George's | 16.106.13 | Bladensburg Elementary | Emergency Recovery Unit Replacement | Replace the 1990 ERU #1 and 2. | $ 150,000 | $ 321,715 | $ 321,715 | 1 |
2013 | Prince George's | 16.089.13 | Bowie High | Basketball Court Repair | Sand, refinish restripe basketball court; provide center court logo. | $ 20,000 | $ 21,031 | $ 21,031 | 1 |
2013 | Prince George's | 16.262.13 | Bowie High Annex | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top , an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 40,000 | $ 39,895 | $ 39,895 | 1 |
2013 | Prince George's | 16.025.13 | Bradbury Heights Elementary | HVAC Control Systems | Repair HVAC control systems throughout building. | $ 30,000 | $ 59,420 | $ 59,420 | 1 |
2013 | Prince George's | 16.041.13 | C. Elizabeth Reig Special Education | Pool Repairs | Replace white coat on pool as needed including tiles on walls and coping. | $ 30,000 | $ 28,600 | $ 28,600 | 1 |
2013 | Prince George's | 16.142.13 | Carrollton Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top , an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 21,091 | $ 21,091 | 1 |
2013 | Prince George's | 16.010.13 | Central High | Parking Lot Repairs | Repave entire driveway and parking lot. | $ 725,000 | $ 442,500 | $ 442,500 | 1 |
2013 | Prince George's | 16.010.13 | Central High | Locker Replacement | Replace lockers in boys locker room. | $ 50,000 | $ 56,500 | $ 56,500 | 1 |
2013 | Prince George's | 16.110.13 | Charles Carroll Middle | Locker Replacement | Replace lockers in boys locker room. | $ 50,000 | $ 18,125 | $ 18,125 | 1 |
2013 | Prince George's | 16.147.13 | Columbia Park Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top , an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 19,009 | $ 19,009 | 1 |
2013 | Prince George's | 16.159.13 | Drew Freeman Middle | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 40,000 | $ 42,689 | $ 42,689 | 1 |
2013 | Prince George's | 16.194.13 | Duval High | Heating Unit Replacement | Replace heating units in hallways in old building, 36 sections (575 linear feet). These are thin tube radiators that are in the hallways and most of the classrooms in this building, excludes the Band wing and the Annex, which were added in 2001. | $ 200,000 | $ 243,500 | $ 243,500 | 1 |
2013 | Prince George's | 16.008.13 | Dwight D. Eisenhower Middle | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 40,000 | $ 36,149 | $ 36,149 | 1 |
2013 | Prince George's | 16.002.13 | Eleanor Roosevelt High | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install three (3) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 60,000 | $ 56,851 | $ 56,851 | 1 |
2013 | Prince George's | 16.104.13 | Forestville High | Tennis Court Repairs | Refurbish tennis courts. | $ 90,000 | $ 45,493 | $ 45,493 | 1 |
2013 | Prince George's | 16.046.13 | Friendly High | Auditorium Renovation | Replace seating, stage curtains, carpet and paint in auditorium. | $ 250,000 | $ 313,794 | $ 313,794 | 1 |
2013 | Prince George's | 16.136.13 | John Hanson French Immersion (formerly G. Gardner Shugart M.) | Exhaust Fans | Repair/replace 14 exhaust fans throughout the building. | $ 60,000 | $ 73,092 | $ 73,092 | 1 |
2013 | Prince George's | 16.211.13 | Gwynn Park Middle | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 40,000 | $ 37,510 | $ 37,510 | 1 |
2013 | Prince George's | 16.017.13 | H. W. Wheatley Special Education | Pool Repairs | Replace white coat on pool as needed including tiles on walls and coping. | $ 30,000 | $ 28,600 | $ 28,600 | 1 |
2013 | Prince George's | 16.132.13 | Heather Hills Elementary | Fire Alarm | Install new fire alarm. | $ 100,000 | $ 74,771 | $ 74,771 | 1 |
2013 | Prince George's | 16.132.13 | Heather Hills Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 19,009 | $ 19,009 | 1 |
2013 | Prince George's | 16.058.13 | High Bridge Elementary | Pipe Insulation Replacement | Re-insulate pipes throughout building; replace 24 fan coil units and two (2) replace RTU (beyond life cycle). | $ 250,000 | $ 519,292 | $ 519,292 | 1 |
2013 | Prince George's | 16.058.13 | High Bridge Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 18,197 | $ 18,197 | 1 |
2013 | Prince George's | 16.085.13 | High Point High | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 60,000 | $ 52,674 | $ 52,674 | 1 |
2013 | Prince George's | 16.178.13 | Hyattsville Middle | Gym Renovations | Replace indoor bleacher system and floor in gym. | $ 150,000 | $ 107,487 | $ 107,487 | 1 |
2013 | Prince George's | 16.042.13 | James E. Duckworth Special Education | Pool Repairs | Replace white coat on pool as needed including tiles on walls and coping. | $ 30,000 | $ 28,600 | $ 28,600 | 1 |
2013 | Prince George's | 16.154.13 | James McHenry Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 19,407 | $ 19,407 | 1 |
2013 | Prince George's | 16.126.13 | John Bayne Elementary | Abatement, Ceiling and Lighting Replacement (Phase I) | Provide all labor, materials and equipment and services necessary as required to perform the following work in the single story section of the school consisting of the boiler room, pipe tunnels and crawlspace beneath the building, general office suite, multi-purpose room, kitchen, the main entrance and main front hallway. Replace existing ceiling with new ceiling at same height. Provide new ceiling tile, track, support, light fixtures, speaker grilles and HVAC diffusers. Adjust sprinkler heads to meet new ceiling height. Contractor shall secure existing cables, exit signs, speakers, cameras, etc. prior to new ceiling installation. Remove existing thermal system insulation (TSI) and replace with new non-asbestos TSI on all existing piping throughout the designated work area. Clean all contaminates, asbestos abatement of spray applied fireproofing located above the ceiling and replacement with new non-asbestos TSI (i.e. fiberglass) throughout the designated work area. Removal and replacement of the asbestos flooring throughout the designated work area. | $ 275,000 | $ 448,000 | $ 448,000 | 1 |
2013 | Prince George's | 16.225.13 | Kenmoor Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 18,197 | $ 18,197 | 1 |
2013 | Prince George's | 16.188.13 | Kettering Elementary | UV Replacement | Repair/replace 35 classroom univents as needed. | $ 200,000 | $ 521,680 | $ 521,680 | 1 |
2013 | Prince George's | 16.009.13 | Laurel Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 20,254 | $ 20,254 | 1 |
2013 | Prince George's | 16.135.13 | Magnolia Elementary | Roof exhaust Fan Replacement | Replace (29) roof exhaust fans. | $ 35,000 | $ 142,800 | $ 142,800 | 1 |
2013 | Prince George's | 16.100.13 | Margaret Brent School | Pool Repairs and Locker Replacement | Replace white coat on pool including tiles on wall and coping as needed and replace lockers. | $ 50,000 | $ 28,600 | $ 28,600 | 1 |
2013 | Prince George's | 16.209.13 | Patuxent Elementary | Pipe Insulation Replacement | Replace molded A/C insulation in the entire building. | $ 95,000 | $ 138,100 | $ 138,100 | 1 |
2013 | Prince George's | 16.181.13 | Robert Goddard Montessori & French Immersion | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 40,000 | $ 36,389 | $ 36,389 | 1 |
2013 | Prince George's | 16.200.13 | Seabrook Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 18,742 | $ 18,742 | 1 |
2013 | Prince George's | 16.075.13 | Springhill Lake Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 18,416 | $ 18,416 | 1 |
2013 | Prince George's | 16.087.13 | Suitland High | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install three (3) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 60,000 | $ 63,958 | $ 63,958 | 1 |
2013 | Prince George's | 16.118.13 | Valley View Elementary | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install one (1) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 20,000 | $ 18,353 | $ 18,353 | 1 |
2013 | Prince George's | 16.196.13 | Walker Mill Middle | Food Service | Disconnect, remove and dispose of existing serving line. Provide and install two (2) new serving line consisting of four (4) hot wells, a frost top, an all purpose counter, and a cashier's stand. Hot well unit and cold plate unit will have a single over shelf and sneeze guard. All units will have a fixed tray slide and casters. | $ 40,000 | $ 37,510 | $ 37,510 | 1 |
2013 | Prince George's | 16.052.13 | Woodridge Elementary | Roof exhaust Fan Replacement | Replace 20 roof exhaust fans. | $ 30,000 | $ 92,800 | $ 92,800 | 1 |
2013 | Prince George's | 16.052.13 | Woodridge Elementary | Parking Lot Repairs | Refurnish parking to include lot 4" base, 4" coarse, 2" fine and stripe. | $ 175,000 | $ 116,463 | $ 116,463 | 1 |
2013 | Caroline | 05.001.13 | Greensboro Elementary | Security | Secure school entrance. | $ 50,000 | $ 19,420 | $ 19,420 | 1 |
2013 | Caroline | 05.006.13 | Ridgely Elementary | Security | Secure school entrance by adding an additional storefront system which will require all visitors to enter the main office before being allowed to gain access to the rest of the building. | $ 15,000 | $ 11,750 | $ 11,750 | 1 |
2013 | Caroline | 05.003.13 | Denton Elementary | Security | Secure school entrance. | $ 20,000 | $ 15,389 | $ 15,389 | 1 |
2013 | Caroline | 05.005.13 | Lockerman Middle | Security | Secure school entrance. | $ 12,500 | $ 12,175 | $ 12,175 | 1 |
2013 | Caroline | 05.006.13 | Ridgely Elementary | Hot Water Heater Replacement | Replace aging oil fired domestic hot water heater with propane domestic hot water heater system. | $ 27,000 | $ 22,200 | $ 22,200 | 1 |
2013 | Caroline | 05.003.13 | Denton Elementary | Hot Water Heater Replacement | Replace aging oil fired domestic hot water heater with propane domestic hot water heater system. | $ 27,000 | $ 23,550 | $ 23,550 | 1 |
2013 | Caroline | 05.006.13 | Ridgely Elementary | Generator Replacement | Replace aging power backup generator. | $ 25,000 | $ 19,820 | $ 19,820 | 1 |
2013 | Caroline | 05.005.13 | Lockerman Middle | Generator Replacement | Replace aging power backup generator. | $ 25,000 | $ 19,820 | $ 19,820 | 1 |
2013 | Caroline | 05.003.13 | Denton Elementary | Door Replacement | Replace existing doors which are not compliant with current fire marshal requirements, with fire rated doors. | $ 15,000 | $ 15,078 | $ 15,078 | 1 |
2013 | Caroline | 05.005.13 | Lockerman Middle | Door Replacement | Replace existing doors which are not compliant with current fire marshal requirements, with fire rated doors. | $ 15,000 | $ 15,260 | $ 15,260 | 1 |
2013 | Caroline | 05.001.13 | Greensboro Elementary | Playground | Replace existing loose fill playground material with poured in place solid surface. | $ 25,000 | $ 31,322 | $ 31,322 | 1 |
2013 | Caroline | 05.006.13 | Ridgely Elementary | Playground | Replace existing loose fill playground material with poured in place solid surface. | $ 42,509 | $ 5,110 | $ 51,100 | 1 |
2013 | Caroline | 05.003.13 | Denton Elementary | Playground | Replace existing loose fill playground material with poured in place solid surface. | $ 15,000 | $ 15,268 | $ 15,268 | 1 |
2013 | Queen Anne's | 17.021.13 | Bayside Elementary | Playground | Install poured in place surfacing on large 5-12 play area. This would include sidewalks and ramps to make the area ADA compliant. | $ 82,400 | $ 82,349 | $ 82,349 | 1 |
2013 | Queen Anne's | 17.009.13 | Grasonville Elementary | Playground | Install poured in place surfacing on remainder of front playground and 5-12 play area in rear of building. This would include ramps to make the areas ADA compliant. | $ 74,940 | $ 71,105 | $ 71,105 | 1 |
2013 | Queen Anne's | 17.009.13 | Grasonville Elementary | Roofing System | Gymnasium west wall and media center west wall. Install new metal wall panel and gutter installation, ice and water shield, and light weight framing system along with downspouts. Funnel water off the building and prevent leaking in the PE Office, storage room and media center. | $ 35,100 | $ 35,062 | $ 35,062 | 1 |
2013 | Queen Anne's | 17.004.13 | Centreville Middle | Flooring | Replace carpet with VCT in the media center and the main office. | $ 25,000 | $ 24,542 | $ 24,542 | 1 |
2013 | Queen Anne's | 17.009.13 | Grasonville Elementary | Flooring | Replace original carpet with VCT in the main office and the music room. Replace original carpet with VCT in Rooms 189, 190, 191, 192, speech room, communication room and faculty lounge. | $ 23,220 | $ 23,220 | $ 23,220 | 1 |
2013 | Queen Anne's | 17.021.13 | Bayside Elementary | Flooring | Replace carpet with VCT in the music room. | $ 11,570 | $ 11,570 | $ 11,570 | 1 |
2013 | Queen Anne's | 17.009.13 | Grasonville Elementary | Security System | Install proximity card readers at the bus entrance, gym entrance and side portable entrance to secure the building. | $ 12,600 | $ 11,466 | $ 11,466 | 1 |
2013 | Howard | 13.002.13 | Oakland Mills High | Electrical Update | Replace the original 1973 electrical service, which included metering cabinet, main disconnect compartment, main distribution boards and associated sub-panels, transformers, wire and conduit. Electrical equipment installed during the 2005 addition/renovation will not be replaced. | $ 370,000 | $ 348,000 | $ 348,000 | 1 |
2013 | Howard | 13.002.13 | Oakland Mills High | Emergency Generator | Provide a replacement natural-gas emergency stand-by generator. Replace the single automatic transfer switch with two transfer switches to comply with new code requirements for life safety classifications. The generator shall be upsized to accommodate new critical loads/equipment and future growth. | $ 150,000 | $ 113,000 | $ 113,000 | 1 |
2013 | Wicomico | 22.002.13 | Pinehurst Elementary | Hot Water Heater | Remove the boiler and provide a dedicated 100 gallon hot water heater in C-wing. | $ 25,000 | $ 25,000 | $ 25,000 | 1 |
2013 | Baltimore City | 30.191.13 | Brehms Lane Elementary #231 | Asphalt and Concrete Replacement | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 160,000 | $ 158,230 | $ 158,230 | 1 |
2013 | Baltimore City | 30.256.13 | Furley Elementary # 206 | Asphalt and Concrete Replacement | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 78,000 | $ 76,615 | $ 76,615 | 1 |
2013 | Baltimore City | 30.256.13 | Furley Elementary # 206 | Playground Surfacing | Playground surface removal and replacement of one (1) pour rubber surface. | $ 24,000 | $ 23,965 | $ 23,965 | 1 |
2013 | Baltimore City | 30.271.13 | Grove Park PK-8 # 224 | Domestic/Storm Drain Replacement | Replace domestic and storm drains in identified areas. | $ 20,000 | $ 19,923 | $ 19,923 | 1 |
2013 | Baltimore City | 30.210.13 | Garrett Heights PK-8 #212 | Asphalt and Concrete Removal and Replacement | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 88,000 | $ 87,930 | $ 87,930 | 1 |
2013 | Baltimore City | 30.076.13 | Govans Elementary #213 | Asphalt and Concrete | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 89,000 | $ 88,465 | $ 88,465 | 1 |
2013 | Baltimore City | 30.267.13 | Eutaw Marshburn Elementary #011 | Playground Surfacing | Playground surface removal and replacement of one pour rubber surface. | $ 37,000 | $ 36,720 | $ 36,720 | 1 |
2013 | Baltimore City | 30.267.13 | Eutaw Marshburn Elementary #011 | Asphalt and Concrete Removal and Replacement | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 92,000 | $ 91,870 | $ 91,870 | 1 |
2013 | Baltimore City | 30.249.13 | Diggs Johnson Building #162 | Asphalt and Concrete removal and replacement | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 63,000 | $ 62,865 | $ 62,865 | 1 |
2013 | Baltimore City | 30.260.13 | Barclay PK-8 #054 | Asphalt and Concrete | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. | $ 69,500 | $ 69,340 | $ 69,340 | 1 |
2013 | Baltimore City | 30.021.13 | Hamilton Building #041 aka City Neighbors | Asphalt and Concrete | Remove and replace deteriorated concrete sidewalk and curb also to include resurfacing and stripping of the parking lot. 5" concrete approximately 7,085 sf; 3,120 SY of asphalt. | $ 142,000 | $ 141,185 | $ 141,185 | 1 |
2013 | Baltimore City | 30.202.13 | City Springs PK-8 #008 | Asphalt and Concrete | Remove and replace deteriorated concrete sidewalk and curb. 5" concrete approximately 2,774 sf. | $ 30,000 | $ 29,460 | $ 29,460 | 1 |
2013 | Anne Arundel | 02.072.13 | West Meade EEC | Flooring | Replace asbestos containing building material (acrylic ceramic tile) with non-asbestos containing building material (vinyl ceramic tile). | $ 162,500 | $ 85,879 | $ 85,879 | 1 |
2013 | Anne Arundel | 02.133.13 | Old Mill South Middle | Folding Door | Replace one folding door in the mini gym. | $ 40,000 | $ 60,637 | $ 60,367 | 1 |
2013 | Anne Arundel | 02.040.13 | Arundel High | Auditorium Seating | Replace auditorium seating that has deteriorated due to age. | $ 350,000 | $ 129,032 | $ 129,032 | 1 |
2013 | St. Mary's | 18.002.13 | Spring Ridge Middle | Gym Floor | Complete replacement of the 6,000 sf existing wood floor with a new wood floor. | $ 118,000 | $ 98,567 | $ 98,567 | 1 |
2013 | St. Mary's | 18.002.13 | Spring Ridge Middle | Gym Lights | Replacement of the existing (35) 400 watt metal halide lights and (8) 300 watt incandescent lights with 78 watt LED High Bay lights. | $ 36,000 | $ 42,795 | $ 42,795 | 1 |
2013 | St. Mary's | 18.002.13 | Spring Ridge Middle | Moveable Wall | Replace the motorized moveable partition wall separating the cafeteria and gymnasium. | $ 102,000 | $ 99,900 | $ 99,900 | 1 |
2013 | Harford | 12.022.13 | Homestead Wakefield Elementary | Paving | Replacement of the loading dock service entrance. | $ 27,000 | $ 25,250 | $ 25,250 | 1 |
2013 | Kent | 14.002.13 | Galena Elementary | Security System | Install new CCTV cameras to enhance security. | $ 26,240 | $ 25,696 | $ 25,696 | 1 |
2013 | Harford | 12.005.13 | Havre de Grace High | Plumbing | Replace incoming water service from road to building. | $ 82,026 | $ 82,026 | $ 82,026 | 1 |
2013 | Prince George's | 16.144.13 | Catherine T. Reed Elementary | Pipe Insulation Replacement | Replace and insulate piping in the ceiling throughout the school. This project is for the original building and not for the 1999 addition. | $ 200,000 | $ 230,326 | $ 230,326 | 1 |
2013 | Prince George's | 16.144.13 | Catherine T. Reed Elementary | Parking Lot Repairs | Refurnish parking to include lot 4" base, 4" coarse, 2" fine and stripe. | $ 375,000 | $ 359,942 | $ 359,942 | 1 |
2013 | Baltimore City | 30.203.13 | Samuel Coleridge Taylor Elementary #122 | ADA Elevator | Install exterior ADA elevator on south end of building to allow entry to separate interior floors. | $ 715,000 | $ 715,000 | $ 715,000 | 1 |
2013 | Montgomery | 15.062.13 | Rosemary Hills Elementary | Masonry Wall Repairs | Repair large section of exterior masonry wall, this area of repairs is outside rooms 400 thru 403. | $ 281,000 | $ 280,577 | $ 280,577 | 1 |
2013 | Montgomery | 15.154.13 | Clearspring Elementary | Asphalt Replacement | Replace asphalt in bus loop and parking lot, project includes re-stripping new asphalt as required. | $ 94,000 | $ 96,923 | $ 96,923 | 1 |
2013 | Montgomery | 15.259.13 | Roberto Clemente Middle | Asphalt Replacement | Replace asphalt in front bus loop and parking lot, project includes re-stripping new asphalt as required. | $ 153,898 | $ 164,020 | $ 164,020 | 1 |
2013 | Montgomery | 15.147.13 | Flower Hill Elementary | Asphalt Replacement | Replace asphalt in bus loop and parking lot, project includes re-stripping new asphalt as required. | $ 70,000 | $ 77,273 | $ 77,273 | 1 |
2013 | Montgomery | 15.093.13 | Olney Elementary | Asphalt Replacement | Replace asphalt parking lot including re-stripping new asphalt as required. | $ 50,000 | $ 99,563 | $ 99,563 | 1 |
2013 | Montgomery | 15.135.13 | Sherwood High | Asphalt Replacement | Replace asphalt in bus loop and parking lot, project includes re-stripping new asphalt as required. | $ 425,000 | $ 417,675 | $ 417,675 | 1 |
2013 | Harford | 12.029.13 | Ring Factory Elementary | Storm Water Management | Replace inflow pipe from parking lot to storm water management pond and reconstruct two inlets. | $ 37,619 | $ 37,619 | $ 37,619 | 1 |
2014 | Kent | 14.004.14 | Rock Hall Elementary | Security Cameras | Install additional security cameras to enhance school security. | $ 35,885 | $ 28,856 | $ 28,856 | 1 |
2014 | Dorchester | 09.008.14 | New Directions Learning Academy | Chiller Replacement | Replace chiller and burner assemblies, including associated controls. | $ 262,925 | $ 45,873 | $ 45,873 | 1 |
2014 | Frederick | 10.052.14 | Orchard Grove Elementary | HVAC | Replace a failing split system HVAC unit and associated zone damper system. | $ 80,141 | $ 80,141 | $ 80,141 | 1 |
2014 | Frederick | 10.014.14 | Woodsboro Elementary | Roof Replacement | Replace the 1972 roof; sections B & E totaling 6,791 sf. | $ 145,000 | $ 145,000 | $ 145,000 | 1 |
2014 | Baltimore City | 30.188.14 | Walbrook Building #411 | Track Renovations | Refurbish/replace existing sports running track. | $ 237,400 | $ 237,332 | $ 237,332 | 1 |
2014 | Baltimore City | 30.260.14 | Barclay PK-8 #054 | Bathroom Plumbing Replacement | Remove and dispose of approximately 500 ft in total of 4”, 3”, 2”, 1 ¼”, and ¾” galvanized water piping in the crawl space, 1st, 2nd and 3rd floor boys rest rooms. Supply and install approximately 500 ft in total of 4”, 3”, 2”, 1 ¼”, and ¾” copper pipe to replace the pipe removed above. Supply and install all fittings necessary to connect the new piping to the existing piping. Supply and install necessary support hangers and insulation for all of the new piping and fittings installed. | $ 45,000 | $ 57,620 | $ 57,620 | 1 |
2014 | Baltimore City | 30.110.14 | Baltimore City College High #480 | Bleacher Replacement | Remove and dispose of existing wood bench seating on the side of the field behind the school. Replace +/- 1,750 LF of 9 .5 " aluminum bench. Benches will be anodized installation of the aluminum bench seating will be on existing supports. Fabricate and install handrails and widen existing center steps to 48" to meet code. | $ 34,940 | $ 34,900 | $ 34,900 | 1 |
2014 | Baltimore City | 30.069.14 | Mt. Royal Elementary/Middle #066 | Playground Renovation | Remove and replace rubber surface at playground. | $ 20,000 | $ 19,560 | $ 19,560 | 1 |
2014 | Baltimore City | 30.017.14 | Commodore John Rodgers PK-8 #027 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 23,000 | $ 22,112 | $ 22,112 | 1 |
2014 | Baltimore City | 30.025.14 | Hampstead Hill Academy PK-8 #047 | Intercom System Replacement | Provide and install Bogen multicom 48 intercom system for administrative and classroom paging. | $ 21,000 | $ 19,055 | $ 19,055 | 1 |
2014 | Montgomery | 15.068.14 | Gaithersburg Middle | Flooring | Refinish the 22 year old gymnasium wood floor that is occupied, peeling and missing game lines. | $ 38,416 | $ 38,416 | $ 38,416 | 100 |
2014 | Montgomery | 15.011.14 | Woodlin Elementary | Flooring | Replace the original synthetic gym floor that has exceeded it's life-cycle and is cracking and delaminating and is a safety concern. | $ 90,908 | $ 90,908 | $ 90,908 | 100 |
2014 | Montgomery | 15.249.14 | Piney Branch Elementary | Ceiling Replacement (Phase I) | Replace the original acoustical ceiling system and light fixtures that are in poor condition and requires a high degree of maintenance. | $ 74,437 | $ 69,865 | $ 69,865 | 100 |
2014 | Montgomery | 15.147.14 | Flower Hill Elementary | Ceiling Replacement (Phase I) | Replace the original acoustical ceiling system and light fixtures that are in poor condition and requires a high degree of maintenance. | $ 51,817 | $ 51,817 | $ 51,817 | 100 |
2014 | Montgomery | 15.143.14 | Woodfield Elementary | Ceiling Replacement (Phase I) | Replace the original acoustical ceiling system and light fixtures that are in poor condition and requires a high degree of maintenance. | $ 46,188 | $ 46,188 | $ 46,188 | 100 |
2014 | Montgomery | 15.072.14 | Twinbrook Elementary | Ceiling Replacement (Phase I) | Replace the original acoustical ceiling system and light fixtures that are in poor condition and requires a high degree of maintenance. | $ 79,459 | $ 79,459 | $ 79,459 | 100 |
2014 | Montgomery | 15.090.14 | Damascus High | Windows | Replace 33 year old media center and main courtyard exterior windows that are in poor condition and are fogging and leaking causing water/air infiltration and health and security issues. | $ 77,163 | $ 77,163 | $ 77,163 | 100 |
2014 | Montgomery | 15.164.14 | Brook Gove Elementary | Windows | Replace 23 year old courtyard and stairwells exterior windows that are in poor condition and are fogging and leaking causing water/air infiltration and health and security issues. | $ 99,730 | $ 98,985 | $ 98,985 | 100 |
2014 | Montgomery | 15.081.14 | Takoma Park Elementary | Masonry Work | Repair large section of exterior masonry wall that is failing allowing water infiltrations and posing indoor air quality and health concerns. | $ 49,850 | $ 49,850 | $ 49,850 | 100 |
2014 | Harford | 12.034.14 | Church Creek Elementary | Storm Water Management | Install three inlets, repair curb, pavement and sidewalks around the inlets. | $ 20,122 | $ 20,122 | $ 20,122 | |
2014 | Anne Arundel | 02.085.14 | Brooklyn Park Elementary | Elevator | Restore existing elevator that has deteriorated due to age. | $ 195,300 | $ 253,000 | $ 253,000 | |
2014 | Anne Arundel | 02.030.14 | Annapolis High | Elevator | Restore existing elevator that has deteriorated due to age. | $ 238,000 | $ 238,000 | $ 238,000 | |
2014 | Anne Arundel | 02.061.14 | Annapolis Middle | Replace Folding Door | Replace folding door in mini gym that has deteriorated due to age. | $ 42,370 | $ 42,370 | $ 42,370 | |
2014 | Anne Arundel | 02.117.14 | Central Elementary | Replace Folding Door | Replace folding door in mini gym that has deteriorated due to age. | $ 12,700 | $ 12,630 | $ 12,630 | |
2014 | Anne Arundel | 02.095.14 | Marley Glen Special | Replace Folding Door | Replace folding door in café/gym that has deteriorated due to age. | $ 30,000 | $ 30,000 | $ 30,000 | |
2014 | Baltimore County | 03.173.14 | Charlesmont Elementary | Boiler Replacement | Replace 1962 boiler with new boiler. | $ 510,000 | $ 675,997 | $ 675,997 | |
2014 | Baltimore County | 03.133.14 | Dulaney High | Lighting | Remove original 1984 ceiling and lighting in corridors and replace with new lay-in ceiling system and light fixtures. | $ 305,000 | $ 159,120 | $ 159,120 | |
2014 | Baltimore County | 03.004.14 | Fullerton Elementary | Electric Service | Upgrade the primary original 1976 electric service to school to expand electrical capacity and replace electric service panels that are past their useful life. | $ 330,000 | $ 159,500 | $ 159,500 | |
2014 | Baltimore County | 03.112.14 | Joppa View Elementary | Boiler Replacement | Replace original 1990 boiler with new boiler. | $ 480,000 | $ 259,583 | $ 259,583 | |
2014 | Baltimore County | 03.149.14 | Lansdowne High | Sound System Replacement | Replace original 1963 sound system in Auditorium. | $ 107,000 | $ 99,512 | $ 99,512 | |
2014 | Baltimore County | 03.084.14 | Lansdowne Middle | Unit Ventilator Replacement | Replace the original 1971 unit ventilators in seven (7) classrooms with new unit ventilators, associated piping, and controls. | $ 378,000 | $ 355,555 | $ 355,555 | |
2014 | Baltimore County | 03.154.14 | Loch Raven Technical Academy | Locker Replacement | Replace original 1961 student lockers in corridors. | $ 250,000 | $ 157,900 | $ 157,900 | |
2014 | Baltimore County | 03.155.14 | Norwood Elementary | Intercom System | Remove original 1968 intercom system throughout building and replace with new system. | $ 71,500 | $ 59,533 | $ 59,533 | |
2014 | Baltimore County | 03.079.14 | Oliver Beach Elementary | Electric Service | Upgrade original 1981 electric service to school to expand electrical capacity and replace electric service panels that are past their useful life. | $ 330,000 | $ 219,687 | $ 219,687 | |
2014 | Baltimore County | 03.121.14 | Parkville High | Intercom/Clock/PA System | Remove original 1968 intercom, clock, and PA systems throughout building and replace with new integrated system. | $ 590,000 | $ 342,458 | $ 342,458 | |
2014 | Carroll | 06.036.14 | Westminster West Middle | Fire Alarm Replacement | Upgrade old system to new addressable system. | $ 321,227 | $ 137,261 | $ 137,261 | |
2014 | Howard | 13.002.14 | Oakland Mills High | Interior Building Renovations (Phase I) | Renovation of gang toilets includes: new fixtures, toilet partitions, toilet accessories, wall and floor finishes, ceiling, domestic water piping, sanitary piping, door frames and doors, lighting and updated mechanical systems. | $ 360,000 | $ 175,687 | $ 175,687 | |
2014 | Prince George's | 16.011.14 | Largo High | Asbestos Abatement | Reinsulate A/C chill water piping and replace ceiling tile in the entire building. | $ 375,000 | $ 334,365 | $ 334,365 | |
2014 | Prince George's | 16.178.14 | Hyattsville Middle | HVAC | Replace cooling tower. | $ 150,000 | $ 100,437 | $ 100,437 | |
2014 | Prince George's | 16.039.14 | Mt. Rainier Elementary | Windows | Replace exterior 120 windows in the entire building. | $ 125,000 | $ 125,000 | $ 125,000 | |
2014 | Prince George's | 16.124.14 | Nicholas Orem Middle | Gym Lockers and Benches | Replace lockers and benches in boys and girls gyms. | $ 60,000 | $ 37,700 | $ 37,700 | |
2014 | Prince George's | 16.177.14 | Parkdale High | Gym Lockers and Benches | Replace lockers and benches in boys and girls gyms. | $ 70,000 | $ 63,300 | $ 63,300 | |
2014 | Prince George's | 16.195.14 | Kenilworth Elementary | Building Interior Renovation | Replace front and back storefront of main lobby including lobby ceiling. | $ 250,000 | $ 101,250 | $ 101,250 | |
2014 | Prince George's | 16.211.14 | Gwynn Park Middle | HVAC | Replace chill water valve in penthouse and re-insulate. | $ 25,000 | $ 14,170 | $ 14,170 | |
2014 | Prince George's | 16.181.14 | Robert Goddard Montessori | Water Line | Replace domestic main water line. | $ 125,000 | $ 148,051 | $ 148,051 | |
2014 | Prince George's | 16.183.14 | William Wirt Middle | Water Line | Replace domestic main water line. | $ 30,000 | $ 30,000 | $ 30,000 | |
2014 | Wicomico | 22.018.14 | Mardela Middle/High | Plumbing | Replace existing hot water generators with new gas fired high efficiency water heaters and associated hot water storage tank including all new mixing valves. | $ 140,500 | $ 96,132 | $ 96,132 | |
2014 | Worcester | 23.002.14 | Pocomoke Elementary | Replace Folding Partitions | Replace operable folding partition in cafeteria/gymnasium area. | $ 48,000 | $ 48,003 | $ 48,003 | |
2014 | Cecil | 07.040.14 | North East High | Elevator Replacement | Replace the 1970 hydraulic elevator with a hole-less elevator, replacing all equipment, the cab, doors and hardware. | $ 155,000 | $ 105,778 | $ 105,778 | 1 |
2014 | Queen Anne's | 17.013.14 | Church Hill Elementary | Security | Install a two (2) door video Intercom system, five (5) indoor IP-cameras and 13 outdoor IP-cameras, a video recording server running ONSSI Ocularis IS Video Surveillance Management System and required port of entry switches. | $ 49,592 | $ 48,976 | $ 48,976 | 1 |
2014 | St. Mary's | 18.020.14 | Great Mills High | Security Locks | Replace 30 unit locks, modify 61 mortise locks, and replace four (4) mortise locks. | $ 39,000 | $ 35,288 | $ 35,288 | 1 |
2014 | St. Mary's | 18.017.14 | Lettie Marshall Dent Elementary | Security Locks | Replace 33 unit locks and replace 10 cylinders to double sided keyed cylinders. | $ 17,000 | $ 17,000 | $ 17,000 | 1 |
2014 | Harford | 12.031.14 | North Bend Elementary | Carpet Replacement | The existing carpet in the entire building is being replaced with carpet (25 year warranty) and VCT. | $ 90,000 | $ 51,933 | $ 51,933 | 1 |
2014 | Baltimore City | 30.236.14 | Joseph C. Briscoe Building #451 for New Hope Academy | Sidewalk and Parking Lot | Replace 925 sf sidewalk, 52 LF concrete curbing, and 51 SY concrete dumpster pad. | $ 49,000 | $ 48,120 | $ 48,120 | 1 |
2014 | Baltimore City | 30.203.14 | The Historic Samuel Coleridge -Taylor #122 | Sidewalk and Parking Lot | Remove and replace 4,721 sf of sidewalk, including 28 LF of curb and gutters. Remove and replace approximately 1,681 SY of asphalt parking lot and repaint pavement markings. | $ 46,000 | $ 45,015 | $ 45,015 | 1 |
2014 | Baltimore City | 30.023.14 | Federal Hill Prep PK-5 #045 | Sidewalk and Parking Lot | Remove and replace 1,345 sf of concrete sidewalk, 11 SY concrete apron and resurface 297 SY asphalt in dumpster/loading area. | $ 42,000 | $ 38,420 | $ 38,420 | 1 |
2014 | Baltimore City | 30.276.14 | Bragg Nature Learning Center | Sidewalk and Parking Lot | Resurface 2' of roadway from Rt. 40 West; approximately 40' from the bus company gates. Mill joints at Rt. 40 West, the automotive repair garage, and the far end of the road near the bus company gate. Furnish and install surface course | $ 77,000 | $ 75,114 | $ 75,114 | 1 |
2014 | Baltimore City | 30.197.14 | James McHenry Building #010 | Sidewalk and Parking Lot | Remove and replace 996 sf of sidewalk, including 16 LF of curb & gutters. Remove and replace approximately 1,681 SY of asphalt parking lot and repaint pavement markings. | $ 45,000 | $ 40,385 | $ 40,385 | 1 |
2014 | Baltimore City | 30.135.14 | Liberty PK-5 #064 | Sidewalk and Parking Lot | Remove and replace 1,115 sf of sidewalk, including 28 LF of curb & gutters. Remove and replace approximately 1,181 SY of asphalt parking lot and repaint pavement markings. | $ 52,000 | $ 43,120 | $ 43,120 | 1 |
2014 | Baltimore City | 30.130.14 | Langston Hughes Elementary #005 | Sidewalk and Parking Lot | Remove and replace 4,673 sf of sidewalk, including 4 LF of curb. Remove and replace approximately 1,019 SY of asphalt parking lot and repaint pavement markings. | $ 65,000 | $ 64,330 | $ 64,330 | 1 |
2014 | Baltimore City | 30.186.14 | Armistead Gardens PK-8 #243 | Sidewalk and Parking Lot | Remove and replace 3,662 sf of sidewalk, including 6 SY of concrete apron, and 38 LF curb for ADA accessibility. Remove and replace approximately 3,823 SY of asphalt parking lot and repaint pavement markings. | $ 85,000 | $ 82,985 | $ 82,985 | 1 |
2014 | Baltimore City | 30.053.14 | Collington Square PK-8 #097 | Piping | Remove approximately 300 feet of 3" domestic cold water piping from the boiler room to the hallway on the side of the office and replace with new copper pipe and fittings. | $ 42,000 | $ 40,650 | $ 40,650 | 1 |
2014 | Baltimore City | 30.243.14 | Franklin Square PK-8 #095 | Piping | Remove and replace malfunctioning pressure reducing valve, strainer, leaking main valve, secondary valve, and bypass in the boiler room. Remove and replace 20' of domestic cold water line associated with valve replacement. | $ 17,500 | $ 15,612 | $ 15,612 | 1 |
2014 | Caroline | 05.005.14 | Lockerman Middle | Window Replacement | Replace several sets of windows located around the interior courtyard near the south west end of the building. | $ 67,500 | $ 50,562 | $ 50,562 | 1 |
2014 | Harford | 12.020.14 | C. Milton Wright High | Concrete | Repair concrete at main entrance. | $ 96,000 | $ 95,908 | $ 95,908 | 1 |
2014 | Harford | 12.045.14 | Riverside Elementary | Fence Replacement | Replace the rusty 4' chain link fence with a new 4' vinyl coated chain like fence located along Haverhill Road, it will serve as a boundary between the baseball field and the road. | $ 11,000 | $ 9,906 | $ 9,906 | 1 |
2014 | Baltimore City | 30.195.14 | Beechfield PK-8 #246 | Sidewalk and Parking Lot | Remove and replace approximately 343 SY of asphalt roadway, and adjacent concrete pavement. Replace approximately 1,076 sf of sidewalk. Front left side stairwell: replace railing, replace the top concrete step, repair spalled concrete area at the bottom of the steps and the bluestone wall cap (approximately 45 sf). Remove the existing deteriorated asphalt roadway leading to the rear of the school to a depth of 10". In the concrete area adjacent to it, remove the deteriorated concrete pavement to a depth of 10". Furnish and install 6" RC-6 subbase and 4" of surface course HMA; approximately 343 SY. At front left side stairwell, replace deteriorated top step and repair +/- 3' x 3' spalled concrete area at bottom of steps. Make necessary masonry repairs to 45 sf. Of the Bluestone wall cap at main entrance of school. Replace approximately 4' of missing silver colored steel horizontal safety railing at left side front stairwell. Remove and replace deteriorated concrete sidewalk with 5" thick new concrete sidewalk. Remove and replace approximately 4 LF of concrete curb a total of 1,076 sf. | $ 67,000 | $ 66,800 | $ 66,800 | |
2014 | Baltimore City | 30.045.14 | Windsor Hills PK-8 #087 | Playground Renovation | Remove and replace rubber surface at playground around playground equipment. | $ 42,000 | $ 32,401 | $ 32,401 | |
2014 | Baltimore City | 30.189.14 | Hazelwood K-8 #210 | Playground Renovation | Remove and replace rubber surface at playground around playground equipment | $ 33,000 | $ 27,491 | $ 27,491 | |
2014 | Baltimore City | 30.244.14 | Martin Luther King PK-8 #254 | Playground Renovation | Remove and replace rubber surface at playground around playground equipment | $ 29,000 | $ 27,916 | $ 27,916 | |
2014 | Baltimore City | 30.111.14 | Fredrick Douglass High #450 | Sidewalk and Parking Lot | Remove and replace sidewalk and stone wall top. This area is adjacent to the tennis court and field; remove and replace the existing deteriorated concrete | $ 75,000 | $ 74,265 | $ 74,265 | 1 |
2014 | Baltimore City | 30.249.14 | Diggs-Johnson Building #162 (for Southwest Baltimore Charter K-8) | Domestic Water Line Replacement | Remove and dispose of approximately 80 ft of 4" galvanized domestic cold water and approximately 280 ft of 3" galvanized domestic cold water line that has failed. Supply and install copper pipe and fittings for the domestic cold water line, removed above, from the boiler room to the mechanical room above the kitchen. Remove and dispose of approximately 80 ft of 2" galvanized hot water supply and recirculate line. Supply and install copper pipe and fittings to replace the galvanized line removed above. Supply and install new support hangers as necessary for the pipe being replaced. Supply and install insulation for the new pipe and fittings. | $ 90,000 | $ 90,000 | $ 90,000 | |
2014 | Charles | 08.005.14 | General Smallwood Middle | HVAC (Phase 2) | Replace approximately seven (7) unit ventilators. | $ 51,435 | $ 45,416 | $ 45,416 | 1 |
2014 | Baltimore City | 30.197.14 | James McHenry Building #010 | Lighting Replacement | Remove and replace interior lighting for hallways and classrooms | $ 98,000 | $ 98,000 | $ 98,000 | 1 |
2014 | Baltimore City | 30.086.14 | John Ruhrah PK-8 #228 | Asphalt and Concrete | Removal and replacement of a poured rubber playground surface. | $ 33,000 | $ 32,020 | $ 32,020 | 1 |
2014 | Washington | 21.026.14 | Smithsburg High | ADA Accessibility Upgrades | Modify the boys and girls locker rooms and the exterior ramp to meet ADA accessibility requirements. Also, replace the existing covered concrete ramp between the main school building and a separate classroom and technical education building. | $ 161,000 | $ 134,904 | $ 134,904 | 1 |
2014 | Calvert | 04.021.14 | St. Leonard Elementary | Folding Partition | Replace the original folding partition which divides the gymnasium from the cafetorium. | $ 52,000 | $ 38,292 | $ 38,292 | 1 |
2014 | Talbot | 20.006.14 | Chapel District Elementary | Temperature Control System | Upgrade existing Johnson Control DDS Metasys system with a new Bacnet Extended Architecture System. | $ 40,000 | $ 40,000 | $ 41,010 | 1 |
2015 | Garrett | 11.005.15 | Southern High | Lighting | Install nine (9) poles and 22 high efficiency fixtures to provide adequate lighting. | $ 124,200 | $ 148,098 | $ 148,098 | |
2015 | Carroll | 06.036.15 | Westminster West Middle | Fire Alarm Replacement | Replace the old fire alarm system with a new addressable system. | $ 194,300 | $ 57,039 | $ 57,039 | 1 |
2015 | Carroll | 06.042.15 | Westminster High | Stage Floor Replacement | Replace the original stage floor in the auditorium. | $ 52,675 | $ 52,675 | $ 52,675 | 1 |
2015 | Carroll | 06.001.15 | North Carroll High | Piping | Replace the deteriorated waterline piping located in the main mechanical room. | $ 43,950 | $ 43,950 | $ 43,950 | 1 |
2015 | Carroll | 06.001.15 | North Carroll High | Stage Curtain Replacement | Replace all the original stage curtains except the main stage curtain. | $ 15,636 | $ 15,636 | $ 15,636 | 1 |
2015 | Wicomico | 22.002.15 | Pinehurst Elementary | Cooling Tower Replacement | Replace an existing 450gpm BAC Series V cooling tower including underground piping and two (2) existing pumps, upgrade energy management system (EMS) controls as required. | $ 150,000 | $ 117,473 | $ 117,473 | |
2015 | Charles | 08.005.15 | General Smallwood Middle | HVAC Unit Ventilator Replacements (Phase III) | Replace approximately five (5) HVAC unit ventilators. | $ 52,385 | $ 49,796 | $ 49,796 | |
2015 | Kent | 14.006.15 | Garnett Elementary | Grease Traps | Install grease traps as per town code. | $ 18,800 | $ 18,800 | $ 18,800 | 1 |
2015 | Kent | 14.003.15 | Kent County Middle | Grease Traps | Install grease traps as per town code. | $ 16,300 | $ 16,300 | $ 16,300 | 1 |
2015 | Baltimore City | 30.248.15 | Curtis Bay PK-8 #207 | Playground Refurbishment | Remove and replace rubber surface on playground. | $ 37,000 | $ 35,148 | $ 35,148 | 1 |
2015 | Baltimore City | 30.144.15 | Tench Tilghman PK-8 #013 | Playground Refurbishment | Remove and replace rubber surface on playground. | $ 42,000 | $ 42,000 | $ 41,420 | 1 |
2015 | Baltimore City | 30.275.15 | Thomas G Hayes Building (NAF) #102 | Asphalt and Concrete Replacement | Remove deteriorated asphalt parking area, sidewalk and ramp areas and replace with new and reline parking spaces. Remove and replace deteriorated pavement to a depth of 4" and replace with base course bituminous concrete averaging four 4" in compacted thickness. This area is approximately 55 SY. Mill all tie-in edges at existing concrete and around all utility structures. Remove all existing concrete bumpers prior to resurfacing. Dispose of approximately 12 broken concrete bumpers. After the resurfacing, replace approximately 21 existing bumpers and furnish and install 12 new concrete bumpers. Furnish and install surface course (12.5 MM Superpave) averaging two 2" in compacted thickness. This area is approximately 1,801 SY. Price includes new pavement markings. Remove and replace designated concrete sidewalk and pavement. These areas total approximately 256 SY. Rebuild deteriorated top 12" of masonry inlet that is currently covered with a steel plate. | $ 85,000 | $ 61,810 | $ 61,810 | 1 |
2015 | Baltimore City | 30.053.15 | Collington Square PK-8 #097 | Underground Storage Tank | Remove and replace 10,000 gal underground oil storage tank. | $ 215,000 | $ 225,336 | $ 225,336 | 1 |
2015 | Baltimore City | 30.242.15 | Matthew A. Henson Elementary #029 | Underground Storage Tank | Remove one (1) 10,000 gal underground oil storage tank. | $ 195,000 | $ 184,900 | $ 117,326 | 1 |
2015 | Cecil | 07.027.15 | Bohemia Manor Middle/High | Gym Floor | Complete replacement of deteriorated gym floor. | $ 157,256 | $ 150,057 | $ 150,057 | 100 |
2015 | Cecil | 07.019.15 | Conowingo Elementary | Gym Floor | Complete replacement of deteriorated gym floor. | $ 46,703 | $ 53,903 | $ 53,903 | 1 |
2015 | Somerset | 19.004.15 | Crisfield High | Wall Tile Replacement | Repair wall tile wainscoting in one corridor. | $ 31,781 | $ 31,781 | $ 31,781 | 1 |
2015 | Somerset | 19.010.15 | Princess Anne Elementary | Carpet Replacement | Replace existing areas of carpet in classrooms, media center and administrative offices with new resilient sheet flooring (25 year warranty) including wall base throughout areas of work. | $ 42,470 | $ 51,185 | $ 51,185 | 1 |
2015 | Baltimore City | 30.268.15 | The Mt. Washington School #221 | Asphalt and Concrete Replacement | Remove and replace the badly deteriorated concrete sidewalk with new 5" thick concrete sidewalk. These areas total approximately 2297 sf. Furnish and install two (2) 2' x 4' ADA Detectable Warning Surface mats, or, 16 sf. Two days of miscellaneous masonry repair work; laborers included. Resurface the existing playground area (NW corner of Sulgrave and Lochlea) with surface course bituminous concrete averaging 1 1/2' in compacted thickness. Price includes all necessary prep work. This area is approximately 1,620 SY. | $ 63,000 | $ 58,725 | $ 58,725 | |
2015 | Baltimore City | 30.134.15 | Calvin Rodwell Elementary #256 | Asphalt and Concrete Replacement | Remove and replace the badly deteriorated concrete sidewalk with new 5" thick concrete sidewalk. These areas total 1,271 sf. Remove and replace designated deteriorated concrete curb. These areas total approximately 30 LF. Remove existing pavement to a depth of 14". Furnish and install a new concrete dumpster pad, 12' x 21'. Pad will be 8" thick reinforced concrete on 6" RC-6 aggregate sub base. Remove and replace the existing set of steps on the 40' x 19' wide and consist of approximately 11 risers. The existing railings will be reused. Resurface the existing parking lot on the Liberty Heights Ave side of school with surface course bituminous concrete averaging 2" in compacted thickness. This lot is approximately 1,273 SY. Restripe after paving in a similar layout as now exists. Repair approximately 28 LF of the concrete wall supporting the existing trench drain in the parking lot. In the existing grass area west of the existing parking lot, excavate area to a depth of 10" and haul material off-site. Furnish and install 6" depth of RC-6 sub base and 4" depth of new 12.5 MM bituminous surface course to provide additional parking. This area is approximately 40' x 127', or 565 SY. Furnish and install 22 concrete parking bumpers on the east and west sides of this new lot. Provide pavement markings. | $ 98,600 | $ 98,525 | $ 98,525 | |
2015 | Baltimore City | 30.191.15 | Brehms Lane Elementary #231 | Asphalt and Concrete Replacement | Remove and replace the designated deteriorated concrete steps. These steps include approximately 119 LF of treads and 105 sf of concrete landings. | $ 19,000 | $ 17,725 | $ 17,725 | |
2015 | Baltimore City | 30.147.15 | Paul Laurence Dunbar Middle Building (NAF) #133 | Asphalt and Concrete Replacement | Remove and replace designated deteriorated concrete pavement. Replace with new 8" thick reinforced concrete pavement using high-early strength concrete. These areas total 275 SY. Excavate existing HMA pavement behind school near loading dock for new concrete dumpster pad. Furnish and install 6" depth of RC-6 sub base. Furnish and place high early strength concrete reinforced with wire mesh to a depth of 8''. This area will be 24' x 24', or, 64 SY. Prep work to prepare for the parking lot resurfacing. Excavate existing designated failed pavement to a depth of 3'' and replace with 3'' of HMA base course. These areas total approximately 144 SY. Mill all areas of tie-ins. Remove the existing 22 parking bumpers to allow for the resurfacing. Adjust utility structure elevations, as needed. Furnish and install a 2'' HMA resurfacing of all asphalt parking lots and drive lanes. These areas total approximately 4,253 SY. Price includes pavement markings. After the resurfacing, reset the 22 existing parking bumpers to their original location. | $ 98,000 | $ 97,910 | $ 97,910 | |
2015 | Baltimore City | 30.023.15 | Federal Hill Prep PK-5 #045 | Door and Frame Replacement | Demo 16 doors/hardware. Supply and install new 13/insert frames. Supply and install new 16/each FRP Doors-blue in color. Supply and install required new hardware, panic bars/cylinders/keys, deadbolts, flush pull handles, gear hinges LCN (heavy duty) closer's, kick plates, door sweeps, thresholds. Remove existing door alarms, reinstall. Clean construction site daily; remove all debris from property. | $ 52,380 | $ 52,380 | $ 52,380 | |
2015 | Baltimore City | 30.064.15 | Walter P. Carter PK-8 #134 | Underground Storage Tank Replacement | Provide heating fuel system equipment upgrades including new double wall steel jacketed 10,000 gal UST and double wall piping system. Replace asphalt in area of replacement. | $ 198,000 | $ 293,842 | $ 293,842 | 1 |
2015 | Baltimore County | 03.130.15 | Westchester Elementary | Boiler Replacement | Replace two (2) original 1998 boilers with two (2) new high efficiency boilers. | $ 468,899 | $ 458,899 | $ 458,899 | |
2015 | Baltimore County | 03.074.15 | Jacksonville Elementary | Boiler Replacement | Replace original 1993 boilers with new high efficiency boilers. | $ 469,788 | $ 437,959 | $ 437,959 | |
2015 | Howard | 13.002.15 | Oakland Mills High | Interior Building Renovation (Phase II) | Included in the base bid work are boys and girls locker room, men's and women's PE office, men's and women's gym public toilets. Work to include complete demolition of existing fixtures, plumbing, flooring and finishes. The toilets are part of the original 1973 building and in disrepair and can no longer be maintained as many parts are no longer available. New work to include new fixtures, toilet partitions, toilet accessories, wall and floor finishes, ceiling, domestic water piping, sanitary piping, door frames and doors, lighting and updated mechanical systems. New toilet rooms will meet ADA accessibility requirements. (Alternates: men's and women's stage, custodial, health, men's and women's staff, main office and kitchen.) | $ 250,000 | $ 87,776 | $ 87,776 | 1 |
2015 | Prince George's | 16.113.15 | James H. Harrison Elementary | UV Replacement | Replace 12 unit ventilators and condensing units in wings C and D installed in 1969. | $ 375,000 | $ 278,013 | $ 278,013 | 1 |
2015 | Prince George's | 16.178.15 | Hyattsville Middle | Elevator Replacement | Replace the 1973 elevator. | $ 275,000 | $ 215,052 | $ 215,052 | 1 |
2015 | Prince George's | 16.144.15 | Catherine T. Reed Elementary | Generator Replacement | Install a new 30kw generator to serve the entire 1966 original building and the 1968 and 1999 additions for a total of 56,889 sf. The generator will provide emergency electrical power to the existing emergency panel that now consists of circuits that feed the fire alarm system, PA system, exit lights, night lights, outlets in the health room, and outlets in the special education classrooms where needed. The emergency panel output is through the whole building. The generator will be located outside of the boiler room. This will require a concrete pad, conduit and wiring from the generator to the new transfer switch. | $ 82,000 | $ 56,793 | $ 56,793 | 1 |
2015 | Prince George's | 16.057.15 | Apple Grove Elementary | Generator Replacement | Install a new 30kw generator to serve the original 1967 building and the 1998 addition for a total of 51,842 sf. The generator will provide emergency electrical power to the existing emergency panel that now consists of circuits that feed the fire alarm system, PA system, exit lights, night lights, outlets in the health room, and outlets in the special education classrooms where needed. The emergency panel output is through the whole building. The generator will be located outside of the boiler room and will require a concrete pad, conduit and wiring from the generator to the new transfer switch. | $ 82,000 | $ 66,120 | $ 66,120 | 1 |
2015 | Prince George's | 16.087.15 | Suitland High | Generator Replacement | Replace the existing obsolete 75kw generator with a new one to serve the renovated 1986 facility for a total of 344,875 sf. The generator will provide emergency electrical power to the existing emergency panel that now consists of circuits that feed the fire alarm system, PA system, exit lights, night lights, and the elevator. The exit lights and night lights are located throughout the whole school except the Auditorium and Vo-Tech which have their own generators. | $ 70,000 | $ 64,921 | $ 64,921 | 1 |
2015 | Prince George's | 16.081.15 | University Park Elementary | Generator Replacement | Replace the existing obsolete 12.5kw generator with a new 15kw generator to serve the original 1978 building and the 1989 and 2000 addition for a total of 56,264 sf. The existing generator provides emergency electrical power to the existing emergency panel that now consists of circuits that feed the fire alarm system, PA system, and night lights. The night lights are located throughout the whole school. The emergency panel output is through the whole building. There will be a new emergency panel with capacity for more electrical circuits for better service and future expansion. | $ 44,403 | $ 44,393 | $ 44,393 | 1 |
2015 | Harford | 12.020.15 | C. Milton Wright High | Bleacher Replacement | Remove existing main gym bleachers and replace with electrically operated system. | $ 93,813 | $ 88,948 | $ 88,948 | 1 |
2015 | Harford | 12.047.15 | Roye Williams Elementary | Chair Lift Replacement | Remove and replace with a lift that is in compliance with American Society of Mechanical Engineers (ASME) A8.1-2011. | $ 20,975 | $ 20,975 | $ 20,975 | 1 |
2015 | Harford | 12.020.15 | C. Milton Wright High | Folding Divider Curtain | Remove the existing folding wall divider in the gym and replace with new vinyl roll up folding divider curtain. | $ 16,678 | $ 16,678 | $ 16,678 | 1 |
2015 | Harford | 12.021.15 | Magnolia Middle | Folding Partition | Remove the existing folding partition on the activity room stage and replace with a new folding partition. | $ 11,801 | $ 11,801 | $ 11,801 | 1 |
2015 | Carroll | 06.002.15 | Northwest Middle | Chalk Board Removal | Remove 45 chalkboards in the building with asbestos abatement. | $ 32,600 | $ 14,781 | $ 14,781 | 1 |
2015 | Carroll | 06.039.15 | Runnymede Elementary | Piping | Replace 1,500 ft of water line from the well that serves the school building. | $ 32,055 | $ 32,055 | $ 32,055 | 1 |
2015 | Carroll | 06.043.15 | Oklahoma Road Middle | Door Replacement | Replace the exterior and interior doors (each set has one (1) double and single door) located at the school's main entrance, and one (1) set of exterior doors (staff entrance) at the end of the academic wing. | $ 48,965 | $ 48,965 | $ 48,965 | 1 |
2015 | Carroll | 06.042.15 | Westminster High | Bleacher Replacement | Replace the lower set of bleachers located inside the main gymnasium. | $ 64,995 | $ 64,995 | $ 64,995 | 1 |
2015 | Prince George's | 16.103.15 | Surrattsville High | Locker Replacement | Replace the student corridor lockers (approximately 2,500) installed in 1960, 1962, 1984, 1989 and 1990. | $ 352,000 | $ 337,200 | $ 337,200 | 1 |
2015 | Anne Arundel | 02.018.15 | Central Middle | Elevator | Restore existing elevator due to deterioration from age. | $ 250,000 | $ 241,000 | $ 241,000 | |
2015 | Anne Arundel | 02.044.15 | George Fox Middle | Elevator | Restore existing elevator due to deterioration from age. | $ 250,000 | $ 259,000 | $ 259,000 | |
2015 | Anne Arundel | 02.020.15 | Glen Burnie High | Elevator | Restore existing elevator in building A, due to deterioration from age. | $ 250,000 | $ 174,490 | $ 174,490 | |
2015 | Frederick | 10.041.15 | Ballenger Creek Middle | Door and Window Frame Repair | Repair 25 of the schools leaking door and window frame flashing assemblies, replace deteriorated flashing assemblies, and saw-cutting and re-sealing of narrowed control joints. | $ 171,609 | $ 167,423 | $ 167,073 | |
2015 | Frederick | 10.006.15 | Emmitsburg Elementary | Oil Tank Removal | Remove one (1) 10,000 gallon oil tank and replace the void with fill. | $ 28,169 | $ 22,801 | $ 22,801 | |
2015 | Queen Anne's | 17.004.15 | Centreville Middle | Plumbing | Replace failing grinder pump, assoicated piping, guide rails and control panel. | $ 35,000 | $ 35,000 | $ 35,000 | 1 |
2015 | Harford | 12.022.15 | Homestead/Wakefield Elementary | Motor Control Replacement | Replace the motor control center in the boiler room serving the Homestead building. | $ 45,374 | $ 44,791 | $ 44,791 | 1 |
2015 | Talbot | 20.002.15 | Easton High | Network Cabling | Replace existing 18 year old local area network cabling with new category 6 structured cabling system. This improved system cabling will support voice, data, and imaging applications within the facility along with any additional secured entrances that may be required at a later time. | $ 53,678 | $ 53,678 | $ 53,678 | 1 |
2015 | Talbot | 20.002.15 | Easton High | Security Cameras | Replace existing 18 year old security cameras with new. | $ 13,334 | $ 13,266 | $ 13,266 | 1 |
2015 | Caroline | 05.001.15 | Greensboro Elementary | Plumbing | Connect school to town water. School is currently on well water maintained by Board of Education. Town is extending municipal water past the school to new fire house. | $ 40,000 | $ 38,537 | $ 38,537 | 1 |
2015 | Worcester | 23.011.15 | Pocomoke Middle | Roof Drains | Remove gravel, strippings and flashing from 25 roof drains. Install new drain flashings. Remove bitumen membrane at drains and install emulsion at the edge of bitumen membrane and gravel. | $ 12,620 | $ 13,870 | $ 13,870 | 1 |
2015 | Worcester | 23.007.15 | Buckingham Elementary | Renovations | Remove existing and provide/install new countertops, sinks, faucets, drawer fronts and cabinets in 12 classrooms, guidance office and nurse's office. | $ 21,656 | $ 21,656 | $ 23,800 | 1 |
2015 | Harford | 12.001.15 | Fallston High | Site | Replace metal chain link fence adjacent to stream and field. | $ 11,400 | $ 11,478 | $ 11,478 | 1 |
2015 | Caroline | 05.001.15 | Greensboro Elementary | Plumbing | Pull and seal old water wells. | $ 20,000 | $ 3,000 | $ 3,000 | 1 |
2015 | Caroline | 05.009.15 | Career & Technology Center | Renovation | Renovate boys and girls gang restrooms. | $ 20,000 | $ 12,509 | $ 12,509 | 1 |
2015 | Harford | 12.047.15 | Roye Williams Elementary | Site | Replace metal chain fence around the playground area. | $ 10,219 | $ 10,219 | $ 10,219 | 0 |
2015 | Harford | 12.051.15 | Churchville Elementary | Site | Replace metal chain fence around the perimeter. | $ 29,714 | $ 29,715 | $ 29,715 | 1 |
2015 | Caroline | 05.009.15 | Career & Technology Center | Plumbing | Replace failing lift station for waste water. | $ 20,000 | $ 16,640 | $ 16,640 | 1 |
2015 | Garrett | 11.012.15 | Crellin Elementary | Window Replacement | Replace original, single pane windows in the 1st, 2nd and 3rd grade classrooms. Install new, energy efficient windows. Overall size of the windows will be reduced and excess wall space will be insulated and covered with matching exterior and interior materials. | $ 37,750 | $ 37,750 | $ 37,750 | 1 |
2015 | Garrett | 11.015.15 | Yough Glades Elementary | Interior Renovation | Repair vinyl walls and drywall as needed. Install ceramic tiles on the walls; floor level to 6' high on the wall. Remainder of the wall will be covered with vinyl. | $ 60,500 | $ 48,604 | $ 48,604 | 1 |
2015 | Cecil | 07.019.15 | Conowingo Elementary | Carpet Replacement | Material and Install, including remove and haul away Mohawk Faculty Remix Modular Tile 24" x 24", minor floor patching and scraping and finish off with Johnson 4" Cove Base in ocated in the office, waiting area, assistant principal, principal, conference room and hallways. | $ 10,000 | $ 10,000 | $ 9,975 | 1 |
2015 | Somerset | 19.007.15 | Deal Island Elementary | Fire Alarm System | Upgrade the existing fire alarm system by installing a new panel, remote annunciator, new horn strobes, new pull stations, and new smoke detectors in common areas. | $ 18,611 | $ 8,700 | $ 8,700 | 1 |
2015 | Somerset | 19.011.15 | Ewell Elementary | Fire Alarm System | Upgrade the existing fire alarm system by installing a new panel, new horn strobes, new pull stations, and new smoke detectors in common areas. | $ 16,308 | $ 7,750 | $ 7,750 | 1 |
2015 | Queen Anne's | 17.004.15 | Centreville Middle | Camera Surveillance | Install 12 indoor IP cameras and video systems monitoring solutions running ONSSI Ocularis Video surveillance Management System and required POE switches. | $ 24,043 | $ 24,043 | $ 24,043 | 1 |
2015 | Baltimore City | 30.148.15 | Fallstaff PK-8 #241 | Asphalt and Concrete Replacement | Remove deteriorated sidewalk areas and replace with new. The area is approximately 4,927 sf. Remove and replace deteriorated concrete curb. These areas are approximately 243 LF. Remove and replace existing concrete steps on the Gist Ave side of school. These steps are 10' wide, have 12" treads with 7" risers. The old handrails will be replaced with new handrails. Make concrete wall repairs at four (4) designated areas on the wall surrounding the playground area. | $ 60,000 | $ 59,140 | $ 59,140 | 1 |
2015 | Baltimore City | 30.271.15 | Grove Park PK-8 #224 | Asphalt and Concrete Replacement | Remove deteriorated sidewalk and ramp areas and replace with new. | $ 70,000 | $ 60,985 | $ 60,985 | 1 |
2015 | Baltimore City | 30.208.15 | Steuart Hill PK-5 #004 | Playground Refurbishment | Remove and replace rubber surface on playground. | $ 34,000 | $ 33,809 | $ 33,809 | 1 |
2015 | Baltimore City | 30.203.15 | The Historic Samuel Coleridge-Taylor #122 | Asphalt and Concrete Replacement | Remove deteriorated asphalt parking area, sidewalk and ramp areas and replace with new and reline parking spaces. Additional areas identified in rear and side of school; remove and replace designated deteriorated concrete sidewalk approximately 787 sf (Preston St) rear of school asphalt lot HMA patching remove and replace designated areas of repairs to a depth of 5 " and haul material off site. Furnish and install new bituminous concrete averaging 5" in depth. | $ 22,000 | $ 21,585 | $ 21,585 | 1 |
2015 | Baltimore City | 30.236.15 | Joseph C. Briscoe Building (New Hope Academy # 345) | Asphalt and Concrete Replacement | Remove deteriorated asphalt parking area, sidewalk and ramp areas and replace with new and reline parking spaces. Additional areas identified in rear and side of school; remove and replace designated deteriorated concrete sidewalk, approximately 1,485 sf remove and replace approximately 23 LF of concrete curb, remove and replace two areas of concrete aprons, approximately 12 SY. HMA patching at designated locations remove the existing deteriorated asphalt pavement to a depth of 5" and haul material off site. Furnish and install new bituminous concrete to a depth of 5" total approximately 166 SY. | $ 30,000 | $ 29,145 | $ 29,145 | 1 |
2015 | Baltimore City | 30.197.15 | James McHenry Building #010 | Asphalt and Concrete Replacement | Remove deteriorated asphalt parking area, sidewalk and ramp areas and replace with new and reline parking spaces. Additional areas identified in rear and side of school. | $ 70,000 | $ 69,505 | $ 69,505 | 1 |
2015 | Montgomery | 15.147.15 | Flower Hill Elementary | Ceiling and Lighting Replacement | Replace the original stained and rusted acoustical ceiling system and light fixtures that are in poor condition and require a high degree of maintenance. | $ 56,922 | $ 56,922 | $ 56,922 | |
2015 | Montgomery | 15.143.15 | Woodfield Elementary | Ceiling and Lighting Replacement | Replace the original stained and rusted acoustical ceiling system and light fixtures that are in poor condition and require a high degree of maintenance. | $ 165,000 | $ 155,321 | $ 155,321 | |
2015 | Montgomery | 15.221.15 | Laytonsville Elementary | Gym Floor | Replace the synthetic gym floor with a wood gym flooring system. | $ 95,000 | $ 90,319 | $ 90,319 | |
2015 | Montgomery | 15.147.15 | Flower Hill Elementary | Gym Floor | Replace the synthetic gym floor with a wood gym flooring system. | $ 95,000 | $ 74,871 | $ 74,871 | |
2015 | Montgomery | 15.081.15 | Takoma Park Elementary | Exterior Windows - Phase I & II | Phase I - Replacement of windows in room numbers 204, 300A, 300B, 300C, 301, 302, 401, 402, 403, and stairwell #3. Phase II - Replacement of windows in room numbers 318, 400, 500, 506, 507, 508, 509, 510 | $ 65,000 | $ 97,680 | $ 97,680 | |
2015 | Montgomery | 15.249.15 | Piney Branch Elementary | Ceiling and Lighting Replacement | Replace the original stained and rusted acoustical ceiling system and light fixtures that are in poor condition and require a high degree of maintenance. | $ 125,729 | $ 125,727 | $ 125,727 | |
2015 | Calvert | 04.004.15 | Calvert Elementary | HVAC Replacement | Replace existing wall hung air handling unit with a new three (3) ton wall unit, ceiling modifications, registers, grilles, thermostat and controls in two (2) classrooms. | $ 36,000 | $ 29,287 | $ 29,287 | 1 |
2015 | Washington | 21.036.15 | Smithsburg Elementary | Boiler Replacement | Remove and replace the two (2) existing 1.6 MBTU H.B. Smith boilers and support components. The existing fuel oil pump and associated fuel oil supply lines located in the boiler room (from the wall to the pumps) are to be replaced. Additionally, the existing heating water pumps and heating water piping are to be replaced to support a new heating water circulation loop, and the new boiler equipment. The existing pneumatic controls are to be replaced with DDC controls in the boiler room. All necessary equipment, and all components associated with the new installation (i.e. concrete pads, electrical panels, breeching, controls, disconnects, etc.) are to be included in the scope of work in order to achieve a complete, new heating water plant. | $ 350,000 | $ 134,904 | $ 134,904 | 1 |
2015 | Dorchester | 09.005.15 | Vienna Elementary | Concrete Replacement | Remove and replace sidewalk, curbs and gutters that have subsided, degraded, spalled or cracked over the last 58 years. Replacement in kind. | $ 10,000 | $ 11,752 | $ 11,752 | 1 |
2015 | Dorchester | 09.011.15 | Warwick Elementary | Flooring | Replace (primary areas) of remaining 38 year old original floorcovering in pod and media center areas. Miscellaneous abatement included. | $ 18,000 | $ 16,248 | $ 16,248 | 1 |
2015 | Dorchester | 09.001.15 | Sandy Hill Elementary | Flooring | Replace (primary areas) of 41 year old floorcovering in administrative corridor, health suite, and action areas 1 and 2. Miscellaneous abatement included. | $ 10,292 | $ 10,292 | $ 10,292 | 1 |
2015 | St. Mary's | 18.011.15 | Oakville Elementary | Communication Systems | Provide purchase and installation for (2) two Brocade 48 port network switch's for access for all technology in the school (computers, cameras, computers). Replace the Bogen public address system console which is over 15 years old. Add (22) twenty-two 802.11 AC Aruba access data points to increase the wireless technology capabilities in support of the PARCC requirements. | $ 27,466 | $ 18,891 | $ 18,891 | 100 |
2015 | St. Mary's | 18.014.15 | Mechanicsville Elementary | Communication Systems | Provide purchase and installation for (3) three Brocade 48 port network switch's for access for all technology in the school (computers, cameras, computers). Replace the Bogen public address system console which is over 15 years old. Add (29) twenty-nine 802.11 AC Aruba access data points to increase the wireless technology capabilities in support of the PARCC requirements. | $ 22,608 | $ 22,598 | $ 22,598 | 100 |
2015 | Cecil | 07.019.15 | Conowingo Elementary | PA/Intercom System | Upgrade the existing PA/Intercom system. | $ 20,000 | $ 20,000 | $ 18,555 | 1 |
2015 | Frederick | 10.032.16 | Kemptown Elementary | Generator & Transfer Switch Replacement | Replacement of the original 1981 diesel generator & transfer switch with a new generator that will be natural gas and provide emergency lighting. | $ 130,000 | $ 28,377 | $ 28,377 | |
2016 | Caroline | 05.006.16 | Ridgely Elementary | Energy Management System Controls Upgrade | Upgrade of the energy management system controls to one section of the building, which will enable the HVAC system to improve the cycle pattern thus increasing operational efficiency. | $ 19,345 | $ 19,345 | $ 19,345 | |
2016 | Garrett | 11.014.16 | Northern High | HVAC Replacement | Replacement of the existing in-room unit ventilator with a high efficiency heat pump system that will provide heating and cooling in the 2nd floor business/computer classroom lab. | $ 10,250 | $ 10,250 | $ 10,250 | |
2016 | Garrett | 11.005.16 | Southern High | HVAC Replacement | Replacement of the existing in-room unit ventilator with a high efficiency heat pump system that will provide heating and cooling in the computer lab classroom. | $ 10,250 | $ 10,250 | $ 10,250 | |
2016 | Montgomery | 15.275.16 | Shady Grove Middle | Flooring | Replacement of original deteriorated carpet in 28 classrooms with VCT and replace carpet in Main Office and Media Center with "Shaw" life time warranty carpet. | $ 49,337 | $ 49,337 | $ 49,337 | 1 |
2016 | Montgomery | 15.158.16 | Quince Orchard High | Asphalt Parking Lot | Repair and re-surface asphalt parking lots, bus loops and loading dock areas. Scope of work includes new line painting. | $ 278,171 | $ 276,401 | $ 276,401 | 1 |
2016 | Montgomery | 15.182.16 | John T. Baker Middle | Asphalt Parking Lot | Repair and re-surface existing asphalt parking lots, bus loop, and driveway areas with new asphalt. Scope of work includes new line painting of asphalt. | $ 124,499 | $ 123,899 | $ 123,899 | 1 |
2016 | Montgomery | 15.249.16 | Piney Branch Elementary | Exterior Doors | Replacement of 22 exterior doors, frames, hardware and transom window lights with new hollow metal doors, frames, hardware and transom windows. | $ 133,655 | $ 134,451 | $ 134,451 | 1 |
2016 | Montgomery | 15.127.16 | Julius West Middle | Stair Treads | Replacement of existing cracked, chipped and broken stair treads with new rubber stair treads on 10 of the 12 exiting stairwells. | $ 18,563 | $ 18,563 | $ 18,563 | 1 |
2016 | Prince George's | 16.110.16 | Charles Carroll Middle | Roof Top Units | Replacement of three (3) multi-zone RTU's. | $ 462,693 | $ 419,900 | $ 419,900 | |
2016 | Anne Arundel | 02.054.16 | North County High | Elevator | Restore existing elevator. | $ 256,000 | $ 243,000 | $ 243,000 | |
2016 | Anne Arundel | 02.020.16 | Glen Burnie High | Elevator | Restore existing elevator in building F. | $ 256,000 | $ 252,000 | $ 252,000 | |
2016 | Washington | 21.014.16 | Greenbrier Elementary | Emergency Power Connection | Upgrade the current electrical system through the addition of a docking station and manual transfer switch (MTS 1200A) that will allow a portable generator to be brought to the site and connected to the building. This facility currently does not have an emergency generator. | $ 126,000 | $ 50,084 | $ 50,084 | |
2016 | Talbot | 20.002.16 | Easton High | Lighting Replacement | Replacement of 20 of the 32 existing metal halide parking lot lights with newer LED technology that will be more energy efficient, provide longer life and significantly reduce relamp maintenance costs. | $ 10,297 | $ 10,547 | $ 10,547 | |
2016 | Dorchester | 09.012.16 | South Dorchester PK-8 | Parking Lot | Repave the staff/parent parking lot. | $ 38,292 | $ 38,292 | $ 38,292 | |
2016 | Prince George's | 16.196.16 | Walker Mill Middle | Kitchen Renovation | Disconnect, remove, and dispose of the following equipment: One (1) walk-in refrigerator. Two (2) electric ranges. Supply and Install The following Equipment: 1. One 11'10" x 7'8" x 8'6" walk-in refrigerator. 2. One 12' x 12' x 8'6" walk-in freezer. | $ 295,000 | $ 222,019 | $ 222,019 | |
2016 | Prince George's | 16.165.16 | J. Frank Dent Elementary | Kitchen Renovations | Replacement of one (1) serving line. Supply and install a fire suppression system in the existing hood. | $ 80,000 | $ 66,220 | $ 66,220 | |
2016 | Prince George's | 16.164.16 | Ardmore Elementary | Parking Lot | Install erosion control as needed. Deep patch any areas of questionable sub-base with minimum of 6" cr-6 and base asphalt to level with milled surface. All surface asphalt to be done concurrently and after all milling and repairs have been made to prevent any damage during construction with top-soil, K-32 grass seed mix and straw as needed. | $ 250,000 | $ 250,000 | $ 109,335 | |
2016 | Prince George's | 16.164.16 | Ardmore Elementary | Fire Alarm Replacement | Replacement of the fire alarm system. | $ 125,000 | $ 125,000 | $ 125,000 | |
2016 | Prince George's | 16.152.16 | Benjamin Stoddert Middle | Exterior Renovation | Correct Water Infiltration - excavate around the southwest perimeter of the building, shore up & stabilize building, repair cracks and holes in walls and foundation, replace foundation drainage system. | $ 76,274 | $ 66,397 | $ 66,397 | |
2016 | Prince George's | 16.229.16 | Thomas Johnson Middle | Flooring | Replacement of the asbestos containing flooring specifically in the classroom areas (117, 113A, 100A, 100B, 227A, 216, 212, and MPR Closet). | $ 80,000 | $ 68,597 | $ 68,597 | |
2016 | Howard | 13.073.16 | Triadelphia Ridge Elementary | Fire Safety | Replacement of the original 1998 fire pump and underground vault including demolition of the existing underground vault, fire pump, piping, and associated wiring and control panels. | $ 210,000 | $ 146,547 | $ 146,547 | |
2016 | Baltimore City | 30.090.16 | Thomas Jefferson PK-8 #232 | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk and concrete curb; resurface the existing parking lot; installation of ADA detectable warning surfaces at two (2) ramps; installation of one (1) large dumpster pad; and replace designated set of steps. | $ 122,000 | $ 117,038 | $ 117,038 | |
2016 | Baltimore City | 30.243.16 | Franklin Square PK-8 #095 | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk and curb; installation of paving fabric in playground area. | $ 40,000 | $ 39,205 | $ 39,205 | |
2016 | Harford | 12.044.16 | Bakerfield Elementary | Fence Replacement | Replacement of 900 LF of 4" metal chain link fence adjacent to field and creek. | $ 21,500 | $ 21,407 | $ 21,407 | |
2016 | Baltimore City | 30.115.16 | Francis M. Wood Building #178 (for #429 Vivian Thomas Medical Arts Academy High) | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk; resurface the Calhoun St. Lot; installation of a new concrete dumpster pad; replacement of the deteriorated front concrete steps where needed. | $ 66,000 | $ 64,890 | $ 64,890 | |
2016 | Baltimore City | 30.185.16 | Baltimore Polytechnic Institute High #403 | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk, curb and steps; and repair designated deteriorated portions of existing concrete cheek walls on stairs leading to athletic fields. | $ 170,000 | $ 168,147 | $ 168,147 | |
2016 | Baltimore City | 30.227.16 | Western High #407 | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk and curb; repair designated deteriorated portions of existing concrete cheek walls on stairs leading to athletic fields; repair sinkhole in the front entrance road | $ 90,000 | $ 89,719 | $ 89,719 | |
2016 | Baltimore City | 30.246.16 | Edmondson High #400A | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk and curb; installation of two (2) concrete dumpster pads; resurface the existing front parking lots including loading dock area; resurface the roadway leading to the rear of building. | $ 199,000 | $ 141,908 | $ 198,230 | |
2016 | Baltimore City | 30.181.16 | Francis Scott Key Elementary/Middle #076 | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete sidewalk; installation of a new concrete dumpster pad; replacement of designated concrete apron at rear entrance; replacement of concrete curb and gutter in front of the concrete apron. | $ 91,000 | $ 89,929 | $ 89,929 | |
2016 | Frederick | 10.060.16 | Lewistown Elementary | Gym HVAC | Provide one (1) new HVAC unit for the 2,500 sf gym. | $ 154,245 | $ 146,900 | $ 146,900 | |
2016 | Harford | 12.025.16 | John Archer Special Education | Paving | Removal of approximately 390 SY of 6" paving in the roadway, undercut 200 CY of existing 18" sub base and place geotextile, CR refill 4" base and 2" surface. | $ 48,000 | $ 47,690 | $ 47,690 | |
2016 | Carroll | 06.024.16 | Francis Scott Key High | Basketball Hoist | Replacement of the old manual winches with new electric winches so that the baskets can be raised and lowered safely and efficiently. | $ 18,800 | $ 18,800 | $ 18,800 | |
2016 | Baltimore City | 30.229.16 | Northwood Elementary #242 | Asphalt & Concrete Replacement | Replacement of designated deteriorated concrete curb, concrete apron and steps. | $ 129,000 | $ 128,258 | $ 128,258 | |
2016 | Baltimore City | 30.246.16 | Edmondson High #400A | Tennis Court Refurbishment | Refurbish 3 tennis courts and install new fencing surrounding courts, pave to existing slope & grade. | $ 155,000 | $ 141,908 | $ 141,908 | |
2016 | Baltimore City | 30.193.16 | Sinclair Lane Elementary #248 | Playground Surfacing Rubber | Replacement of the existing playground surface. | $ 30,500 | $ 30,200 | $ 30,200 | |
2016 | Baltimore City | 30.253.16 | Gilmor Elementary #107 | Concrete, Asphalt, and Track Replacement | Replacement of designated deteriorated concrete sidewalk, steps, and concrete apron; resurface playground area. | $ 147,000 | $ 146,690 | $ 146,690 | |
2016 | Queen Anne's | 17.023.16 | Kent Island High | Security | Camera Surveillance - Install ten (10) new indoor IP cameras. | $ 25,000 | $ 25,000 | $ 23,013 | |
2016 | Queen Anne's | 17.013.16 | Church Hill Elementary | Security | Camera Surveillance - Install four (4) new indoor IP cameras. | $ 10,000 | $ 9,968 | $ 9,968 | |
2016 | Queen Anne's | 17.004.16 | Centreville Middle | Security | Camera Surveillance - Install four (4) new indoor IP cameras. | $ 10,000 | $ 9,820 | $ 9,820 | |
2016 | Queen Anne's | 17.014.16 | Sudlersville Elementary | Handicap Door Operators | Install handicap door operators at the main vestibule entrance. | $ 35,000 | $ 6,801 | $ 6,801 | |
2016 | Washington | 21.035.16 | Old Forge Elementary | Emergency Power Connection | Upgrade the electrical system through the addition of a docking station and switchboard with Kirk/Key (2000A) interface that will allow a portable generator to be brought to the site and connected to the building. This facility currently does not have an emergency generator. | $ 166,000 | $ 85,000 | $ 85,000 | |
2016 | Wicomico | 22.018.16 | Mardela Middle/High | Lift Pump Station Renovation & Upgrade | Replacement of the existing lift pump station and associated force mains; run new gravity sewer lines; upgrade piping, manholes and service connections; demo and repair disturbed areas of pavement, fencing at WWTP and restore site. | $ 160,000 | $ 119,463 | $ 119,463 | |
2016 | Cecil | 07.040.16 | North East High | Gymnasium Acoustics | Installation of sound absorbing panels along all four (4) walls of gym. | $ 45,000 | $ 40,616 | $ 40,616 | |
2016 | Garrett | 11.014.16 | Northern High | Athletic Field/Stadium Lights Electrical Service Replacement | Replacement of the underground electrical service to the athletic field and stadium lights; work will include a new trench, conduit, cable, breakers, panel box, and related supplies to each of the six (6) stadium light poles and stadium press box. | $ 71,696 | $ 41,582 | $ 41,582 | |
2016 | Allegany | 01.021.16 | South Penn Elementary | Chiller Replacement | Replacement of the 1991 chiller. | $ 260,000 | $ 195,582 | $ 195,582 | |
2016 | Baltimore County | 03.074.16 | Jacksonville Elementary | Flooring | Removal of existing carpet and replace with VCT in corridors, classrooms #1 through #35, library, cafeteria, and office. | $ 177,550 | $ 177,550 | $ 177,550 | |
2016 | Baltimore County | 03.086.16 | Seventh District Elementary | Lockers | Installation of lockers for the 3rd, 4th and 5th grade students located in interior classroom pods. | $ 41,500 | $ 40,000 | $ 40,000 | |
2016 | Baltimore County | 03.157.16 | Sandy Plains Elementary | Restroom Renovations | Renovation of the ventilation in two (2) gang toilet rooms. | $ 142,780 | $ 145,780 | $ 142,780 | |
2016 | Baltimore County | 03.161.16 | Carroll Manor Elementary | Structural | Repair of masonry of four (4) original chimneys. | $ 125,000 | $ 125,000 | $ 125,000 | |
2016 | Baltimore County | 03.013.16 | Prettyboy Elementary | Flooring | Removal of existing carpet and replace with VCT in corridors and classrooms. | $ 201,488 | $ 201,488 | $ 201,488 | |
2016 | Baltimore County | 03.002.16 | Chatsworth Elementary | Flooring | Removal of existing carpet and replace with VCT in corridors, office areas, and classrooms. | $ 125,000 | $ 131,000 | $ 131,000 | |
2016 | Baltimore County | 03.010.16 | Woodbridge Elementary | Flooring | Removal of existing carpet and replace with carpet tile in corridors, classrooms and open space areas. | $ 76,750 | $ 76,750 | $ 76,750 | |
2016 | Baltimore County | 03.165.16 | Overlea High | Chairlift | Replacement of the non-functional incline chair lift. | $ 63,546 | $ 62,046 | $ 62,046 | |
2016 | Baltimore County | 03.125.16 | Chadwick Elementary | Intercom System | Replacement of the intercom system. | $ 49,977 | $ 46,927 | $ 46,927 | |
2016 | St. Mary's | 18.016.16 | White Marsh Elementary | Replace Septic System | Abandonment of the currently failing existing system with flow able fill and the construction of a new septic system. The project includes the installation of two (2) 2,000 gallon septic tanks, gravity connections, approx. 608' of 2.5" pressure line to the drain field, 375' of septic drains. | $ 85,132 | $ 65,328 | $ 65,328 | |
2016 | Cecil | 07.040.16 | North East High | Gym Flooring | Refurbish existing gym floor with extensive sanding to remove all finishes and paint. Paint new school logo in center and new game lines on court including school name across baselines | $ 24,100 | $ 21,822 | $ 21,822 | |
2016 | Calvert | 04.002.16 | Mutual Elementary | Intercom System Replacement | Replacement of the original 1975 intercom system. | $ 29,000 | $ 20,602 | $ 20,602 | |
2016 | Calvert | 04.020.16 | Windy Hill Elementary | Intercom System Replacement | Replacement of the original 1996 intercom system. | $ 18,000 | $ 17,690 | $ 17,690 | |
2016 | Baltimore City | 30.023.16 | Federal Hill Prep PK-5 #045 | Storm Water Management | Replacement of storm drain reconnect to storm inlets; backfill and replace asphalt. | $ 45,000 | $ 45,000 | $ 18,189 | |
2016 | Somerset | 19.010.16 | Princess Anne Elementary | Gym Floor Replacement | Abatement of the entire 3,200 sf gymnasium floor and replacement of original 1977 floor with a seamless rubberized sports flooring. | $ 45,000 | $ 50,948 | $ 50,948 | |
2016 | Somerset | 19.014.16 | Greenwood Elementary | Gym Floor | Gym floor will be sanded, as well as minor patch/repair work as needed and include new graphics, game lines, and poly finish. | $ 12,000 | $ 11,195 | $ 11,195 | |
2016 | Somerset | 19.007.16 | Deal Island Elementary | Sidewalk Replacement | Replacement of existing 1,400 sf of concrete at the entry to the school. | $ 11,000 | $ 12,328 | $ 12,328 | |
2016 | Somerset | 19.010.16 | Princess Anne Elementary | Replace Main Entry Doors | Replacement of the existing two (2) pairs of 6' wide main entry doors, sidelights and new frames containing tempered low-e glass and heavy duty ADA compliant hardware. | $ 10,000 | $ 11,932 | $ 11,932 | |
2016 | Harford | 12.050.16 | Southampton Middle | Sidewalk and Curb Replacement | Replacement of curbs and sidewalks. | $ 54,832 | $ 55,001 | $ 55,001 | |
2016 | Harford | 12.046.16 | Joppatowne High | Sidewalk and Step Replacement | Replacement of front sidewalks (7,540 sf) and set of six (6) steps | $ 99,000 | $ 99,498 | $ 99,498 | |
2016 | Baltimore City | 30.276.16 | Bragg Nature Study Center | Asphalt Replacement | Replace entire roadway and resurface the bridge. | $ 60,000 | $ 57,775 | $ 57,775 | |
2016 | Kent | 14.007.16 | Kent County High | Flooring | Sand and refinish gymnasium flooring, repaint logo, sidelines, lane lines and court lines. | $ 25,000 | $ 25,328 | $ 25,328 | |
2016 | Talbot | 20.002.16 | Easton High | Lighting Systems | Replacement of 49 existing metal halide fixtures in gymnasium with LED High-Bay Luminaire type which will provide energy savings, longer life, and significantly reduce relamp maintenance costs. | $ 21,540 | $ 21,230 | $ 21,230 | |
2016 | Talbot | 20.007.16 | White Marsh Elementary | Lighting Systems | Replacement of 16 of 24 existing metal halide parking lot lights with newer LED technology that will be more energy efficient, provide longer life, and significantly reduce relamp maintenance costs. | $ 10,320 | $ 10,200 | $ 10,200 | |
2016 | Kent | 14.003.16 | Kent County Middle | Science Labs | Installation of water lines and cabinetry for a new science lab classroom. | $ 20,000 | $ 10,750 | $ 10,750 | |
2016 | Kent | 14.003.16 | Kent County Middle | Security Cameras | Installation of security cameras. | $ 17,000 | $ 4,870 | $ 4,870 | |
2016 | Carroll | 06.045.16 | Linton Springs Elementary | Sprinkler Head | Replacement of all sprinkler heads. | $ 17,915 | $ 17,915 | $ 17,915 | |
2016 | Caroline | 05.006.16 | Ridgely Elementary | Fire Alarm System Upgrade | Upgrade of the existing fire alarm system to improve operational efficiency. | $ 10,620 | $ 10,620 | $ 10,620 | |
2016 | Caroline | 05.005.16 | Lockerman Middle | Fire Alarm System Upgrade | Upgrades to the existing fire alarm system to improve operational efficiency. | $ 10,055 | $ 9,980 | $ 9,980 | |
2016 | Caroline | 05.003.16 | Denton Elementary | Fire Alarm System Upgrade | Replacement of the fire alarm control panel and associated hardware (pull stations, strobe lights, smoke detectors) throughout the building; work will include upgrades to the existing fire alarm system to improve operational efficiency. | $ 11,266 | $ 10,054 | $ 10,054 | |
2016 | Carroll | 06.045.16 | Linton Springs Elementary | Exterior Door | Replacement of the exterior and interior doors at main entrance, ball field side entrance doors, bus loop side entrance doors, and Ronsdale Road side entrance doors. | $ 53,733 | $ 55,858 | $ 55,858 | |
2016 | Carroll | 06.040.16 | Piney Ridge Elementary | Exterior Door | Replacement of the exterior and interior doors located at the main entrance. | $ 44,643 | $ 44,688 | $ 44,688 | |
2016 | Baltimore City | 30.263.16 | Dr. Roland N. Patterson, Sr. Building #082 | Repave Parking Lots | Repave and restripe parking spaces, crosswalks, and ADA compliant spaces. | $ 170,000 | $ 169,500 | $ 169,500 | |
2016 | Worcester | 23.009.16 | Snow Hill Middle | Repair Courtyard | Repair deteriorated concrete pad and improve drainage, demolish existing concrete, re-grade courtyard area and install new storm drainage and concrete pad. | $ 22,000 | $ 21,000 | $ 21,000 | |
2016 | Worcester | 23.014.16 | Stephen Decatur Middle | Repair Roof | Remove damaged roof shingles and underlayment and install new total 12,000 sf throughout various sections of the roof. | $ 14,000 | $ 10,610 | $ 10,610 | |
2016 | Charles | 08.011.16 | Arthur Middleton Elementary | Restroom Renovation | Move masonry walls in restroom, enlarge door frames, adjust the plumbing for proper ADA accessibility; Add space for assistance or changing table; install new carpeting and paint in the classroom where the restroom is located. | $ 32,000 | $ 49,560 | $ 49,560 | |
2016 | Cecil | North East High | Gym Lighting | Replacement of approximately 36 lights in the gym with new LED High Bay lights. | $ 20,000 | $ 13,597 | $ 13,597 | ||
2016 | Harford | 12.049.16 | Abingdon Elementary | Trench Drain Replacement | Replacement of trench drain with new 6" trench drain; work will include removal of approximately 230 sf of paving and installation of new 8" concrete and replacement of curbs. | $ 32,000 | $ 32,249 | $ 32,249 | |
2018 | Kent | 14.003.18 | Kent County Middle | Plumbing Replacement | Replacement of the leaky 75 ft drain pipes under the lobby area and roof drainage pipes. | $ 20,000 | $ 20,000 | $ 17,393 | |
2018 | Harford | 12.051.18 | Churchville Elementary | Sidewalk & Loading Dock Resurfacing | Replace the front sidewalk of the school including the bus loop and resurfacing of the loading dock. | $ 90,000 | $ 90,050 | $ 90,050 | |
2018 | Worcester | 23.009.18 | Snow Hill Middle | Door Replacement | Replacement of exterior doors/frames. | $ 18,900 | $ 18,900 | $ 18,900 | |
2018 | Caroline | 05.003.18 | Denton Elementary | Interior Renovation | Construction of interior walls within the existing media center area to establish two (2) additional classrooms. | $ 21,000 | $ 20,960 | $ 20,960 | |
2018 | Worcester | 23.004.18 | Stephen Decatur High | Roof Repair | Replacement of repair of approximately 3,600 sf of roof over the guidance area and two (2) classrooms. | $ 20,000 | $ 20,000 | $ 20,000 | |
2018 | Prince George's | 16.034.18 | Howard B. Owens Science Center | Generator Replacement | Remove and replace the existing 85 kw generator. | $ 100,000 | $ 100,000 | $ 77,344 | |
2018 | Prince George's | 16.052.18 | Woodridge Elementary | Generator Replacement | Replace and remove the existing generator. | $ 100,000 | $ 100,000 | $ 70,479 | |
2018 | Prince George's | 16.227.18 | Rosaryville Elementary | Generator Replacement | Replace the generator. | $ 60,000 | $ 60,000 | $ 38,376 | |
2018 | Prince George's | 16.108.18 | Greenbelt Elementary | Generator Replacement | Replace the generator. | $ 60,000 | $ 60,000 | $ 37,428 | |
2018 | Prince George's | 16.011.18 | Largo High | Generator Replacement | Replace the generator. | $ 60,000 | $ 60,000 | $ 38,376 | |
2018 | Prince George's | 16.041.18 | C. Elizabeth Rieg Regional | Generator Replacement | Replace the generator. | $ 100,000 | $ 100,000 | $ 73,271 | |
2018 | Prince George's | 16.050.18 | Phyllis E. Williams Elementary | Generator Replacement | Replace the generator. | $ 75,000 | $ 75,000 | $ 59,195 | |
2018 | Harford | 12.006.18 | Aberdeen Middle | Heating Loop Valve Replacement | Replace the heating loop valve. | $ 32,379 | $ 19,979 | $ 19,979 | |
2018 | Prince George's | 16.002.18 | Eleanor Roosevelt High | Bleacher Replacement | Replace the stadium bleachers; work will also include a new press box with new HVAC and electrical systems, and ADA ramp access and paths. | $ 654,426 | $ 654,426 | $ 654,426 | |
2018 | Carroll | 06.048.18 | Century High | Gym Floor | Refinish the gym floor. | $ 15,080 | $ 14,580 | $ 14,580 | |
2018 | Harford | 12.020.18 | C. Milton Wright High | Auxiliary Gym Bleacher Replacement | Replacement of the telescopic bleachers in the auxiliary gym. | $ 30,000 | $ 27,800 | $ 27,800 | |
2018 | Harford | 12.002.18 | Magnolia Elementary | Stage Folding Partition Replacement | Replacement of the manual folding partition located on the stage. | $ 15,000 | $ 11,990 | $ 11,990 | |
2018 | Harford | 12.018.18 | Center for Educational Opportunity | Folding Partition Wall Replacement | Replacement of the folding partition wall in the gym. | $ 20,000 | $ 13,430 | $ 13,430 | |
2018 | Carroll | 06.030.18 | Mt. Airy Elementary | Sidewalk | Replacement of the front sidewalk. | $ 43,000 | $ 43,000 | $ 43,000 | |
2018 | Carroll | 06.029.18 | Sykesville Middle | Fire Door Replacement | Replacement of four (4) fire doors containing asbestos. | $ 28,843 | $ 28,843 | $ 28,843 | |
2018 | Carroll | 06.033.18 | Manchester Elementary | Gym Floor | Refinish the flooring in the gym. | $ 10,736 | $ 10,736 | $ 10,736 | |
2018 | Carroll | 06.037.18 | Spring Garden Elementary | PA System Replacement | Replacement of the original school public address system. | $ 18,070 | $ 18,066 | $ 18,066 | |
2018 | Harford | 12.038.18 | Emmorton Elementary | Sprinkler Head Replacement | Replace the sprinkler heads. | $ 30,000 | $ 28,422 | $ 28,422 | |
2018 | Cecil | 07.041.18 | Leeds Elementary | Flooring/Stall Replacement | Replacement of the deteriorated flooring and stalls in the bathroom. | $ 23,300 | $ 23,300 | $ 21,262 | |
2018 | Caroline | 05.009.18 | Caroline Career and Technology Center | Main Office Relocation | Relocation of the main office. | $ 23,000 | $ 18,584 | $ 18,584 | |
2018 | Allegany | 01.029.18 | Frost Elementary | Roof Replacement | Replacement of the entire 41,457 sf roof. | $ 843,000 | $ 791,357 | $ 791,357 | |
2018 | Baltimore County | 03.011.18 | Perry Hall High | Auditorium Sound System Renovation | Replacement of the sound system and projector in the auditorium. | $ 98,000 | $ 98,000 | $ 79,000 | |
2018 | Baltimore City | 30.140.18 | Robert W. Coleman Elementary #142 | Asphalt & Concrete Replacement | Replacement of the asphalt and concrete in the parking lot area. | $ 87,000 | $ 69,700 | $ 69,700 | |
2018 | Baltimore City | 30.185.18 | Baltimore Polytechnic Institute High #403 | Asphalt & Concrete Replacement | Replacement of the asphalt and concrete in the band parking lot and field driveway. | $ 97,906 | $ 97,878 | $ 97,878 | |
2018 | Baltimore City | 30.111.18 | Frederick Douglass High #450 | Asphalt & Concrete Replacement | Replacement of the asphalt and concrete sidewalk. | $ 123,868 | $ 123,868 | $ 123,868 | |
2018 | Queen Anne's | 17.014.18 | Sudlersville Elementary | Access Control Upgrade | Security improvements including access control panels and card readers doors, door monitoring, electric locks and door button release systems. | $ 21,226 | $ 22,507 | $ 22,507 | |
2018 | Queen Anne's | 17.013.18 | Church Hill Elementary | Access Control Upgrade | Security improvements including access control panels and card readers doors, door monitoring, electric locks and door button release systems. | $ 25,493 | $ 24,205 | $ 24,205 | |
2018 | Frederick | 10.018.18 | Valley Elementary | Fire Alarm Replacement | Replacement of the fire alarm. | $ 75,000 | $ 75,000 | $ 75,000 | |
2018 | Wicomico | 22.002.18 | Pinehurst Elementary | Hot Water Heater Replacement | Replacement of the existing hot water heaters with two (2) natural gas fired water heaters. | $ 125,000 | $ 95,593 | $ 95,593 | |
2018 | Caroline | 05.003.18 | Denton Elementary | HVAC Installation | Installation of a HVAC system for the gym. | $ 20,000 | $ 20,000 | $ 19,386 | |
2018 | Dorchester | 09.009.18 | Cambridge-South Dorchester High | Window Replacement Phase II | Replacement of the remaining original window systems associated with the side of court yard that has classrooms. | $ 50,000 | $ 38,292 | $ 38,292 | |
2018 | Charles | 08.011.18 | Arthur Middleton Elementary | Kitchen Renovation | Replacement of the walk-in cooler and freezer boxes. | $ 551,785 | $ 52,663 | $ 52,663 | |
2018 | Frederick | 10.044.18 | Twin Ridge Elementary | UST Removal | Removal of the10,000 gallon underground fuel oil tank. | $ 20,767 | $ 20,766 | $ 20,766 | |
2018 | Montgomery | 15.182.18 | John T. Baker Middle | Ceiling and Lighting Replacement Phase II | Replacement of the original acoustical ceiling system and light fixtures. | $ 55,000 | $ 60,241 | $ 60,241 | |
2018 | Montgomery | 15.119.18 | White Oak Middle | Basketball Court Replacement | Replacement of two (2) poles, two (2) backboards, two (2) rims, and paint the basketball court areas. | $ 30,161 | $ 30,161 | $ 30,161 | |
2018 | Montgomery | 15.137.18 | Poolesville Elementary | Ceiling and Lighting Replacement Phase I | Replacement of the original acoustical ceiling system and light fixtures. | $ 156,302 | $ 155,127 | $ 155,127 | |
2018 | Montgomery | 15.045.18 | Col. Zadok Magruder High | Exterior Doors Replacement | Replacement of the rusted steel exterior doors that are causing a security risk to the facility. | $ 245,000 | $ 245,000 | $ 245,000 | |
2018 | Montgomery | 15.013.18 | Germantown Elementary | Ceiling and Lighting Replacement | Replacement of the original acoustical ceiling system and light fixtures. | $ 118,000 | $ 113,934 | $ 113,934 | |
2018 | Talbot | 20.006.18 | Chapel District Elementary | Unit Ventilator Upgrades | Provide upgrades to 18 unit ventilators. | $ 18,800 | $ 18,800 | $ 18,800 | |
2018 | Talbot | 20.002.18 | Easton High | Supervisory Controller Upgrades | Installation of supervisory controller upgrades. | $ 17,200 | $ 11,600 | $ 11,600 | |
2018 | Calvert | 04.004.18 | Calvert Elementary | Intercom Replacement | Replacement of the intercom head unit. | $ 24,762 | $ 24,762 | $ 24,762 | |
2018 | Calvert | 04.024.18 | Mill Creek Middle | Intercom Replacement | Replacement of the intercom head unit. | $ 23,189 | $ 23,189 | $ 23,189 | |
2018 | Anne Arundel | 02.040.18 | Arundel High | Stage Lift | Replacement of the stage lift. | $ 35,000 | $ 22,038 | $ 22,038 | |
2018 | Baltimore City | 30.057.18 | Moravia Park Building #105A | Asphalt & Concrete Replacement | Repave the parking lot area at school, repaint curbing and replace concrete walk section as needed. | $ 88,145 | $ 88,145 | $ 88,145 | |
2018 | Baltimore City | 30.232.18 | Moravia Park Building #105B | Asphalt & Concrete Replacement | Repave the parking lot area at school, repaint curbing and replace concrete walk section as needed. | $ 95,485 | $ 95,485 | $ 95,485 | |
2018 | Baltimore City | 30.069.18 | Mt. Royal Elementary/Middle #066 | Asphalt & Concrete Replacement | Repave the parking lot area at school, repaint curbing and replace concrete walk section as needed. | $ 90,000 | $ 86,062 | $ 86,062 | |
2018 | Baltimore City | 30.277.18 | Harlem Park PK-8 #035 | Asphalt & Concrete Replacement | Repave the parking lot area at school, repaint curbing and replace concrete walk section as needed. | $ 78,000 | $ 78,000 | $ 78,000 | |
2018 | Baltimore City | 30.099.18 | Benjamin Franklin Building #239 | Asphalt & Concrete Replacement | Repave the parking lot area at the school. | $ 90,000 | $ 89,510 | $ 89,510 | |
2018 | Baltimore City | 30.110.18 | Baltimore City College High #480 | UST Replacement | Replacement of the underground oil tank and removal of contaminated soil. | $ 365,000 | $ 365,000 | $ 292,515 | |
2018 | Howard | 13.037.18 | Clarksville Elementary | Exterior Door Replacement | Replacement of eight (8) exterior doors and installation of an ADA compliant ramp. | $ 90,000 | $ 87,776 | $ 87,776 | |
2018 | Baltimore City | 30.041.18 | North Bend PK-8 #081 | Plumbing Replacement | Replacement of the pressure reducing water valve for the entire building. | $ 34,500 | $ 34,415 | $ 34,415 | |
2018 | Baltimore City | 30.110.18 | Baltimore City College High #480 | Storm Drain Replacement | Replacement of the broken section of the storm drain in the rear of the school and the collapsed drain line in the driveway. | $ 70,000 | $ 70,000 | $ 63,219 | |
2018 | Baltimore County | 03.007.18 | Perry Hall Middle | Locker Replacement | Replacement of the existing single tier lockers. | $ 190,000 | $ 159,000 | $ 159,000 | |
2018 | Baltimore County | 03.042.18 | Rodgers Forge Elementary | Boiler Replacement | Replacement of two (2) cast iron boilers with multiple modular boilers. | $ 312,794 | $ 312,794 | $ 312,794 | |
2018 | Somerset | 19.004.18 | Crisfield High | Bleacher Replacement | Replacement of the original 1950's interior bleachers with new motorized ADA code-compliant bleachers. | $ 81,050 | $ 81,050 | $ 81,050 | |
2018 | Caroline | 05.006.18 | Ridgely Elementary | Window Replacement | Replacement of the insulated glass in rear of school. | $ 12,350 | $ 12,350 | $ 12,350 | |
2018 | Cecil | 07.039.18 | Cherry Hill Middle | Plumbing Replacement | Replacement of all bathroom plumbing fixtures. | $ 11,023 | $ 11,023 | $ 10,021 | |
2018 | Cecil | 07.027.18 | Bohemia Manor Middle/High | Plumbing Replacement | Replacement of all bathroom plumbing fixtures. | $ 12,327 | $ 12,327 | $ 11,207 | |
2018 | Cecil | 07.041.18 | Leeds Elementary | Plumbing Replacement | Replacement of all bathroom plumbing fixtures. | $ 11,028 | $ 11,028 | $ 10,026 | |
2018 | Baltimore City | 30.250.18 | Cecil Elementary #007 | Flooring Repair | Repair damaged floor boards in the gym. | $ 14,000 | $ 12,865 | $ 12,865 | |
2018 | Frederick | 10.054.18 | Whittier Elementary | Fire Alarm Replacement | Replacement of the original 1998 fire alarm system which is beyond its useful life due to unavailability of replacement parts. This project will update the fire alarm system to current code standards. No upgrade of the electrical system is required. | $ 90,000 | $ 90,000 | $ 90,000 | |
2018 | Cecil | 07.023.18 | Rising Sun Middle | Stage Curtain Replacement | Replacement of the deteriorating/aged stage curtain. | $ 13,500 | $ 13,500 | $ 12,781 | |
2018 | Somerset | 19.004.18 | Crisfield High | HVAC Replacement | Installation of a new single-zone VAV unit to provide heating and air conditioning to the auxiliary gym. | $ 129,406 | $ 129,406 | $ 129,291 | |
2018 | Cecil | 07.041.18 | Leeds Elementary | Stage Curtain Replacement | Replacement of the deteriorating/aged stage curtain. | $ 11,100 | $ 11,100 | $ 10,082 | |
2018 | St. Mary's | 18.018.18 | Loveville Building (Benjamin Banneker ECC) | Lock Replacement | Replacement of 15 unit locks. | $ 10,450 | $ 10,000 | $ 10,000 | |
2018 | St. Mary's | 18.005.18 | Benjamin Banneker Elementary | Lock Replacement | Replacement of 26 unit locks and 2 cores. | $ 18,400 | $ 14,860 | $ 14,860 | |
2018 | St. Mary's | 18.026.18 | Hollywood Elementary | Lock Replacement | Replacement of 32 mortise locks and 6 cylinders. | $ 11,800 | $ 11,800 | $ 11,800 | |
2018 | St. Mary's | 18.027.18 | Piney Point Elementary | Lock Replacement | Replacement of 29 mortise locks and 2 cores. | $ 10,350 | $ 10,350 | $ 10,350 | |
2018 | St. Mary's | 18.016.18 | White Marsh Elementary | Lock Replacement | Replacement of 16 unit locks, 1 mortise lock, and 1 core. | $ 11,650 | $ 11,650 | $ 11,650 | |
2018 | Anne Arundel | 02.088.18 | Hilltop Elementary | Playground Equipment | Replacement of the playground equipment. | $ 65,000 | $ 27,809 | $ 27,809 | |
2018 | Anne Arundel | 02.088.18 | Hilltop Elementary | Multi-purpose Court | Replacement of the outside multi-purpose court. | $ 70,000 | $ 55,891 | $ 55,891 | |
2018 | Anne Arundel | 02.020.18 | Glen Burnie High | Elevator | Modernize the elevator. | $ 250,000 | $ 250,000 | $ 250,000 | |
2018 | Anne Arundel | 02.068.18 | Southern High | Folding Doors | Replacement of the folding doors in the auditorium. | $ 60,000 | $ 59,000 | $ 59,000 | |
2018 | Anne Arundel | 02.090.18 | Ridgeway Elementary | Folding Doors | Replacement of the folding doors in the cafeteria. | $ 42,500 | $ 42,500 | $ 42,500 | |
2018 | Anne Arundel | 02.100.18 | Piney Orchard Elementary | Folding Doors | Replacement of the folding doors in the cafeteria. | $ 40,000 | $ 33,800 | $ 33,800 | |
2018 | Anne Arundel | 02.107.18 | Oak Hill Elementary | Folding Doors | Replacement of the folding doors in the music room. | $ 15,000 | $ 15,000 | $ 15,000 | |
2018 | Carroll | 06.040.18 | Piney Ridge Elementary | PA System Replacement | Replacement of the original school public address system. | $ 18,070 | $ 18,066 | $ 18,066 | |
2018 | Washington | 21.022.18 | Pleasant Valley Elementary | Emergency Generator | Upgrade the electrical system and installation of an emergency generator. | $ 150,000 | $ 134,904 | $ 134,904 | |
2018 | Baltimore City | 30.110.18 | Baltimore City College High #480 | Asphalt Replacement | Remove and replace asphalt parking and driveway. | $ 105,020 | $ 97,744 | $ 97,744 | |
2018 | Baltimore City | 30.189.18 | Hazelwood K-10 #210 | Plumbing Replacement | Replacement of the pressure reducing valve and sump pumps. | $ 49,000 | $ 12,618 | $ 12,618 | |
2018 | Kent | 14.002.18 | Galena Elementary | Roof Repair | Repair of the roof. | $ 20,000 | $ 18,292 | $ 14,200 | |
2019 | Frederick | 10.056.19 | Wolfsville Elementary | Fire Alarm Replacement | Replacement of the 1959 fire alarm that was extended in the 1999 addition. | $ 100,000 | $ 64,135 | $ 63,709 | |
2019 | St. Mary's | 18.010.19 | Esperanza Middle | PA System Replacement | Replacement of the failing PA System. | $ 80,000 | $ 50,074 | $ 50,074 | |
2019 | Baltimore City | 30.092.19 | Roland Park Elementary/Middle #233 | Asphalt & Concrete Replacement | Replacement of concrete and asphalt in designated parking areas and play lot. | $ 94,000 | $ 94,000 | $ 94,000 | |
2019 | Wicomico | 22.001.19 | Parkside High | Bleacher Replacement | Replacement of the bleachers. | $ 135,000 | $ 53,316 | $ 53,316 | |
2019 | Wicomico | 22.018.19 | Mardela Middle/High | Bleacher Replacement | Replacement of the bleachers. | $ 135,000 | $ 53,311 | $ 53,311 | |
2019 | Baltimore City | 30.110.19 | Baltimore City College High #480 | Ceiling Tile Replacement | Replacement of the current ceiling tile, grid and differs in the cafeteria. | $ 80,000 | $ 80,000 | $ 79,932 | |
2019 | Baltimore City | 30.110.19 | Baltimore City College High #480 | Intercom System | Replacement of the current intercom system and speakers; removal of the obsolete call switches and add classroom telephones. | $ 65,717 | $ 65,717 | $ 65,717 | |
2019 | Anne Arundel | 02.059.19 | Marley Middle | Flooring Replacement | Replace 24,000 sf of carpet. | $ 15,378 | $ 15,000 | $ 15,000 | |
2019 | Anne Arundel | 02.032.19 | Broadneck High | Flooring Replacement | Replacement of the carpet with carpet and tile in the media center and the carpet in the administration area. | $ 70,867 | $ 70,000 | $ 66,789 | |
2019 | Anne Arundel | 02.076.19 | Park Elementary | Flooring Replacement | Replacement of the tile in the hallways. | $ 31,241 | $ 31,000 | $ 31,241 | |
2019 | Baltimore County | 03.041.19 | Dundalk Middle | Domestic Water Heating System | Replacement of the domestic water heating system. | $ 69,200 | $ 69,200 | $ 69,200 | |
2019 | Carroll | 06.012.19 | South Carroll High | Track Repairs | Repair and repaint the track. | $ 25,000 | $ 22,340 | $ 22,275 | |
2019 | Baltimore City | 30.248.19 | Curtis Bay PK-8 #207 | Plumbing Replacement | Replacement of the sanitary line with installation of injector pump. | $ 67,000 | $ 67,000 | $ 50,275 | |
2019 | Montgomery | 15.169.19 | Dr. Charles R. Drew Elementary | Water Heater Replacement | Replacement of the 100 gallon water heater. | $ 21,330 | $ 16,206 | $ 16,206 | |
2019 | Calvert | 04.018.19 | Patuxent Elementary | Intercom System Replacement | Replacement of the 1992 intercom system. | $ 22,026 | $ 16,840 | $ 16,840 | |
2019 | Queen Anne's | 17.023.19 | Kent Island High | Communication System Replacement | The request is to replace the telecommunication system. | $ 51,645 | $ 51,645 | $ 34,496 | |
2019 | Baltimore County | 03.166.19 | Cedarmere Elementary | Electrical Service Replacement | Replacement of the original switchgear and incoming main electrical service. | $ 609,000 | $ 493,435 | $ 422,227 | |
2019 | Montgomery | 15.002.19 | Silver Spring International Middle | Water Heater Replacement | Replacement of the water heater. | $ 23,760 | $ 22,850 | $ 22,850 | |
2019 | Baltimore County | 03.055.19 | Essex Elementary | Fire Alarm System Replacement | Replacement of the fire alarm system. | $ 166,592 | $ 166,592 | $ 166,592 | |
2019 | Baltimore County | 03.136.19 | Campfield Elementary | Exterior Doors Replacement | Replacement of the exterior front doors and frames. | $ 80,000 | $ 75,000 | $ 67,500 | |
2019 | Baltimore County | 03.113.19 | Deep Creek Middle | Bathroom Renovation | Renovation of the young men's toilet room, including ADA compliance. | $ 85,000 | $ 75,000 | $ 67,500 | |
2019 | Baltimore County | 03.178.19 | Fifth District Elementary | Acoustic Improvement | Installation of acoustical applications in the cafeteria, which is located in the basement. | $ 14,000 | $ 10,000 | $ 10,000 | |
2019 | Baltimore City | 30.174.19 | Northern Building #402 | Piping Replacement | Replacement of the water main section with new piping. | $ 42,000 | $ 42,000 | $ 41,830 | |
2019 | Howard | 13.010.19 | Worthington Elementary | Playground Replacement | The request is to replace the aging 2-5 year old playground equipment. | $ 92,000 | $ 87,776 | $ 84,219 | |
2019 | Montgomery | 15.231.19 | Argyle Middle | ADA Upgrades | Replacement of the ADA chair lift. | $ 42,390 | $ 42,390 | $ 42,390 | |
2019 | Montgomery | 15.158.19 | Quince Orchard High | ADA Upgrades | Replacement of the ADA chair lift. | $ 49,335 | $ 49,335 | $ 49,335 | |
2019 | Montgomery | 15.186.19 | Springbrook High | Door Replacement | Replacement of the badly rusted steel exterior doors that are causing security risk to the facility. | $ 46,083 | $ 46,083 | $ 46,083 | |
2019 | Montgomery | 15.215.19 | Westland Middle | Asphalt Replacement | Resurface cracked and broken up asphalt areas. | $ 230,000 | $ 130,727 | $ 130,727 | |
2019 | Montgomery | 15.192.19 | Greenwood Elementary | Ceiling & Lighting Replacement | Replacement of the original stained and rusted acoustical ceiling system and light fixtures. | $ 179,291 | $ 179,291 | $ 179,291 | |
2019 | Allegany | 01.001.19 | George's Creek Elementary | Boiler Replacement | Replacement of the 1975 boiler. | $ 160,000 | $ 97,791 | $ 97,791 | |
2019 | Calvert | 04.010.19 | Huntingtown Elementary | Intercom System Replacement | Replacement of the 1980 intercom system. | $ 21,452 | $ 21,452 | $ 21,452 | |
2019 | Dorchester | 09.009.19 | Cambridge-South Dorchester High | Exhaust Fan Replacement | Replacement of the secondary exhaust fans at the facility (bathrooms, closets, etc.). | $ 38,292 | $ 38,292 | $ 38,292 | |
2019 | Baltimore City | 30.069.19 | Mt. Royal Elementary/Middle #066 | Playground Replacement | Replacement of outdated playground with two new playground sets. | $ 120,790 | $ 120,790 | $ 120,790 | |
2019 | Cecil | 07.023.19 | Rising Sun Middle | Masonry | Rake and repoint brick and mortar joints around the gym and select exterior windows. | $ 16,000 | $ 16,000 | $ 14,600 | |
2019 | Baltimore City | 30.249.19 | Diggs-Johnson Building #162 | Gym Flooring | Refurbishment of the original gym floor . | $ 87,000 | $ 87,000 | $ 64,865 | |
2019 | Montgomery | 15.040.19 | Fallsmead Elementary | Lighting Replacement | Replace the gym light fixtures. | $ 16,496 | $ 16,496 | $ 16,496 | |
2019 | Montgomery | 15.136.19 | Neelsville Middle | Stage Lighting Equipment | Replacement of the stage lighting, dimming and rigging equipment. | $ 130,000 | $ 97,991 | $ 97,991 | |
2019 | Baltimore City | 30.267.19 | Eutaw-Marshburn Elementary #011 | Playground Refurbishment | The request is to remove old playground, partner with KABOOM with installation of new and provide new rubber surface. | $ 42,080 | $ 42,080 | $ 42,080 | |
2019 | Baltimore City | 30.040.19 | William H. Lemmel Building #079 | Storm Drain Replacement | Excavate and replace the sanitary drain behind the school on the parking lot. | $ 66,280 | $ 66,280 | $ 66,280 | |
2019 | Worcester | 23.012.19 | Berlin Intermediate | Replace HVAC Units | Replacement of two existing heat-only units serving the school gymnasium. | $ 44,372 | $ 44,372 | $ 44,372 | |
2019 | Washington | 21.038.19 | E. Russell Hicks Middle | HVAC Replacement | Replacement of three (3) aging air handling units. | $ 350,000 | $ 134,904 | $ 134,904 | |
2019 | Baltimore City | 30.110.19 | Baltimore City College High #480 | Hot Water Heater Replacement | Furnish and install two 120- gallon electric hot water heaters. | $ 48,732 | $ 48,732 | $ 45,427 | |
2019 | Baltimore City | 30.016.19 | Wolfe Street Academy Elementary #023 | Concrete Replacement | Remove and replace concrete entry, sidewalk and playground area with concrete. | $ 80,000 | $ 80,000 | $ 44,535 | |
2019 | Anne Arundel | 02.048.19 | Odenton Elementary | Sidewalk Replacement | Replacement of the sidewalks. | $ 85,000 | $ 85,000 | $ 85,000 | |
2019 | Anne Arundel | 02.108.19 | Sunset Elementary | Sidewalk Replacement | Replacement of the sidewalks. | $ 55,000 | $ 55,000 | $ 54,693 | |
2019 | Prince George's | 16.014.19 | Laurel High | Generator Replacement | Replacement of the generator. | $ 100,000 | $ 100,000 | $ 45,950 | |
2019 | Prince George's | 16.162.19 | Oxon Hill Middle | Generator Replacement | Replacement of the generator. | $ 60,000 | $ 60,000 | $ 60,000 | |
2019 | Prince George's | 16.072.19 | Northwestern High | Generator Replacement | Replacement of the generator. | $ 60,000 | $ 60,000 | $ 50,937 | |
2019 | Prince George's | 16.087.19 | Suitland High | Generator Replacement | Replacement of the generator in the auditorium. | $ 65,000 | $ 65,000 | $ 44,928 | |
2019 | Prince George's | 16.153.19 | Carole Highlands Elementary | Generator Replacement | Replacement of the generator. | $ 80,000 | $ 80,000 | $ 42,306 | |
2019 | Prince George's | 16.152.19 | Benjamin Stoddert Middle | Generator Replacement | Replacement of the generator. | $ 120,000 | $ 120,000 | $ 93,794 | |
2019 | Prince George's | 16.089.19 | Bowie High | Generator Replacement | Replacement of the generator. | $ 110,000 | $ 110,000 | $ 88,296 | |
2019 | Prince George's | 16.174.19 | Charles Herbert Flowers High | Generator Replacement | Replacement of the generator. | $ 120,000 | $ 120,000 | $ 96,862 | |
2019 | Prince George's | 16.166.19 | Carmody Hills Elementary | Generator Replacement | Replacement of the generator. | $ 135,000 | $ 135,000 | $ 81,198 | |
2019 | Prince George's | 16.143.19 | Stephen Decatur Middle | Generator Replacement | Replacement of the generator. | $ 85,000 | $ 85,000 | $ 49,365 | |
2019 | Prince George's | 16.085.19 | High Point High | Generator Replacement | Replacement of the generator. | $ 65,000 | $ 65,000 | $ 44,928 | |
2019 | Anne Arundel | 02.048.19 | Odenton Elementary | Parking Lot Repavement | Mill and over lay parking lots and driveways, replacement of curb and gutter, as needed and fix ADA access. | $ 150,000 | $ 143,710 | $ 143,710 | |
2019 | Anne Arundel | 02.097.19 | Riviera Beach Elementary | Parking Lot Repavement | Mill and over lay parking lots and driveways; replacement of curb and gutter as needed; repair of storm water inlets; fix ADA access. | $ 83,500 | $ 83,000 | $ 83,000 | |
2019 | Somerset | 19.004.19 | Crisfield Academy & High School | HVAC Improvements | Replacement of the existing cooling tower, chiller, and one major roof-top unit. | $ 48,079 | $ 45,420 | $ 45,420 | |
2019 | Baltimore City | 30.189.19 | Hazelwood K-8 #210 | Asphalt & Concrete Replacement | Refurbish the asphalt and replace concrete sidewalk and curbs. | $ 140,000 | $ 140,000 | $ 127,125 | |
2019 | Baltimore City | 30.148.19 | Fallstaff PK-8 #241 | Ceiling Tile Replacement | Replacement of all ceiling tiles in office area, all hallways, open areas, bathrooms, stairs, and entire school. | $ 128,000 | $ 128,000 | $ 122,444 | |
2019 | Frederick | 10.057.19 | Governor Thomas Johnson High | Auditorium Seating Replacement | Replacement of five rows of auditorium seating (191 seats). | $ 36,802 | $ 36,248 | $ 36,248 | |
2019 | Harford | 12.050.19 | Southampton Middle | Main Switchgear Replacement | Replacement of the existing 3,000 amp main switchgear. | $ 57,656 | $ 57,656 | $ 57,656 | |
2019 | Anne Arundel | 02.116.19 | Cape St. Claire Elementary | Flooring Replacement | Replacement of carpet in the main offices, music room and media center. | $ 35,452 | $ 35,000 | $ 35,451 | |
2019 | Baltimore City | 30.159.19 | Maree Garnett Farring PK-8 #203 | Playground Refurbishment | Replacement of the playground surface with rubberized surface, after KABoom partner and school installs new playground equipment. | $ 39,000 | $ 39,000 | $ 39,000 | |
2019 | Baltimore City | 30.202.19 | City Springs PK-8 #008 | Intercom System Replacement | Replace the intercom system and speakers, removal of the obsolete call switches, and addition of classroom telephones. | $ 49,577 | $ 49,577 | $ 49,577 | |
2019 | Cecil | 07.018.19 | Perryville Middle | Stage Curtain replacement | Replacement of the stage curtain and all associated hardware. | $ 13,600 | $ 13,600 | $ 12,426 | |
2019 | Harford | 12.035.19 | Bel Air Middle | Building Automation Controls | Upgrades to the building automation control system to direct digital controls to improve performance. | $ 160,936 | $ 160,936 | $ 151,300 | |
2019 | Baltimore City | 30.204.19 | Dr. Bernard E. Harris, Sr. Elementary #250 | Intercom System | Replacement of the intercom system and speakers, removal of the obsolete call switches, and addition of classroom phones. | $ 24,529 | $ 24,529 | $ 24,529 | |
2019 | Baltimore City | 30.096.19 | Hamilton PK-8 #236 | Intercom Replacement | Replacement of the intercom system and speakers, and removal of the obsolete call switches and add classroom phones | $ 24,998 | $ 24,998 | $ 24,998 | |
2019 | Baltimore City | 30.083.19 | William Paca Elementary #083 | Intercom Replacement | Replacement of the intercom system. | $ 16,084 | $ 16,084 | $ 14,973 | |
2019 | Baltimore City | 30.179.19 | Lakeland PK-8 #012 | Intercom Replacement | Replacement of the intercom system, speakers, and remove obsolete call switches and add classroom phones | $ 24,951 | $ 24,951 | $ 24,951 | |
2019 | Cecil | 07.030.19 | Cecil Manor Elementary | ADA lift replacement | Replacement of the existing deteriorating ADA lift. | $ 21,000 | $ 21,000 | $ 18,300 | |
2019 | Cecil | 07.034.19 | Bainbridge Elementary | ADA Lift Replacement | Replacement of the existing deteriorating ADA lift. | $ 21,000 | $ 21,000 | $ 19,800 | |
2019 | Cecil | 07.026.19 | Rising Sun Elementary | PA system replacement | Replacement of the existing non-functioning PA announcement system. | $ 21,000 | $ 21,000 | $ 21,000 | |
2019 | Baltimore City | 30.166.19 | Canton Building #230 | Underground Oil Storage Tank | Abandonment in place of one (1) 10,000 gallon underground storage tank used to store #2 heating oil in accordance with State and Federal requirements of the Maryland Department of Environment (MDE). | $ 64,950 | $ 64,950 | $ 64,950 | |
2019 | Baltimore City | 30.267.19 | Eutaw-Marshburn Elementary #011 | Gym Flooring | Replacement of the gym floor. | $ 65,393 | $ 65,393 | $ 65,393 | |
2019 | Baltimore City | 30.228.19 | Southside Building #181 | Plumbing Replacement | Replacement of approximately 60" of cold and hot water piping. | $ 34,100 | $ 34,100 | $ 33,972 | |
2019 | Baltimore City | 30.242.19 | Matthew A. Henson Elementary #029 | CCTV System | Installation of a CCTV system. | $ 36,064 | $ 36,064 | $ 36,052 | |
2019 | Baltimore City | 30.224.19 | Abbottston Building #050 | CCTV System | Installation of a CCTV system. | $ 37,016 | $ 37,016 | $ 35,278 | |
2019 | Baltimore City | 30.268.19 | The Mount Washington School #221 | CCTV System | Installation of a CCTV system. | $ 37,654 | $ 37,654 | $ 37,654 | |
2019 | Caroline | 05.005.19 | Lockerman Middle | Parking Lot Expansion Project | Expansion of the existing parking lot by 17 spaces which will meet the current and projected future staffing needs. | $ 70,000 | $ 50,149 | $ 50,149 | |
2019 | Carroll | 06.042.19 | Westminster High | PA System Replacement | Replacement of the original PA System. | $ 25,000 | $ 19,618 | $ 30,475 | |
2019 | Carroll | 06.030.19 | Mt. Airy Elementary | PA System Replacement | Replacement of the original PA System. | $ 20,000 | $ 18,860 | $ 18,860 | |
2019 | Carroll | 06.012.19 | South Carroll High | Gym Floor Refinishing | Refinish the main gymnasium floor. | $ 32,500 | $ 32,500 | $ 34,000 | |
2019 | Carroll | 06.012.19 | South Carroll High | Tennis Court Resurfacing | Resurface 6 tennis courts. | $ 29,473 | $ 29,473 | $ 31,090 | |
2019 | Frederick | 10.050.19 | Glade Elementary | Fire Alarm Replacement | Replacement of the fire alarm system. | $ 106,500 | $ 89,584 | $ 89,584 | |
2019 | Carroll | 06.044.19 | Elmer Wolfe Elementary | Gym Floor Refinish | Refinish the gym floor. | $ 15,000 | $ 14,470 | $ 561 | |
2020 | Montgomery | 15.013.20 | Germantown Elementary | Floor Replacement | Replacement of VCT gym floor with RobinWood Sport Wood Flooring System. | $ 72,572 | $ 72,572 | $ 72,572 | |
2020 | Baltimore City | 30.178.20 | Baltimore School for the Arts #415 | Domestic Water Pumps Replacement | Replace Domestic water booster pumps. | $ 42,040 | $ 42,040 | $ 33,691 | |
2020 | Carroll | 06.042.20 | Westminster High | Flooring | Refinish the gym floor. | $ 29,400 | $ 24,124 | $ 24,124 | |
2020 | Talbot | 20.008.20 | St. Michael M/H | Outdoor Stadium Bleacher | Bleacher Replacement. | $ 39,700 | $ 39,700 | $ 39,700 | |
2020 | Frederick | 10.040.20 | Monocacy Elementary | Fire Alarm Replacement | Replacement of the schools fire alarm system. | $ 106,500 | $ 89,534 | $ 89,534 | |
2020 | Baltimore City | 30.067.20 | Lockerman-Bundy Elementary #261 | Storage Tank | Add Above Ground Storage Tank for Boiler Operation. | $ 71,000 | $ 71,000 | $ 70,600 | |
2020 | Wicomico | 22.015.20 | Wicomico Middle | Gym Floor Refinishing | Sand and refinish the Main Gym Floor and the Auxiliary Gym Floor. | $ 28,711 | $ 28,711 | $ 28,711 | |
2020 | Charles | 08.015.20 | Piccowaxen Middle | Power Conditioning Panel | Add a Power Conditioning Panel to balance the electrical usage and be compatible with the Local Utility Agency (SMECO). | $ 50,000 | $ 50,000 | $ 50,000 | |
2020 | Carroll | 06.052.20 | Winters Mill High | Outdoor Track Surface | Replace surface. | $ 34,040 | $ 34,040 | $ 34,040 | |
2020 | Queen Anne's | 17.023.20 | Kent Island High | PA Replacement | Replace the twenty-one year old PA system | $ 50,000 | $ 50,000 | $ 50,000 | |
2020 | Harford | 12.020.20 | C. Milton Wright High | Parking Lot Pole | Parking lot light replacement. | $ 18,950 | $ 18,950 | $ 18,950 | |
2020 | Harford | 12.014.20 | Edgewood Middle | Stage Partition Replacement | Replace the manual stage folding partition. | $ 22,000 | $ 22,000 | $ 22,000 | |
2020 | Dorchester | 09.001.20 | Sandy Hill Elementary | Access Control System | Installation of network integrated access control on all primary perimeter entry/exit points used by students, teachers and staff and the public. | $ 38,982 | $ 38,982 | $ 38,292 | |
2020 | Caroline | 05.009.20 | Career and Technology Center | Parking Lot Coating | Coating of the parking lot & fixing cracks. | $ 12,400 | $ 12,400 | $ 12,375 | |
2020 | Harford | 12.001.20 | Fallston High | Wall Repair | Repair the exterior masonry wall. | $ 176,888 | $ 176,888 | $ 176,888 | |
2020 | Carroll | 06.045.20 | Linton Springs Elementary | PA System | Replace existing PA system. | $ 16,882 | $ 16,882 | $ 16,882 | |
2020 | Carroll | 06.015.20 | Freedom Elementary | PA System | Replace existing PA system. | $ 15,882 | $ 15,882 | $ 15,882 | |
2020 | Carroll | 06.022.20 | Hampstead Elementary | PA System | Replace existing PA system. | $ 15,882 | $ 15,882 | $ 15,882 | |
2020 | Anne Arundel | 02.042.20 | Southern Middle | Elevator Replacement | The request is to replace the Elevator (AA1524 or Elevator "A") | $ 290,000 | $ 289,702 | $ 289,664 | |
2020 | Baltimore County | 03.163.20 | Sussex Elementary | Boiler Replacement | Replace Boiler. | $ 535,000 | $ 379,876 | $ 379,876 | |
2020 | Baltimore City | 30.168.20 | Booker T. Washington Building #130 | Sidewalk Replacement | Replace Sidewalk. | $ 82,916 | $ 82,916 | $ 82,916 | |
2020 | Baltimore County | 03.015.20 | Rosedale Center | Boiler Replacement | Replace Boiler. | $ 760,000 | $ 500,000 | $ 500,000 | |
2020 | Cecil | 07.022.20 | Rising Sun High | Boiler Valve Replacement | The request is to replace boiler valve. | $ 12,300 | $ 12,300 | $ 11,927 | |
2020 | Baltimore City | 30.257.20 | Callaway Elementary #251 | Sidewalk Replacement and Concrete Fixtures | Replace Sidewalk, concrete apron, dumpster pad, curb, gutter and knee wall in parking lot. | $ 136,681 | $ 136,681 | $ 136,681 | |
2020 | Baltimore City | 30.226.20 | Mergenthaler Vocational-Technical High #410 | Sidewalk Replacement & Parking Lot Repavement | Replace concrete sidewalks and repave parking lots. | $ 211,243 | $ 211,243 | $ 211,200 | |
2020 | Carroll | 06.054.20 | Shiloh Middle | PA System | Replace existing PA system. | $ 19,000 | $ 19,000 | $ 19,000 | |
2020 | St. Mary's | 18.022.20 | Green Holly Elementary | Life Safety Communications System | Installation of a system-wide standard Life Safety Communications System | $ 110,000 | $ 50,074 | $ 50,074 | |
2020 | Baltimore City | 30.188.20 | Walbrook Building #411 | Sidewalk Replacement | Replace sidewalk. | $ 140,550 | $ 140,550 | $ 140,550 | |
2020 | Wicomico | 22.002.20 | Pinehurst Elementary | VCT Flooring | Strip and remove all VCT and carpeting. Then replace with new VCT flooring. | $ 26,956 | $ 26,956 | $ 26,956 | |
2020 | Wicomico | 22.001.20 | Parkside High | VCT Flooring | Remove the carpet, fritz tile, and VCT flooring. Then replace with new VCT flooring. | $ 22,684 | $ 22,684 | $ 22,684 | |
2020 | Wicomico | 22.009.20 | Wicomico High | VCT Flooring Installation | Replace VCT carpeting with VCT flooring. | $ 14,207 | $ 13,810 | $ 13,810 | |
2020 | Caroline | 05.009.20 | Career and Technology Center | Hallway Extension | Currently some students have to go outside in order to access two classrooms. This hallway extension will connect two existing hallways thus increasing student safety and security of the building. | $ 46,000 | $ 37,714 | $ 37,714 | |
2020 | Kent | 14.003.20 | Kent County Middle | Repave parking lot area | Parking Lot Repaving | $ 91,503 | $ 91,503 | $ 91,503 | |
2020 | Baltimore City | 30.129.20 | George G. Kelson Building #157 | Install CCTV & New Surveillance System | Install a new cctv and video surveillance system. | $ 39,215 | $ 39,215 | $ 39,215 | |
2020 | Baltimore County | 03.032.20 | Randallstown High | Generator Replacement | Replace Generator | $ 300,000 | $ 210,500 | $ 210,500 | |
2020 | Carroll | 06.029.20 | Sykesville Middle | Flooring | Refinish the gym floor. | $ 15,421 | $ 15,421 | $ 15,421 | |
2020 | Baltimore County | 03.165.20 | Overlea High | Flooring Replacement | Replace gym floor. | $ 370,000 | $ 159,624 | $ 159,624 | |
2020 | Montgomery | 15.101.20 | Highland View Elementary | Trash Compactor Replacement | Replace the 25 year old trash compactor. | $ 11,267 | $ 11,267 | $ 11,267 | |
2020 | Montgomery | 15.045.20 | Magruder High | Trash Compactor Replacement | Replacement of the 10T trash compactor that was originally installed in 1989. | $ 14,576 | $ 14,576 | $ 14,576 | |
2020 | Montgomery | 15.066.20 | Poolesville High | Trash Compactor Replacement | Replace the malfunctioning 10T Trash compactor. | $ 14,576 | $ 14,576 | $ 14,576 | |
2020 | Montgomery | 15.135.20 | Sherwood High | Trash Compactor Replacement | Replace the 10T trash compactor. | $ 14,576 | $ 14,576 | $ 14,576 | |
2020 | Montgomery | 15.157.20 | Stone Mills Elementary | Trash Compactor Replacement | Replace the 1988 450SS Trash compactor. | $ 11,267 | $ 11,267 | $ 11,184 | |
2020 | Montgomery | 15.173.20 | Rockwell Elementary | Asphalt Resurfacing | Resurface the 27 year old original asphalt surface and line painting, project areas includes driveways, bus loop, parking and play areas. | $ 78,000 | $ 78,000 | $ 83,742 | |
2020 | Montgomery | 15.214.20 | Cedar Grove Elementary | Asphalt Resurfacing | Repair and resurface asphalt surface and line painting/marking. (Driveways and parking areas) | $ 65,000 | $ 65,000 | $ 64,365 | |
2020 | Montgomery | 15.249.20 | Piney Branch Elementary | Bleacher Replacement | Replace the manually operated wooden bleachers. | $ 44,900 | $ 44,900 | $ 44,900 | |
2020 | Montgomery | 15.158.20 | Quince Orchard High | Wall Replacement | Replace gym divider wall. | $ 95,500 | $ 95,500 | $ 95,500 | |
2020 | Montgomery | 15.275.20 | Shady Grove Middle | Water Heater Replacement | Replace the 24 year old domestic water heater system with two-100 gallons new water heaters. | $ 85,000 | $ 85,000 | $ 73,110 | |
2020 | Montgomery | 15.166.20 | Watkins Mill High | Gym Divider Wall Replacement | Replace the 30 year old gym divider. | $ 95,500 | $ 95,500 | $ 95,500 | |
2020 | Montgomery | 15.013.20 | Germantown Elementary | Gym Floor Replacement | Replacement of VCT gym floor with RobinWood Sport Wood Flooring System. | $ 72,572 | $ 72,572 | $ 72,572 | |
2020 | Calvert | 04.017.20 | Plum Point Middle | Partial Intercom Replacement | Replace the intercom head end equipment, administration desk units, and rewire head end into existing system. | $ 24,988 | $ 24,988 | $ 24,988 | |
2020 | Calvert | 04.007.20 | Mt. Harmony Elementary | Partial Intercom Replacement | Replace the intercom head end equipment, administration desk units, and rewire the equipment into the existing system. | $ 20,934 | $ 13,994 | $ 13,994 | |
2020 | Frederick | 10.064.20 | Thurmont Primary | Envelope Repair/Water Infiltration | To address water infiltration thru the falling masonry assemblies. The work will include demolition of the exterior skin and cavity interstitial materials and replacement with new materials. | $ 99,847 | $ 99,847 | $ 99,847 | |
2020 | Somerset | 19.004.20 | Crisfield High | Intercom Replacement/New VOIP System | Replace the existing phone system at Crisfield High school with a new VOIP system to include phones in every classroom. Also, reconfigure/replace the existing intercom system and integrate a new PA system and master clock with the new VOIP phone system. | $ 18,017 | $ 18,017 | $ 18,017 | |
2020 | Somerset | 19.014.20 | Greenwood Elementary | Intercom Replacememt/New VOIP System | Replace the existing phone system school with a new VOIP system to include phones in every classroom. Also, reconfigure/replace the existing intercom system and integrate a new PA system and master clock with the new VOIP phone system. | $ 17,415 | $ 17,415 | $ 17,415 | |
2020 | Cecil | 07.020.20 | Perryville Elementary | Playground Restoration | Restore existing deteriorated playground not associated with recent interior renovations | $ 16,000 | $ 16,000 | $ 14,399 | |
2020 | Cecil | 07.031.20 | Cecilton Elementary | Flooring Replacement | Replace deteriorated VCT flooring in 5 existing classrooms. | $ 11,000 | $ 11,000 | $ 10,670 | |
2020 | Cecil | 07.011.20 | Thomson Estates Elementary | Flooring Replacement | Replace existing deteriorating VCT flooring in 5 classrooms | $ 11,500 | $ 11,500 | $ 11,020 | |
2020 | Cecil | 07.037.20 | Holly Hall Elementary | Flooring Replacement | Replace existing deteriorating VCT flooring in 5 classrooms. | $ 12,500 | $ 12,500 | $ 12,271 | |
2020 | Cecil | 07.034.20 | Bainbridge Elementary | Sidewalk Replacement | Replace and repair deteriorating exterior sidewalks in various locations. | $ 13,000 | $ 13,000 | $ 12,744 | |
2020 | Baltimore City | 30.041.20 | North Bend PK-8 #081 | Playground | Removal and site preparation for installation of new playground to include rubber surface. | $ 43,200 | $ 43,200 | $ 43,200 | |
2020 | Baltimore City | 30.276.20 | Bragg Nature Study Center | CCTV Cameras | Provide DVR and CCTV cameras to monitor teaching areas, farm and property. | $ 17,500 | $ 17,500 | $ 15,869 | |
2020 | Wicomico | 22.007.20 | Delmar Elementary | Bathrooms Epoxy Floor Finish | Installation of a new epoxy floor finish. | $ 25,500 | $ 25,500 | $ 25,500 | |
2020 | Baltimore City | 30.260.20 | Barclay PK-8 #054 | Flooring Replacement | Remove and install existing gym floor. | $ 78,074 | $ 78,074 | $ 78,074 | |
2020 | Anne Arundel | 02.049.20 | Shipley's Choice Elementary | Door Replacement | Replace folding doors located between the Gym and Cafeteria. | $ 52,000 | $ 52,000 | $ 52,000 | |
2020 | Baltimore City | 30.195.20 | Beechfield PK-8 #246 | Flooring Replacement | Replace the gym floor. | $ 63,577 | $ 63,577 | $ 63,577 | |
2020 | Baltimore City | 30.159.20 | Maree G. Farring PK-8 #203 | Concrete Replacement | Remove /replace existing sidewalk in identified areas | $ 26,700 | $ 26,700 | $ 26,680 | |
2020 | Baltimore City | 30.127.20 | Rosemont PK-8 #063 | Asphalt & Concrete Replacement | Replace asphalt & concrete. | $ 77,000 | $ 77,000 | $ 77,000 | |
2020 | Cecil | 07.024.20 | Elk Neck Elementary | Air Conditioning Replacement | Air Conditioner Replacement | $ 14,600 | $ 14,600 | $ 13,310 | |
2020 | Cecil | 07.034.20 | Bainbridge Elementary | Boiler Controls Replacment | Upgrade/Replace both boilers. | $ 15,250 | $ 15,250 | $ 14,850 | |
2020 | Cecil | 07.041.20 | Leeds Elementary | Boiler Supply Line Upgrade | The request is to upgrade the boiler supply line. | $ 14,850 | $ 13,509 | $ 13,509 | |
2020 | Anne Arundel | 02.068.20 | Southern High | Door Replacement | Replace exterior doors and frames. | $ 262,600 | $ 164,336 | $ 164,336 | |
2020 | Baltimore City | 30.195.20 | Beechfield PK-8 #246 | Basketball Court Asphalt Repair | Repair the playgrounds and basketball court asphalt. | $ 34,935 | $ 34,935 | $ 34,935 | |
2020 | Baltimore County | 03.112.20 | Joppa View Elementary | Intercom System Replacement | Replace intercom system. | $ 140,000 | $ 125,000 | $ 125,000 | |
2020 | Baltimore County | 03.123.20 | Cromwell Valley Elementary | Intercom System Replacement | Replace intercom system. | $ 140,041 | $ 108,041 | $ 108,041 | |
2020 | Baltimore County | 03.004.20 | Fullerton Elementary | Intercom System Replacement | Replace intercom system. | $ 140,000 | $ 100,000 | $ 100,000 | |
2020 | Baltimore City | 30.110.20 | Baltimore City College High #480 | Plumbing | Replace existing domestic water booster pumps. | $ 49,450 | $ 49,450 | $ 49,450 | |
2020 | Washington | 21.031.20 | Williamsport High | Domestic Water Line Replacement | Domestic Water Line Replacement | $ 150,000 | $ 134,904 | $ 134,904 | |
2020 | Howard | 13.079.20 | Bryant Woods Elementary | Playground Equipment | Playground Replacement. | $ 92,000 | $ 87,776 | $ 87,776 | |
2020 | Baltimore City | 30.096.20 | Hamilton PK-8 #236 | Flooring Replacement | Replace VCT Flooring | $ 44,000 | $ 44,000 | $ 40,187 | |
2020 | Baltimore City | 30.204.20 | Dr. Bernard E. Harris, Sr. Elementary #250 | Storm Drain Replacement | Remove and replace new sections of collapsed storm water line. | $ 72,750 | $ 72,750 | $ 44,214 | |
2020 | Kent | 14.007.20 | Kent County High | Intercom Replacement | Intercom System Replacement | $ 5,285 | $ 5,285 | $ 5,285 | |
2020 | Prince George's | 16.208.20 | G. James Gholson Middle | Generator Replacement | Existing Generator Replacement | $ 128,000 | $ 128,000 | $ 128,000 | |
2020 | Prince George's | 16.133.20 | Kingsford Elementary | Generator Replacement | Existing Generator Replacement | $ 100,000 | $ 100,000 | $ 100,000 | |
2020 | Prince George's | 16.234.20 | Lake Arbor Elementary School | Generator Replacement | Existing Generator Replacement | $ 100,000 | $ 100,000 | $ 100,000 | |
2020 | Prince George's | 16.241.20 | Lamont Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.112.20 | Robert Frost Elementary School | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.135.20 | Magnolia Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.205.20 | Allenwood Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.123.20 | Barnaby Manor Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.189.20 | Beacon Heights Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.142.20 | Carollton Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Prince George's | 16.117.20 | Dodge Park Elementary | Generator Replacement | New Generator Installation | $ 134,000 | $ 134,000 | $ 134,000 | |
2020 | Baltimore City | 30.096.20 | Hamilton PK-8 #236 | Playground Equipment | Removal and disposal of existing playground equipment and installation of new playground equipment and a rubber surface system. | $ 36,810 | $ 36,810 | $ 36,810 | |
2020 | Baltimore City | 30.042.20 | William Paca E #83 | Playground Equipment | Removal and disposal of existing playground equipment and relocate and install new playground equipment and a rubber surface system to another area on the school site. | $ 46,910 | $ 46,910 | $ 43,325 | |
2021 | Montgomery | 15.234.21 | Cloverly Elementary | Door Replacement | Replace interior corridor and exterior doors. | $ 143,709 | $ 143,709 | $ 143,709 | |
2021 | Montgomery | 15.234.21 | Cloverly Elementary | Ceiling Tile Replacement | The 1st phase is to replace the suspended ceiling tiles, grid system and lights. | $ 235,000 | $ 235,000 | $ 235,000 | |
2021 | Montgomery | 15.165.21 | Resnik Elementary | Flooring | Replace gym floor (synthetic to wood). | $ 114,152 | $ 114,152 | $ 114,152 | |
2021 | Somerset | 19.007.21 | Deal Island Elementary | Partition Replacement | Remove and replace existing accordion stage partition. | $ 17,500 | $ 17,500 | $ 17,500 | |
2021 | Anne Arundel | 02.009.21 | Chesapeake Bay Middle | Countertops and Casework | Replace countertops and casework. | $ 197,488 | $ 197,488 | $ 197,488 | |
2021 | Anne Arundel | 02.056.21 | Belvedere Elementary | Cafeteria & Gym Doors | Replace in kind folding doors in the cafeteria and gym. | $ 42,000 | $ 42,000 | $ 38,000 | |
2021 | Anne Arundel | 02.113.21 | Shady Side Elementary | Cafeteria Doors | Replace in kind folding doors in cafeteria. | $ 45,000 | $ 45,000 | $ 45,000 | |
2021 | Howard | 13.023.21 | Swansfield Elementary | Playground Equipment | Replace the existing K-area playground installed in 2001. | $ 94,500 | $ 91,333 | $ 91,333 | |
2021 | Cecil | 07.031.21 | Cecilton Elementary | Playground Equipment | Replace and repair deteriorating playground equipment. | $ 11,000 | $ 11,000 | $ 10,360 | |
2021 | Cecil | 07.011.21 | Thomson Estates Elementary | Audio System | Upgrade the outdated public announcement system. | $ 13,000 | $ 13,000 | $ 12,937 | |
2021 | Baltimore City | 30.135.21 | Liberty Elementary #064 | Playground Equipment | Remove and replace two playgrounds installed in 1995, in partnership with the Goldseker Foundation. | $ 49,500 | $ 49,500 | $ 48,944 | |
2021 | Frederick | 10.012.21 | Walkersville High | Auditorium Seating | Replace the entire 1976 auditorium seating with 1,197 new seats that will meet current code and ADA requirements. | $ 181,268 | $ 181,268 | $ 181,268 | |
2021 | Prince George's | 16.085.21 | High Point High | PA System | Replace the public address system. | $ 85,000 | $ 85,000 | $ 85,000 | |
2021 | Wicomico | 22.002.21 | Pinehurst Elementary | VCT Flooring | Install new VCT flooring. | $ 13,419 | $ 13,419 | $ 13,419 | |
2021 | Wicomico | 22.022.21 | Pinehurst Elementary | Gym Floor | Repair the gym floor. | $ 42,330 | $ 36,964 | $ 36,964 | |
2021 | Allegany | 01.022.21 | Cash Valley Elementary | Air Handler Unit | Replace the multizone, packaged air handler unit with a variable refrigerant volume system. | $ 350,000 | $ 195,582 | $ 195,582 | |
2021 | Baltimore City | 30.149.21 | Morrell Park Pk-8 #220 | Asphalt and Concrete | Remove and replace asphalt parking lots, play areas and concrete sidewalk areas. | $ 140,000 | $ 140,000 | $ 105,705 | |
2021 | Harford | 12.013.21 | William S. James Elementary | Motor Control Center | Replace the motor control center equipment. | $ 60,000 | $ 60,000 | $ 26,746 | |
2021 | Harford | 12.028.21 | Havre de Grace Elementary | Gym & Stage Floors | Refinish the gym and stage floors. | $ 20,000 | $ 20,000 | $ 13,972 | |
2021 | Worcester | 23.013.21 | Cedar Chapel Special School | HVAC Wall Units Replacement | Remove ten classroom HVAC wall units and install new McQuay Type K Incremental Room Conditioners. | $ 37,590 | $ 37,590 | $ 37,590 | |
2021 | Wicomico | 22.012.21 | Northwestern Elementary | VCT Flooring | Install New VCT flooring in café/gym | $ 18,971 | $ 18,971 | $ 18,971 | 0 |
2021 | Caroline | 05.002.21 | North Caroline High | WWTP Lift Station | Rebuild one of the lift stations on the waste water treatment facility site. | $ 50,650 | $ 50,074 | $ 50,074 | 0 |
2021 | Baltimore County | 03.108.21 | Gunpowder Elementary | Modular Building Repair | Replace the 8,400 square ft. roof installed in 1995, including exterior walls, exterior doors and frames, VCT flooring, ceilings, lights, and interior paint. | $ 322,000 | $ 307,000 | $ 300,000 | |
2021 | Baltimore County | 03.188.21 | Carney Elementary | Modular Building Repair | Replace exterior walls, exterior doors and frames, VCT flooring, ceilings and lights, including interior paint. | $ 277,227 | $ 262,227 | $ 260,000 | |
2021 | Carroll | 06.024.21 | Francis Scott Key High | Gym Floor | Refinish the gym floor and repaint the existing lines. | $ 21,187 | $ 21,187 | $ 21,187 | |
2021 | Carroll | 06.043.21 | Oklahoma Road Middle | Gym Floor | Refinish the gym floor and repaint the existing lines. | $ 15,627 | $ 15,627 | $ 15,627 | |
2021 | Carroll | 06.007.21 | Mechanicsville Elementary | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | $ 15,992 | |
2021 | Carroll | 06.043.21 | Oklahoma Road Middle | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | $ 18,195 | |
2021 | Carroll | 06.023.21 | Winfield Elementary | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | $ 20,000 | |
2021 | Carroll | 06.038.21 | Friendship Valley Elementary | PA System | Replace existing Head End PA System and administrative console in office. | $ 20,000 | $ 20,000 | $ 18,144 | |
2021 | Talbot | 20.002.21 | Easton High | Trane Chiller | Upgrade control panel to monitor and maintain the aging Trane chiller. | $ 31,115 | $ 31,115 | $ 31,115 | |
2021 | Harford | 12.026.21 | North Harford Elementary | Parking Lot Repairs | Replace 22 LF of curb and 160 SF of sidewalk and install pavement markings. | $ 92,708 | $ 92,708 | $ 86,588 | |
2021 | Harford | 12.031.21 | North Bend Elementary | Gym Floor | Replace the existing gym floor with vinyl sheet goods. | $ 47,000 | $ 47,000 | $ 92,120 | |
2021 | Baltimore City | 30.262.21 | Edgewood Elementary | Floors | Installation of 500sqft gym flooring | $ 93,000 | $ 93,000 | $ 86,400 | |
2021 | Baltimore City | 30.096.21 | Hamilton Elementary/Middle | Water Pump | install a new 1000 GPM at 50 psi | $ 49,000 | $ 49,000 | $ 49,000 | |
2021 | Baltimore City | 30.20.21 | Dallas F. Nicholas ES | Security Fence | Replace security fencing | $ 16,000 | $ 16,000 | $ 16,000 | |
2021 | Baltimore City | 30.045.21 | Windsor Hill Elementary/Middle | Gym Floor Refurbishment | Sand existing gym floors and apply sealer | $ 22,000 | $ 22,000 | $ 14,490 | |
2021 | Baltimore City | 30.193.21 | Sinclair ES | Gym Floor | Installation of new gym floor with 25/32 x 21/4" MFMA or hardwood | $ 69,000 | $ 69,000 | $ 64,688 | |
2021 | Queen Anne's | 17.009.21 | Grasonville Elementary School | PA System | Replacement of the PA system. | $ 59,000 | $ 59,000 | $ 59,000 | |
2021 | Cecil | 07.013.21 | Perryville High | Sidewalks | Replace and repair deteriorating sidewalks. | $ 11,000 | $ 11,000 | $ 10,001 | |
2021 | St. Mary's | 18.020.21 | Great Mills High | Band Room Storage | Renovation of the existing band room storage area. | $ 50,074 | $ 50,074 | $ 49,876 | |
2021 | Garrett | 11.015.21 | Yough Glades Elementary | Playground | Replace existing playground. | $ 50,000 | $ 44,900 | $ 17,949 | |
2021 | Garrett | 11.004.21 | Grantsville Elementary | Playground | Upgrade sections of the existing playground. | $ 100,000 | $ 100,000 | $ 127,041 | |
2021 | Cecil | 07.013.21 | Perryville High | Stage Floor | Repair deteriorating stage floor and stairs. | $ 23,000 | $ 23,000 | $ 11,330 | |
2021 | Baltimore City | 30.030.21 | Hampden PK-8 #55 | Underground Oil Tank | Remove and install new double wall steel jacketed underground tank and double wall piping system. | $ 255,000 | $ 255,000 | $ 255,000 | |
2021 | Somerset | 19.004.21 | Crisfield High | Walk-In Refrigerator Replacement | Remove and replace the existing 1973 Walk-in cooler and freezer. | $ 40,000 | $ 15,000 | $ 15,000 | |
2021 | Baltimore City | 30.196.21 | Woodhome EM #205 | Intercom System | Replace absolute intercom, phone and paging system. | $ 24,863 | $ 24,863 | $ 24,863 | |
2021 | Baltimore City | 30.061.21 | Furman Templeton Elementary #125 | Playground Equipment | Remove and replace existing playground equipment. | $ 46,000 | $ 46,000 | $ 45,830 | |
2021 | Baltimore City | 30.056.21 | George G. Kelson #157 | Playground Equipment | Remove and replace existing playground equipment. | $ 48,000 | $ 48,000 | $ 47,046 | |
2021 | Baltimore City | 30.115.21 | Francis M. Wood #178 | Water Pump Replacement | Remove fire line pump. | $ 14,200 | $ 14,200 | $ 11,286 | |
2021 | Baltimore City | 30.092.21 | Roland Park Elementary/Middle # 233 | Water Pump Controller | Replace and install pump controller. | $ 22,400 | $ 22,400 | $ 17,582 | |
2021 | Prince George's | 16.207.21 | Perrywood Elementary | PA System | Replace the public address system for the entire school. | $ 60,000 | $ 60,000 | $ 45,499 | |
2021 | Prince George's | 16.230.21 | Panorama Elementary | PA System | Replace the public address system for the entire school. | $ 64,000 | $ 64,000 | $ 46,142 | |
2021 | Prince George's | 16.175.21 | Hillcrest Heights Elementary | PA System | Replace the public address system for the entire school. | $ 67,000 | $ 67,000 | $ 67,000 | |
2021 | Prince George's | 16.231.21 | Mary Mother Jones Elementary | PA System | Replace the public address system for the entire school. | $ 69,000 | $ 69,000 | $ 69,000 | |
2021 | Prince George's | 16.014.21 | Laurel High | PA System | Replace the public address system for the entire school. | $ 99,000 | $ 99,000 | $ 99,000 | |
2021 | Prince George's | 16.222.21 | Robert Gray Elementary | PA System | Replace the public address system for the entire school. | $ 64,000 | $ 64,000 | $ 64,000 | |
2021 | Prince George's | 16.089.21 | Bowie High | PA System | Replace the public address system for the entire school. | $ 86,000 | $ 86,000 | $ 86,000 | |
2021 | Prince George's | 16.234.21 | Lake Arbor Elementary | PA System | Replace the public address system for the entire school. | $ 73,000 | $ 73,000 | $ 73,000 | |
2021 | Prince George's | 16.117.21 | Dodge Park Elementary | PA System | Replace the public address system for the entire school. | $ 56,000 | $ 56,000 | $ 38,756 | |
2021 | Prince George's | 16.220.21 | Berwyn Heights Elementary | PA System | Replace the public address system for the entire school. | $ 80,000 | $ 80,000 | $ 41,625 | |
2021 | Prince George's | 16.209.21 | Patuxent Elementary | PA System | Replace the public address system for the entire school. | $ 66,000 | $ 66,000 | $ 66,000 | |
2021 | Washington | 21.008.21 | Smithsburg Middle | Fire Alarm System | Replace the existing fire alarm system, installed in 1976. | $ 200,000 | $ 134,904 | $ 134,904 | |
2021 | Baltimore County | 03.102.21 | Featherbed Lane Elementary | Doors | Replace original doors that are in poor condition. | $ 170,000 | $ 150,000 | $ 143,615 | |
2021 | Baltimore County | 03.102.21 | Featherbed Lane Elementary | Health Suite Renovation | Improve the original health suite office, including the triage and sick students areas. | $ 120,000 | $ 100,000 | $ 100,000 | |
2021 | Baltimore County | 03.011.21 | Perry Hall High | Door Lite Installation | Provide door lites into existing solid doors to increase visibility and increase the safety and security of the students and staff. | $ 65,000 | $ 55,000 | $ 55,000 | |
2021 | Worcester | 23.004.21 | Stephen Decatur High | Exterior Masonry Walls | Repair of approximately 3,000 square feet of masonry wall at the school gymnasium walls and at the auditorium wall. | $ 39,000 | $ 39,000 | $ 39,000 | |
2021 | Wicomico | 22.015.21 | Wicomico Middle | Masonry | Repair of masonry wall. | $ 37,273 | $ 37,273 | $ 37,273 | |
2021 | Anne Arundel | 02.088.21 | Hilltop Elementary | Exterior Doors & Frames | Remove and replace 28 exterior doors, 19 door frames and side lights. | $ 107,464 | $ 107,464 | $ 107,464 | |
2021 | Anne Arundel | 02.095.21 | Marley Glen Special | Exterior Doors & Frames | Remove and replace 37 exterior doors and 7 door frames. | $ 196,243 | $ 115,342 | $ 115,342 | |
2021 | Cecil | 07.027.21 | Bohemia Manor Middle/High | Audio System | Upgrade the outdated public announcement system. | $ 17,000 | $ 17,000 | $ 16,552 | |
2021 | Baltimore City | 30.179.21 | Lakeland PK-8 # 012 | Gym Floor Replacement | Replace gym floor and athletic markings. | $ 52,000 | $ 52,000 | $ 52,000 | |
2021 | Baltimore City | 30.276.21 | Bragg Nature Center Farm | Masonry | Remove and replace the existing sidewalk. | $ 54,100 | $ 54,100 | $ 54,100 | |
2021 | Baltimore City | 30.250.21 | Cecil Elementary | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,992 | $ 24,992 | $ 24,992 | |
2021 | Baltimore City | 30.218.21 | Dr. Nathan Pitts #058 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,950 | $ 24,950 | $ 24,925 | |
2021 | Baltimore City | 30.115.21 | Excel At Francis Woods #178 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,968 | $ 24,968 | $ 24,968 | |
2021 | Baltimore City | 30.246.21 | Edmondson High #400 | Intercom & Paging System | Replace and install intercom and paging system. | $ 43,056 | $ 43,056 | $ 43,007 | |
2021 | Baltimore City | 30.180.21 | Westside Skill Center | Intercom & Paging System | Replace and install intercom and paging system. | $ 23,076 | $ 23,076 | $ 23,076 | |
2021 | Baltimore City | 30.045.21 | Windsor Hills #087 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,988 | $ 24,988 | $ 24,848 | |
2021 | Baltimore City | 30.090.21 | Thomas Jefferson Elementary #232 | Intercom & Paging System | Replace and install intercom and paging system. | $ 24,973 | $ 24,973 | $ 24,973 | |
2021 | Cecil | 07.022.21 | Rising Sun High | Sidewalks | Repair and replace deteriorating sidewalks. | $ 15,000 | $ 15,000 | $ 10,400 | |
2021 | Baltimore City | 30.195.21 | Beechfield Elementary | Playground Equipment | Replace and install playground equipment. | $ 40,880 | $ 40,880 | $ 40,880 | |
2021 | Cecil | 07.034.21 | Bainbridge Elementary | VCT Flooring | Replace deteriorating carpeting. | $ 16,500 | $ 16,500 | $ 10,890 | |
2021 | Cecil | 07.035.21 | North East Elementary | VCT Flooring | Replace deteriorating carpeting. | $ 20,000 | $ 20,000 | $ 12,509 | |
2021 | Prince George's | 16.194.21 | DuVal High | Tennis Court | Refurbish two tennis courts. | $ 150,000 | $ 150,000 | $ 150,000 | |
2021 | Prince George's | 16.174.21 | Charles H. Flowers High | Tennis Court | Refurbish four tennis courts. | $ 190,000 | $ 190,000 | $ 190,000 | |
2021 | Calvert | 04.019.21 | Patuxent High | Intercom System | Partial intercom system replacement, including the head end equipment, the administrative desk intercom phone units and programming. | $ 49,753 | $ 38,292 | $ 38,292 | |
2021 | Montgomery | 15.151.21 | McAuliffe Elementary | Ceiling Tile Replacement | The phase 1st is to replace tectum ceiling tiles and existing fluorescent light fixtures. | $ 60,000 | $ 60,000 | $ 68,030 | |
2021 | Montgomery | 15.007.21 | Cold Spring Elementary | Masonry Wall Repair | Repair of masonry wall. | $ 49,790 | $ 49,790 | $ 41,760 | |
2022 | Baltimore City | 30.197.22 | James McHenry Elementary | Playground | Replace playground equipment and rubber surface. | $ 42,000 | $ 42,000 | $ 42,000 | |
2022 | Baltimore City | 30.045.22 | Windsor Hills | Wall /Step | Rebuild stone wall and steps in the rear | $ 15,000 | $ 15,000 | $ 15,000 | |
2022 | Baltimore City | 30.056.22 | George Kelson ES (sandtown Winchester Academy) | Sidewalk replacement and Asphalt resurfacing | Replace concrete sidewalks and resurface asphalt surfaces including parking lot | $ 145,000 | $ 145,000 | $ 143,725 | |
2022 | Dorchester | 09.014.22 | Hurlock Elementary | Access Control | Furnish and install access control on essential exterior doors. | $ 23,365 | $ 23,365 | $ 23,365 | |
2022 | Harford | 12.036.22 | Hall's Cross Roads | Wheelchair Lift | Replace the existing wheelchair lift with a commercial lift. | $ 36,000 | $ 36,000 | $ 36,000 | |
2022 | Kent | 14.007.22 | Kent County HS | Drainage Repairs | Resurfacing track | $ 40,900 | $ 40,900 | $ 25,120 | |
2022 | Queen Anne's | 17.005.22 | Centreville Es | PA System | Installing a new headend, admin console, speakers, and wiring to replace the existing PA system that was installed in 2003. | $ 50,000 | $ 50,000 | $ 50,000 | |
2022 | Montgomery | 15.107.22 | Sherwood ES | Door windows and Frame installation | Replacing the original wire pane glass windows and metal door frames with thermal glass door windows and frames on the original sections of Sherwood elementary. | $ 313,000 | $ 313,000 | $ 312,651 | |
2022 | Montgomery | 15.164.22 | Brooke Grove ES | Elevator Replacement | Modernize the two stop elevator to be in compliance with ADA regulations | $ 290,000 | $ 290,000 | $ 290,000 | |
2022 | Cecil | 07.029.22 | Elkton Middle | Window Painting | Prep and paint all metal windows and soffits | $ 30,325 | $ 30,325 | $ 30,325 | |
2022 | Cecil | 07.014.22 | Calvert Elementary | Gutter Replacement | Complete gutter and downspout replacement | $ 35,000 | $ 35,000 | $ 35,000 | |
2022 | Cecil | 07.021.22 | Kenmore Elementary | gutter replacement | Complete gutter and downspout replacement | $ 10,728 | $ 10,728 | $ 10,728 | |
2022 | Washington | 21.020.22 | South Hagerstown High | Gym Bleacher Replacement | Replace the existing wood bleachers. | $ 200,000 | $ 134,904 | $ 134,904 | |
2022 | Anne Arundel | 02.037.22 | Bates Middle | Wheelchair Lift Replacement | Remove and replace existing chairlift. | $ 40,000 | $ 40,000 | $ 40,000 | |
2022 | Anne Arundel | 02.066.22 | Meade Heights Elementary | Replace Folding Doors in Gym/Café | Remove and replace folding doors in Gym/Cafe. | $ 70,000 | $ 70,000 | $ 70,000 | |
2022 | Anne Arundel | 02.075.22 | Deale Elementary | Replace Folding Doors in Gym/Café | Remove and replace folding doors in Gym/Café | $ 75,000 | $ 75,000 | $ 75,000 | |
2022 | Anne Arundel | 02.040.22 | Arundel High | Wheelchair Lift Replacement | Remove and replace existing chair lift. | $ 40,000 | $ 40,000 | $ 40,000 | |
2022 | Anne Arundel | 02.057.22 | Arundel Middle | Wheelchair Lift Replacement | Remove and replace existing wheelchair lift | $ 40,000 | $ 11,000 | $ 11,000 | |
2022 | Anne Arundel | 02.010.22 | Four Seasons Elementary | Gym/Cafe Folding Doors | Install Folding Doors in Gym/Café | $ 65,000 | $ 65,000 | $ 65,000 | |
2022 | Anne Arundel | 02.092.22 | Brooklyn Park Middle | Replacement of Wheelchair Lift | Wheelchair Lift Replacement | $ 40,000 | $ 40,000 | $ 40,000 | |
2022 | Anne Arundel | 02.113.22 | Shady Side Elementary | Playground Equipment | Replace playground equipment. | $ 165,000 | $ 165,000 | $ 165,000 | |
2022 | Prince George's | 16.011.22 | Largo High | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 217,520 | $ 217,520 | $ 217,520 | |
2022 | Prince George's | 16.153.21 | Carole Highlands Elementary | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 134,197 | $ 134,197 | $ 134,197 | |
2022 | Prince Georges | 16.043.22 | Kettering Middle | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 158,236 | $ 158,236 | $ 158,236 | |
2022 | Prince Georges | 16.213.22 | Martin Luther King Middle | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 155,955 | $ 155,955 | $ 155,955 | |
2022 | Prince Georges | 16.107.22 | Gladys Noon Spellman ES | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 122,738 | $ 122,738 | $ 122,738 | |
2022 | Prince Georges | 16.197.22 | Andrew Jackson Academy | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 147,367 | $ 147,367 | $ 147,367 | |
2022 | Prince Georges | 16.025.22 | Bradbury Heights Elementary | Public Address System Replacement | Replace PA System, headend unit, call switches, administrative paging station, clocks, and exterior speakers. | $ 138,004 | $ 138,004 | $ 138,004 | |
2022 | Howard | 13.005.22 | Centennial Lane Elementary | Playground Replacement | Replace the existing Kindergarten area playground installed in 2001. | $ 92,000 | $ 87,776 | $ 87,776 | |
2022 | Baltimore City | 30.234.22 | Johnston Square | Urinal Replacement | Remove original floor-mounted urinals and hang 4 new walls hung urinals and install four new flush valves. | $ 19,000 | $ 19,000 | $ 19,000 | |
2022 | Wicomico | 22.002.22 | Pinehurst Elementary | Floor Replacement | Remove and install new rubber flooring. | $ 46,971 | $ 46,000 | $ 46,000 | |
2022 | Cecil | 07.026.22 | Rising Sun Elementary | Playground Equipment Replacement | Installation of new playground equipment. | $ 11,500 | $ 11,500 | $ 11,500 | |
2022 | Somerset | 19.004.22 | Crisfield Academy and High School | Gymnasium Floor Resurfacing | Refinish main gymnasium floor, auxiliary gymnasium floors, and auditorium stage including treads and risers. | $ 35,450 | $ 35,450 | $ 35,450 | |
2022 | Harford | 12.001.22 | Fallston High | Bleacher Seating Replacement | Replace the bleacher and support posts. | $ 31,000 | $ 31,000 | $ 31,000 | |
2022 | Wicomico | 22.022.22 | Pinehurst Elementary | VCT Floor Replacement | Replace the VCT Flooring on the 2nd floor | $ 24,728 | $ 24,000 | $ 24,000 | |
2022 | Wicomico | 22.022.22 | Pinehurst Elementary | Rubber Floor Replacement | Removal and installation of new rubber flooring | $ 37,295 | $ 36,627 | $ 36,627 | |
2022 | Baltimore City | 30.242.22 | Matthew A. Henson Elementary #o29 | Asphalt Replacement | Reconstruction of entire rear parking area. | $ 160,000 | $ 160,000 | $ 160,000 | |
2022 | Baltimore City | 30.023.22 | Francis Scott Key Elementary/Middle #076 | Playground Equipment | Replace playground equipment and associated site work. | $ 16,000 | $ 16,000 | $ 16,000 | |
2022 | Charles | 08.011.22 | Arthur Middleton Elementary | Switchgear Replacement | Replace the switchgear. | $ 400,000 | $ 209,492 | $ 209,492 | |
2022 | Baltimore City | 30.243.22 | Franklin Square PreK-8 #095 | Gymnasium Floor Replacement | Replace Gymnasium Floor | $ 79,265 | $ 79,265 | $ 79,265 | |
2022 | Baltimore City | 30.029.22 | Margaret Brent PreK-8 #053 | Gymnasium Floor Replacement | Replace Gymnasium floor. | $ 98,360 | $ 98,360 | $ 98,360 | |
2022 | Baltimore City | 30.148.22 | Falstaff PreK-8 #241 | Gymnasium Floor Replacement | Replace Gymnasium floor. | $ 85,000 | $ 85,000 | $ 85,000 | |
2022 | Baltimore City | 30.113.22 | Carver Vocational -Technical High (CTE) #454 | Plumbing Replacement | Replace existing drain tile. | $ 125,450 | $ 125,450 | $ 125,450 | |
2022 | Baltimore City | 30.020.22 | Dallas F. Nicholas Elementary #039 | Water Heaters Replacement | Replace existing water heaters with 4 Navo tankless water heaters and install new PVC flues. | $ 37,500 | $ 37,500 | $ 37,500 | |
2022 | Baltimore City | 30.095.22 | Glenmount PreK-8 #235 | Plumbing Replacement | Replace plumbing. | $ 18,400 | $ 18,400 | $ 18,400 | |
2022 | Baltimore City | 30.181.22 | Francis Scott Key Elementary/Middle School | Asphault Repair | Replace concrete. | $ 33,516 | $ 33,516 | $ 33,516 | |
2022 | Carroll | 06.048.22 | Century High School | Elevator Replacement | Replace Elevator Components | $ 56,450 | $ 56,450 | $ 56,450 | |
2022 | Carroll | 06.052.22 | Winters Mill High School | Elevator Replacement | Replace Elevator Components | $ 56,450 | $ 56,450 | $ 56,450 | |
2022 | Carroll | 06.024.22 | Francis Scott Key High School | Elevator Replacement | Replace Elevator Components | $ 56,450 | $ 24,361 | $ 24,361 | |
2022 | Baltimore City | 30.188.22 | Walbrook KIPP #347 | Concrete Sidewalks | Install concrete sidewalks. | $ 17,400 | $ 17,400 | $ 17,400 | |
2022 | Baltimore County | 03.011.22 | Perry Hall High | Replace Intercom | Replace Intercom | $ 655,000 | $ 655,000 | $ 655,000 | |
2022 | Baltimore County | 03.111.22 | Woodmoor Elementary | Replace Intercom | Replace Intercom | $ 210,000 | $ 210,000 | $ 210,000 | |
2022 | Baltimore County | 03.069.22 | Padonia International Elementary School | Replace the fencing Improv | Fencing Improvements | $ 35,000 | $ 35,000 | $ 35,000 | |
2022 | Baltimore County | 03.147.22 | Deer Park Middle | Replace Chair lift. | Replace chairlift. | $ 45,500 | $ 45,500 | $ 45,435 | |
2022 | Baltimore City | 30.210.22 | Garrett Heights PreK-8 #212 | Water Heaters Replacement | Replace existing water heaters with four (4) Navo tankless water heaters and install new PVC flues. | $ 53,000 | $ 53,000 | $ 53,000 | |
2022 | Baltimore City | 30.061.22 | Furman Templeton PreK-5 #125 | Water Heaters Replacement | Replace existing water heaters with 4 Navo tankless water heaters and install PVC flues. | $ 45,050 | $ 45,050 | $ 45,050 | |
2022 | Baltimore City | 30.224.22 | Abbottston Elementary | Playground Rubber Surface | Installation of rubber surface and resources to support equipment installation. | $ 49,000 | $ 49,000 | $ 49,000 | |
2022 | Garrett | 11.009.22 | Northern Middle | PA System | Replace PA system. | $ 21,959 | $ 21,959 | $ 21,959 | |
2022 | Baltimore City | 30.402.22 | Northern Building (AKA Reginald Lewis) | Fence Replacement | Replace the fencing around the stadium field area. | $ 16,500 | $ 16,500 | $ 16,500 | |
2022 | Calvert | 04.022.22 | Windy Hill Middle | Intercom and Paging System | Partial intercom system replacement, including the paging system. | $ 29,990 | $ 29,990 | $ 29,990 | |
2022 | St.Mary's County | 18.019.22 | Chopticon High School | Restroom Renovation | To replace the floor title, stall partitions, urinals in one of th restrooms with the inclusion of privacy screens for each urinal. | $ 50,508 | $ 50,074 | $ 50,074 | |
2022 | Baltimore City | 30.274.22 | Harlem Park Building #078 | Asphalt and Concrete | Asphalt and concrete replacement. | $ 177,144 | $ 177,114 | $ 177,114 | |
2022 | Baltimore City | 30.041.22 | North Bend Elementary | Asphalt and Concrete Repair | Provide new concrete sidewalks and aprons , asphalt overlay : | $ 207,000 | $ 207,000 | $ 207,000 | |
2022 | Dorchester | 09.005.22 | Vienna Elementary | Access Control Exterior Doors | Install access control to exterior doors for continued exterior security measures. | $ 40,302 | $ 38,292 | $ 38,292 | |
2022 | Dorchester | 09.010.22 | Maple Elementary | Access Control Exterior Doors | Install Access Control on exterior doors | $ 31,868 | $ 14,927 | $ 14,927 | |
2022 | Frederick | 10.052.22 | Orchard Grove ES | Fire Alarm Replacement | Replace fire alarm system with current code complaint equipment providing strobes and voice evacuation. | $ 182,622 | $ 182,622 | $ 182,622 | |
2022 | Garrett | 11.009.22 | Grantville ES | PA System | Installation of 40 speakers, and 10 horns to replace the PA system | $ 16,033 | $ 16,003 | $ 16,003 | |
2023 | Cecil County | 07.013.23 | Perryville High | Refurbishment track surfacing | Resurface, clean, patch and re-line multiple layering of the deteriorated track. | $ 40,000 | $ 40,000 | $ 40,000 | |
2023 | Cecil County | 07.024.23 | Elk Neck Elementary | Replace existing urethane gym floor | Gym floor replacement | $ 46,000 | $ 46,000 | $ 46,000 | |
2023 | Cecil County | 07.019.23 | Conowingo Elementary | Replacements Classroom flooring | Remove existing deteriorated carpeting and replace with new VCT flooring in approx 8. classrooms | $ 24,000 | $ 24,000 | $ 24,000 | |
2023 | Frederick County | 10.008.23 | Thurmont Middle | Fire Alarm Replacement | Replace the 2002 fire alarm system. | $ 182,622 | $ 182,622 | $ 182,622 | |
2023 | Montgomery | 15.226.23 | Blake(James Hubert) High | Sound System Replacement | Replace the sound system in the auditorium. | $ 210,000 | $ 210,000 | $ 210,000 | |
2023 | Montgomery | 15.089.23 | New Hampshire Estate Elementary School | Elevator Replacement | Replace the elevator. | $ 275,000 | $ 275,000 | $ 275,000 | |
2023 | Montgomery | 15.166.23 | Watkins Mill High | Doors / Frames Replacement | Replace the exterior doors and frames. | $ 118,000 | $ 118,000 | $ 117,651 | |
2023 | Queen Anne's | 17.013.23 | Church Hill Elementary | Telephone Replacement | Replace the telephone system. | $ 24,900 | $ 24,900 | $ 24,900 | |
2023 | Queen Anne's | 17.005.23 | Centreville Elementary | Telephone Replacement | Replace the telephone system. | $ 24,900 | $ 24,900 | $ 24,900 | |
2023 | Frederick County | 10.008.23 | Thurmont Middle | Replace fire alarms | Replacement of the schools fire alarm system. The existing system is beyond its useful life and replacement parts are limited. This project replaces the fire alarm installed in 2002, updating the fire alarm system to current code standards and adding voice evacuation. | $ 182,622 | $ 182,622 | 0 | |
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | State ASP Approved | State/Local Cost Share |
FY 2000-2009
ASP 00-09
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | State ASP Approved | State/Local Cost Share |
---|---|---|---|---|---|---|---|---|---|
2000 | Allegany | 01.036.00 | Westmar Middle | Boiler Replacement | Replace boiler | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Allegany | 01.014.00 | Westmar High | Lighting | Replace field lights and tower | $ 180,000 | $ 180,000 | $ 180,000 | |
2000 | Allegany | 01.022.00 | Cash Valley Elementary | Door Replacement | Replace exterior door | $ 10,000 | $ 10,000 | $ 10,000 | |
2000 | Allegany | 01.022.00 | Cash Valley Elementary | AHU Replacement | Replace AHU | $ 100,000 | $ 100,000 | $ 100,000 | |
2000 | Anne Arundel | 02.007.00 | Magothy River Middle | Flooring | Carpet replacement | $ 117,926 | $ 117,926 | $ 117,926 | |
2000 | Anne Arundel | 02.012.00 | Chesapeake High | Flooring | Carpet replacement | $ 147,301 | $ 147,301 | $ 147,301 | |
2000 | Anne Arundel | 02.088.00 | Hilltop Elementary | Flooring | Carpet replacement | $ 39,305 | $ 39,305 | $ 39,305 | |
2000 | Anne Arundel | 02.022.00 | Richard Henry Lee Elementary | Flooring | Carpet and tile replacement | $ 58,000 | $ 58,000 | $ 58,000 | |
2000 | Anne Arundel | 02.115.00 | Crofton Woods Elementary | Flooring | Carpet and tile replacement | $ 73,000 | $ 73,000 | $ 73,000 | |
2000 | Anne Arundel | 02.108.00 | Sunset Elementary | Flooring | Carpet and tile replacement | $ 73,000 | $ 73,000 | $ 73,000 | |
2000 | Anne Arundel | 02.085.00 | Brooklyn Park Elementary | Flooring | Carpet and tile replacement | $ 81,652 | $ 81,652 | $ 81,652 | |
2000 | Baltimore County | 03.154.00 | Loch Raven Technical Academy | Code upgrade to black box theatre. | $ 209,800 | $ 209,800 | $ 209,800 | ||
2000 | Baltimore County | 03.195.00 | Ridge Ruxton Special Education | Replace heating piping/ATC/unit ventilator/fire alarm/plumbing | $ 435,000 | $ 435,000 | $ 435,000 | ||
2000 | Baltimore County | 03.133.00 | Dulaney High | Bleacher Replacement | Replace gym bleachers | $ 88,900 | $ 88,900 | $ 88,900 | |
2000 | Baltimore County | 03.149.00 | Lansdowne High | Locker Replacement | Replace gym lockers (boys) | $ 100,000 | $ 100,000 | $ 100,000 | |
2000 | Baltimore County | 03.177.00 | Catonsville Elementary | Lighting | Replace emergency lighting | $ 20,125 | $ 20,125 | $ 20,125 | |
2000 | Baltimore County | 03.160.00 | Arbutus Elementary | Lighting | Replace electrical distribution and lighting panel | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Baltimore County | 03.101.00 | Edmondson Heights Elementary | Replace toilet room partitions | $ 20,000 | $ 20,000 | $ 20,000 | ||
2000 | Baltimore County | 03.184.00 | Riverview Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 84,000 | $ 84,000 | $ 84,000 | |
2000 | Baltimore County | 03.184.00 | Riverview Elementary | Replace toilet room partitions | $ 30,000 | $ 30,000 | $ 30,000 | ||
2000 | Baltimore County | 03.032.00 | Randallstown High | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Baltimore County | 03.033.00 | Pikesville High | Locker Replacement | Replace gym lockers (boys) | $ 100,000 | $ 100,000 | $ 100,000 | |
2000 | Baltimore County | 03.136.00 | Campfield Early Childhood Center | Replace toilet room partitions | $ 35,000 | $ 35,000 | $ 35,000 | ||
2000 | Queen Anne's | 17.004.00 | Centreville Middle | Rooftop unit Replacement | Replacement of rooftop unit over pod B | $ 85,000 | $ 85,000 | $ 85,000 | |
2000 | Wicomico | 22.007.00 | Delmar Elementary | P.A. System Replacement | $ 25,000 | $ 25,000 | $ 25,000 | ||
2000 | Wicomico | 22.021.00 | Bennett Middle | Lighting | Replace gym lighting | $ 14,500 | $ 14,500 | $ 14,500 | |
2000 | Harford | 12.022.00 | Homestead/Wakefield Elementary | Asbestos abatement | $ 14,000 | $ 14,000 | $ 14,000 | ||
2000 | Cecil | 07.012.00 | North East Middle | Pavement repairs | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Cecil | 07.018.00 | Perryville Middle | Pavement repairs | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Cecil | 07.016.00 | Gilpin Manor Elementary | Pave parking lot in front of building | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Cecil | 07.021.00 | Kenmore Elementary | New sidewalk | $ 11,400 | $ 11,400 | $ 11,400 | ||
2000 | Baltimore County | 03.183.00 | Wellwood International Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 81,089 | $ 81,089 | $ 81,089 | |
2000 | Baltimore County | 03.111.00 | Woodmoor Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Baltimore County | 03.111.00 | Woodmoor Elementary | Door Replacement | Replace interior doors | $ 139,258 | $ 139,258 | $ 139,258 | |
2000 | Baltimore County | 03.111.00 | Woodmoor Elementary | Replace toilet room partitions | $ 80,000 | $ 80,000 | $ 80,000 | ||
2000 | Baltimore County | 03.120.00 | Franklin High | Bleacher Replacement | Replace gym bleachers | $ 80,000 | $ 80,000 | $ 80,000 | |
2000 | Baltimore County | 03.011.00 | Perry Hall High | Elevator Upgrade | $ 50,000 | $ 50,000 | $ 50,000 | ||
2000 | Baltimore County | 03.070.00 | Perry Hall Elementary | Door Replacement | Replace interior doors | $ 137,705 | $ 137,705 | $ 137,705 | |
2000 | Baltimore County | 03.070.00 | Perry Hall Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 73,083 | $ 73,083 | $ 73,083 | |
2000 | Baltimore County | 03.175.00 | Glenmar Elementary | Door Replacement | Replace exterior doors | $ 116,046 | $ 116,046 | $ 116,046 | |
2000 | Baltimore County | 03.175.00 | Glenmar Elementary | Door Replacement | Replace interior doors | $ 97,000 | $ 97,000 | $ 97,000 | |
2000 | Baltimore County | 03.165.00 | Overlea High | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Baltimore County | 03.165.00 | Overlea High | Bleacher Replacement | Replace gym bleachers | $ 91,900 | $ 91,900 | $ 91,900 | |
2000 | Baltimore County | 03.134.00 | Loch Raven High | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Baltimore County | 03.134.00 | Loch Raven High | Greenhouse renovation | $ 76,995 | $ 76,995 | $ 76,995 | ||
2000 | Baltimore County | 03.051.00 | Sparrows Point Middle/High | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Baltimore County | 03.051.00 | Sparrows Point Middle/High | Bleacher Replacement | Replace gym bleachers | $ 80,000 | $ 80,000 | $ 80,000 | |
2000 | Baltimore County | 03.051.00 | Sparrows Point Middle/High | Locker Replacement | Replace gym lockers (boys) | $ 133,340 | $ 133,340 | $ 133,340 | |
2000 | Baltimore County | 03.151.00 | Colgate Elementary | Locker Replacement | Replace hall lockers | $ 40,900 | $ 40,900 | $ 40,900 | |
2000 | Baltimore County | 03.145.00 | Patapsco High | Locker Replacement | Replace gym lockers (boys) | $ 100,000 | $ 100,000 | $ 100,000 | |
2000 | Baltimore County | 03.020.00 | Mars Estates Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 104,760 | $ 104,760 | $ 104,760 | |
2000 | Baltimore County | 03.020.00 | Mars Estates Elementary | Replace toilet room partitions | $ 30,000 | $ 30,000 | $ 30,000 | ||
2000 | Baltimore County | 03.155.00 | Norwood Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 78,067 | $ 78,067 | $ 78,067 | |
2000 | Baltimore County | 03.174.00 | Berkshire Elementary | Door and frame Replacement | Replace exterior doors and frames | $ 75,000 | $ 75,000 | $ 75,000 | |
2000 | Baltimore County | 03.174.00 | Berkshire Elementary | Door Replacement | Replace interior doors | $ 78,218 | $ 78,218 | $ 78,218 | |
2000 | Baltimore County | 03.003.00 | Chesapeake High | Lighting | Replace auditorium stage lighting panel | $ 59,686 | $ 59,686 | $ 59,686 | |
2000 | Baltimore County | 03.073.00 | Owings Mills High | Open Space Enclosure | Divide open space into four classrooms | $ 87,800 | $ 87,800 | $ 87,800 | |
2000 | Baltimore County | 03.148.00 | Kenwood High | Flooring | Floor tile replacement | $ 46,694 | $ 46,694 | $ 46,694 | |
2000 | Calvert | 04.001.00 | Calvert Middle | Construct elevator shaft | $ 65,000 | $ 65,000 | $ 65,000 | ||
2000 | Caroline | 05.008.00 | Preston Elementary | HVAC | $ 58,000 | $ 58,000 | $ 58,000 | ||
2000 | Caroline | 05.005.00 | Lockerman Middle | Roof Repair | Penthouse/roof repair | $ 13,700 | $ 13,700 | $ 13,700 | |
2000 | Caroline | 05.004.00 | Colonel Richardson High | ADA modifications | $ 14,800 | $ 14,800 | $ 14,800 | ||
2000 | Carroll | 06.030.00 | Mt. Airy Elementary | Replace exterior masonry | $ 97,345 | $ 97,345 | $ 97,345 | ||
2000 | Carroll | 06.004.00 | Westminster East Middle | Boiler | Convert boilers | $ 49,000 | $ 49,000 | $ 49,000 | |
2000 | Carroll | 06.004.00 | Westminster East Middle | Bleacher Replacement | Gymnasium bleacher replacement | $ 60,000 | $ 60,000 | $ 60,000 | |
2000 | Carroll | 06.002.00 | Northwest Middle | Bleacher Replacement | Replace gym bleachers | $ 40,112 | $ 40,112 | $ 40,112 | |
2000 | Carroll | 06.025.00 | William Winchester Elementary | Replace building controls | $ 22,109 | $ 22,109 | $ 22,109 | ||
2000 | Carroll | 06.042.00 | Westminster High | Door and frame Replacement | Replace entrance doors and frames | $ 59,039 | $ 59,039 | $ 59,039 | |
2000 | Cecil | 07.039.00 | Cherry Hill Middle | Flooring | Replace gym floor | $ 85,885 | $ 85,885 | $ 85,885 | |
2000 | Carroll | 06.019.00 | Liberty High | Re-piping of domestic water system throughout school | $ 120,000 | $ 120,000 | $ 120,000 | ||
2000 | Cecil | 07.015.00 | Chesapeake City Elementary | Fire Alarm System Upgrade | Upgrade fire alarm system | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Cecil | 07.039.00 | Cherry Hill Middle | Fire Alarm System Upgrade | Upgrade fire safety protection system | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Cecil | 07.020.00 | Perryville Elementary | Fire Alarm System Upgrade | Upgrade fire alarm system | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Cecil | 07.040.00 | North East High | Fire Alarm System Upgrade | Fire Alarm System Upgrade | $ 20,000 | $ 20,000 | $ 20,000 | |
2000 | Cecil | 07.039.00 | Cherry Hill Middle | Lighting Upgrade | Upgrade site lighting | $ 14,000 | $ 14,000 | $ 14,000 | |
2000 | Cecil | 07.012.00 | North East Middle | Lighting Upgrade | Upgrade lighting | $ 15,000 | $ 15,000 | $ 15,000 | |
2000 | Charles | 08.003.00 | John Hanson Middle | Replace seats in lecture hall | $ 10,000 | $ 10,000 | $ 10,000 | ||
2000 | Charles | 08.004.00 | Dr. Gustavus Brown Elementary | Flooring | Replace carpeting | $ 55,000 | $ 55,000 | $ 55,000 | |
2000 | Dorchester | 09.009.00 | Cambridge-South Dorchester High | Lighting | Renovate site lighting | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Frederick | 10.001.00 | Middletown Elementary | Window Replacement | Exterior window replacement | $ 28,333 | $ 28,333 | $ 28,333 | |
2000 | Frederick | 10.004.00 | Lincoln "B" Elementary | Window Replacement | Exterior window replacement | $ 28,333 | $ 28,333 | $ 28,333 | |
2000 | Frederick | 10.009.00 | Frederick High | Window Replacement | Exterior window replacement | $ 28,334 | $ 28,334 | $ 28,334 | |
2000 | Garrett | 11.008.00 | Southern Middle | Carpet Replacement | Replace existing carpet | $ 85,000 | $ 67,500 | $ 67,500 | |
2000 | Garrett | 11.002.00 | Friendsville Elementary | Flooring | Floor tile replacement | $ 17,500 | $ 17,500 | $ 17,500 | |
2000 | Harford | 12.021.00 | Magnolia Middle | Flooring | Carpet replacement | $ 110,000 | $ 110,000 | $ 110,000 | |
2000 | Harford | 12.050.00 | Southampton Middle | Flooring | Carpet replacement | $ 45,000 | $ 45,000 | $ 45,000 | |
2000 | Harford | 12.011.00 | Youth's Benefit Elementary | Carpet replacement | Carpet replacement | $ 90,000 | $ 90,000 | $ 90,000 | |
2000 | Harford | 12.009.00 | Edgewood High | Fire Alarm System Replacement | Alarm system replacement | $ 87,638 | $ 87,638 | $ 87,638 | |
2000 | Harford | 12.006.00 | Aberdeen Middle | Partition Replacement | Replacement of partition | $ 15,000 | $ 10,955 | $ 10,955 | |
2000 | Harford | 12.021.00 | Magnolia Middle | Cooling tower Replacement | Replacement of cooling tower | $ 50,000 | $ 50,000 | $ 50,000 | |
2000 | Cecil | 07.039.00 | Cherry Hill Middle | HVAC System Replacement | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Cecil | 07.020.00 | Perryville Elementary | Ceiling Tiles Replacement | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Cecil | 07.018.00 | Perryville Middle | Fire Alarm System Replacement | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Cecil | 07.012.00 | North East Middle | Fire Alarm System Replacement | Replace fire alarm system | $ 14,500 | $ 14,500 | $ 14,500 | |
2000 | Cecil | 07.040.00 | North East High | Asbestos Abatement | Floor tile and asbestos abatement | $ 29,000 | $ 29,000 | $ 29,000 | |
2000 | Harford | 12.017.00 | Jarrettsville Elementary | Cooling tower Replacement | Replacement of cooling tower | $ 38,475 | $ 38,475 | $ 38,475 | |
2000 | Howard | 13.075.00 | Thunder Hill Elementary | Door Replacement | Replacement of doors | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Kent | 14.006.00 | Garnett Elementary | Window Replacement | Exterior window replacement | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Montgomery | 15.179.00 | Cannon Road Elementary | Flooring | Floor tile and asbestos abatement | $ 22,725 | $ 22,725 | $ 22,725 | |
2000 | Montgomery | 15.108.00 | East Silver Spring Elementary | Painting | Interior painting | $ 35,000 | $ 35,000 | $ 22,000 | |
2000 | Montgomery | 15.037.00 | Eastern Middle | Painting | Interior painting | $ 28,000 | $ 28,000 | $ 23,550 | |
2000 | Montgomery | 15.037.00 | Eastern Middle | Plumbing Replacement | Replace plumbing fixture | $ 38,800 | $ 38,800 | $ 38,800 | |
2000 | Montgomery | 15.197.00 | Farquhar Middle | Lighting | Lights dimmer panel | $ 30,000 | $ 30,000 | $ 12,815 | |
2000 | Montgomery | 15.020.00 | Fields Road Elementary | Folding wall partition replacement | $ 65,000 | $ 65,000 | $ 62,230 | ||
2000 | Montgomery | 15.130.00 | Gaithersburg High | Flooring | Gym floor refinishing | $ 30,000 | $ 30,000 | $ 29,078 | |
2000 | Montgomery | 15.130.00 | Gaithersburg High | Door Replacement | Replace exterior doors | $ 28,000 | $ 28,000 | $ 25,476 | |
2000 | Montgomery | 15.144.00 | Gaithersburg Elementary | Generator Replacement | Replace emergency generators | $ 39,200 | $ 39,200 | $ 39,200 | |
2000 | Montgomery | 15.013.00 | Germantown Elementary | Windows and Door Replacement | $ 65,532 | $ 65,532 | $ 65,532 | ||
2000 | Montgomery | 15.054.00 | Glenallan Elementary | Flooring | Carpet and floor tile | $ 10,230 | $ 10,230 | $ 10,230 | |
2000 | Montgomery | 15.241.00 | Hoover Middle | Flooring | Carpet and floor tile | $ 43,125 | $ 43,125 | $ 43,125 | |
2000 | Montgomery | 15.255.00 | Lynnbrook Center | Windows and Doors Replacement | Replace windows and doors | $ 61,251 | $ 61,251 | $ 61,251 | |
2000 | Montgomery | 15.045.00 | Col. Zadok Magruder High | Ceiling Tile Replacement | Replace ceiling tile | $ 85,000 | $ 85,000 | $ 84,150 | |
2000 | Montgomery | 15.005.00 | Richard Montgomery High | Field renovation | $ 15,000 | $ 15,000 | $ 13,440 | ||
2000 | Montgomery | 15.256.00 | Northwood High | Flooring | Replace gym floor | $ 120,000 | $ 120,000 | $ 89,975 | |
2000 | Montgomery | 15.256.00 | Northwood High | Painting | Interior painting | $ 95,000 | $ 95,000 | $ 86,900 | |
2000 | Montgomery | 15.211.00 | Paint Branch High | Field renovation | $ 39,880 | $ 39,880 | $ 39,880 | ||
2000 | Montgomery | 15.212.00 | Parkland Middle | Floor tile and asbestos abatement | $ 15,000 | $ 15,000 | $ 12,598 | ||
2000 | Montgomery | 15.249.00 | Piney Branch Elementary | Flooring | Gym floor partial replacement | $ 32,000 | $ 32,000 | $ 27,899 | |
2000 | Montgomery | 15.066.00 | Poolesville High | Flooring | Replace carpet and floor tile | $ 15,000 | $ 15,000 | $ 12,711 | |
2000 | Montgomery | 15.252.00 | Stonegate Elementary | Exterior wall repairs | $ 15,000 | $ 15,000 | $ 14,930 | ||
2000 | Montgomery | 15.210.00 | Tilden Center | Painting | Paint exterior and partial interior | $ 40,000 | $ 40,000 | $ 15,024 | |
2000 | Montgomery | 15.211.00 | Paint Branch High | Generator Replacement | Replace emergency generator | $ 52,000 | $ 52,000 | $ 52,000 | |
2000 | Montgomery | 15.110.00 | Potomac Elementary | P.A. System Replacement | Replace PA system | $ 20,000 | $ 20,000 | $ 17,585 | |
2000 | Montgomery | 15.019.00 | Seneca Valley High | P.A. System Replacement | Replace PA system | $ 30,000 | $ 30,000 | $ 28,448 | |
2000 | Montgomery | 15.210.00 | Tilden Center | Bleacher Replacement | Replace interior bleachers | $ 65,000 | $ 65,000 | $ 58,848 | |
2000 | Montgomery | 15.210.00 | Tilden Center | Flooring | Re-finish gym floor | $ 20,000 | $ 20,000 | $ 15,393 | |
2000 | Montgomery | 15.126.00 | Wheaton Woods Elementary | Replace cooling tower and hot water heaters | $ 93,535 | $ 93,535 | $ 93,535 | ||
2000 | Montgomery | 15.224.00 | Mark Twain Spec. Ed. (Blair G. Ewing Center ) | Flooring | Replace gym floor | $ 60,000 | $ 60,000 | $ 35,818 | |
2000 | Prince George's | 16.197.00 | Andrew Jackson Middle | Steam Boiler Replacement | Replace two steam boilers | $ 298,216 | $ 298,216 | $ 298,216 | |
2000 | Prince George's | 16.018.00 | Paint Branch Elementary | Replace roofing system | $ 390,671 | $ 390,671 | $ 390,671 | ||
2000 | Prince George's | 16.087.00 | Suitland High | Fencing | Replace fence | $ 57,417 | $ 57,417 | $ 57,417 | |
2000 | Prince George's | 16.074.00 | Arrowhead Elementary | Boilers Replacement | Replace two boilers | $ 197,224 | $ 197,224 | $ 197,224 | |
2000 | St. Mary's | 18.002.00 | Spring Ridge Middle | Lighting | Site lighting | $ 45,255 | $ 45,255 | $ 45,255 | |
2000 | St. Mary's | 18.011.00 | Oakville Elementary | Lighting | Site lighting | $ 39,745 | $ 39,745 | $ 39,745 | |
2000 | Somerset | 19.002.00 | Washington High | Pave parking lot | $ 37,100 | $ 37,100 | $ 37,100 | ||
2000 | Somerset | 19.005.00 | Woodson Middle | Pave parking lot | $ 27,900 | $ 27,900 | $ 27,900 | ||
2000 | Talbot | 20.001.00 | St. Michaels Elementary | Campus site repair and improvement | $ 155,000 | $ 155,000 | $ 155,000 | ||
2000 | Washington | 21.014.00 | Greenbrier Elementary | Flooring | Carpet and tile replacement | $ 65,000 | $ 65,000 | $ 65,000 | |
2000 | Washington | 21.025.00 | Hancock Middle/High | Bleacher Replacement | Gymnasium bleacher replacement | $ 45,000 | $ 38,400 | $ 38,400 | |
2000 | Washington | 21.015.00 | Hancock Elementary | Fire Alarm Replacement | Replace fire alarm | $ 15,000 | $ 15,000 | $ 15,000 | |
2000 | Cecil | 07.013.00 | Perryville High | Carpet Replacement | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Washington | 21.008.00 | Smithsburg Middle | Flooring | Replace carpet and tile | $ 94,990 | $ 94,990 | $ 94,990 | |
2000 | Wicomico | 22.016.00 | Fruitland Primary | Telecom Upgrade | $ 50,000 | $ 50,000 | $ 50,000 | ||
2000 | Wicomico | 22.021.00 | Bennett Middle | Flooring | Refinish gym floor | $ 15,500 | $ 15,500 | $ 15,500 | |
2000 | Wicomico | 22.008.00 | James. M. Bennett High | Lighting | Replace gym lighting | $ 14,500 | $ 14,500 | $ 14,500 | |
2000 | Wicomico | 22.029.00 | West Salisbury Elementary | Expand parking area | $ 95,000 | $ 95,000 | $ 95,000 | ||
2000 | Wicomico | 22.019.00 | Pittsville Elementary/Middle | Expand existing parking areas | $ 95,000 | $ 95,000 | $ 95,000 | ||
2000 | Wicomico | 22.007.00 | Delmar Elementary | Replace pump sewer station | $ 43,037 | $ 43,037 | $ 43,037 | ||
2000 | Wicomico | 22.003.00 | East Salisbury Elementary | Sewer line replacement | $ 17,000 | $ 17,000 | $ 17,000 | ||
2000 | Wicomico | 22.018.00 | Mardela Middle/High | Telecom upgrade | Upgrade Telecom system | $ 60,000 | $ 60,000 | $ 60,000 | |
2000 | Worcester | 23.007.00 | Buckingham Elementary | Intercom System Replacement | Replace intercom system | $ 14,934 | $ 14,934 | $ 14,934 | |
2000 | Cecil | 07.021.00 | Kenmore Elementary | Carpet Replacement | $ 14,500 | $ 14,500 | $ 14,500 | ||
2000 | Worcester | 23.011.00 | Pocomoke Middle | Intercom System Replacement | Replace intercom system | $ 14,934 | $ 14,934 | $ 14,934 | |
2000 | Worcester | 23.012.00 | Berlin Intermediate | Pavement repairs | $ 35,132 | $ 35,132 | $ 35,132 | ||
2000 | Baltimore City | 30.259.00 | #024 Westside E. | Water Heater Installation | Install new water heater | $ 11,000 | $ 11,000 | $ 11,000 | |
2000 | Baltimore City | 30.137.00 | #049 Northeast Area M. | Flooring | Re-finish gym floors | $ 18,000 | $ 18,000 | $ 18,000 | |
2000 | Baltimore City | 30.029.00 | #053 Margaret Brent E. | Water Heater Replacement | Install new water heater | $ 11,100 | $ 11,100 | $ 11,100 | |
2000 | Baltimore City | 30.260.00 | #054 Barclay E./M. | Water Heater Installation | Install new water heater | $ 11,000 | $ 11,000 | $ 11,000 | |
2000 | Baltimore City | 30.261.00 | #060 Gwynns Falls E. | Lighting | Replace lighting in stairwells, hallways and lavatory | $ 15,000 | $ 15,000 | $ 15,000 | |
2000 | Baltimore City | 30.034.00 | #061 John Eager Howard E. | Lighting | Replace lighting in stairwells, hallways and lavatories | $ 16,000 | $ 16,000 | $ 16,000 | |
2000 | Baltimore City | 30.262.00 | #067 Edgewood E. | Water Heater Installation | Install new water heater | $ 11,000 | $ 11,000 | $ 11,000 | |
2000 | Baltimore City | 30.211.00 | #089 Rognel Heights E./M. | Flooring | Re-finish gym floors | $ 16,000 | $ 16,000 | $ 16,000 | |
2000 | Baltimore City | 30.247.00 | #101 Elmer A. Henderson E. | Painting | Paint cafeteria, classroom, and gym | $ 18,000 | $ 18,000 | $ 18,000 | |
2000 | Baltimore City | 30.203.00 | #122 Samuel Coleridge-Taylor E. | Painting | Paint hallways, restrooms, cafeteria and classrooms | $ 32,000 | $ 32,000 | $ 32,000 | |
2000 | Baltimore City | 30.064.00 | #134 Walter P. Carter E. | Water Heater Replacement | Install new water heater | $ 11,000 | $ 11,000 | $ 11,000 | |
2000 | Baltimore City | 30.252.00 | #144 James Mosher E. | Lighting | Replace lighting in stairwells, hallways and lavatories. | $ 16,000 | $ 16,000 | $ 16,000 | |
2000 | Baltimore City | 30.220.00 | #159 Cherry Hill E. | Lighting | Replace lighting in stairwells, hallways and lavatories. | $ 16,000 | $ 16,000 | $ 16,000 | |
2000 | Baltimore City | 30.230.00 | #160 Carter G. Woodson E. | Sidewalk, steps and walkways Replacement | Replace sidewalk, steps and walkways | $ 54,510 | $ 54,510 | $ 54,510 | |
2000 | Baltimore City | 30.230.00 | #160 Carter G. Woodson E. | Painting | Paint entire interior and exterior | $ 44,000 | $ 44,000 | $ 44,000 | |
2000 | Baltimore City | 30.228.00 | #181 Southside Academy | Flooring | Re-finish gym floor | $ 15,600 | $ 15,600 | $ 15,600 | |
2000 | Baltimore City | 30.228.00 | #181 Southside Academy | Sidewalk, steps and walkways Replacement | Replace walkways, steps and sidewalk | $ 42,000 | $ 42,000 | $ 42,000 | |
2000 | Baltimore City | 30.265.00 | #202 Lafayette E. | Water Heater Installation | Install new water heater | $ 11,000 | $ 11,000 | $ 11,000 | |
2000 | Baltimore City | 30.201.00 | #204 Mary Rodman E. | Lighting | Replace lighting in stairwells, hallways and lavatories. | $ 20,749 | $ 20,749 | $ 20,749 | |
2000 | Baltimore City | 30.205.00 | #219 Yorkwood E. | Lighting | Replace lighting stairwells, hallways and lavatories. | $ 16,000 | $ 16,000 | $ 16,000 | |
2000 | Baltimore City | 30.240.00 | #229 Holabird E. | Lighting | Replace lighting stairwells, hallways and lavatories | $ 13,000 | $ 13,000 | $ 13,000 | |
2000 | Baltimore City | 30.194.00 | #245 Leith Walk E. | Lighting | Replace lighting/stairwells, hallways and lavatories. | $ 12,000 | $ 12,000 | $ 12,000 | |
2000 | Baltimore City | 30.258.00 | #249 Medfield Heights E. | Painting | Paint interior/exterior | $ 44,000 | $ 44,000 | $ 44,000 | |
2000 | Baltimore City | 30.111.00 | #450 Frederick Douglass H. | Door Replacement | Replace exterior doors | $ 85,000 | $ 85,000 | $ 85,000 | |
2000 | Baltimore City | 30.180.00 | #400 Edmondson H. | Lighting | Replace lighting | $ 46,870 | $ 46,870 | $ 46,870 | |
2000 | Baltimore City | 30.267.00 | #011 Eutaw-Marshburn E. | Painting | Paint entire interior | $ 34,300 | $ 34,300 | $ 34,300 | |
2000 | Baltimore City | 30.234.00 | #016 Johnston Square E. | Painting | Paint auditorium, restrooms, stairs and hallways | $ 17,500 | $ 17,500 | $ 17,500 | |
2000 | Baltimore City | 30.241.00 | #040 Lake Clifton H. | Flooring | Re-finish gym floors | $ 48,600 | $ 48,600 | $ 48,600 | |
2000 | Baltimore City | 30.024.00 | #043 Highlandtown M. | Painting | Paint entire school interior | $ 159,000 | $ 159,000 | $ 159,000 | |
2000 | Baltimore City | 30.206.00 | #046 Chinquapin M. | Replace all toilet partitions | $ 28,500 | $ 28,500 | $ 28,500 | ||
2000 | Baltimore City | 30.206.00 | #046 Chinquapin M. | Door Replacement | Replace 31 interior and exterior doors | $ 76,335 | $ 76,335 | $ 76,335 | |
2000 | Baltimore City | 30.038.00 | #073 Sarah M. Roach E. | Painting | Paint entire interior of 1st and 2nd floors | $ 44,531 | $ 44,531 | $ 44,531 | |
2000 | Baltimore City | 30.040.00 | #079 William H. Lemmel M. | Lighting | Replace lighting in stairwells, hallways and lavatories. | $ 26,205 | $ 26,205 | $ 26,205 | |
2000 | Baltimore City | 30.237.00 | #080 West Baltimore M. | Flooring | Re-finish gym floor | $ 20,100 | $ 20,100 | $ 20,100 | |
2000 | Baltimore City | 30.263.00 | #082 Greenspring M. | Flooring | Re-finish gym floor | $ 31,670 | $ 31,670 | $ 31,670 | |
2000 | Baltimore City | 30.176.00 | #088 Lyndhurst E. | Painting | Paint locker rooms, bathrooms, and storage rooms | $ 14,150 | $ 14,150 | $ 14,150 | |
2000 | Baltimore City | 30.053.00 | #097 Collington Square E. | Door Replacement | Replace 24 exterior doors | $ 41,680 | $ 41,680 | $ 41,680 | |
2000 | Baltimore City | 30.264.00 | #170 Thurgood Marshall M. | Flooring | Re-finish gym floor | $ 26,970 | $ 26,970 | $ 26,970 | |
2000 | Baltimore City | 30.163.00 | #222 Pimlico M. | Lighting | Replace lighting stairwells, hallways and lavatories | $ 19,041 | $ 19,041 | $ 19,041 | |
2000 | Baltimore City | 30.163.00 | #223 Pimlico E. | Flooring | Re-finish gym floors, painting lines and walls | $ 28,200 | $ 28,200 | $ 28,200 | |
2000 | Baltimore City | 30.240.00 | #229 Holabird E. | Painting | Paint exterior/interior | $ 28,000 | $ 28,000 | $ 28,000 | |
2000 | Baltimore City | 30.229.00 | #242 Northwood E. | Painting | Paint interior of main building | $ 45,040 | $ 45,040 | $ 45,040 | |
2000 | Baltimore City | 30.180.00 | #400 Edmondson H. | Replace gymnasium folding partition | $ 44,000 | $ 44,000 | $ 44,000 | ||
2000 | Baltimore City | 30.167.00 | #406 Forest Park H. | Flooring | Re-finish gym floor, painting lines and walls | $ 23,300 | $ 23,300 | $ 23,300 | |
2000 | Baltimore City | 30.111.00 | #450 Frederick Douglass H. | Bleacher Replacement | Replace bleachers | $ 46,870 | $ 46,870 | $ 46,870 | |
2000 | Baltimore City | 30.129.00 | #028 William Pinderhughes E. | Flooring | Carpet replacement in rooms 102, 103, 105, 109 and main office. | $ 11,000 | $ 11,000 | $ 11,000 | |
2000 | Baltimore City | 30.127.00 | #063 Rosemont E. | Asphalt Paving | Asphalt paving of parking lot | $ 90,000 | $ 90,000 | $ 90,000 | |
2000 | Baltimore City | 30.061.00 | #125 Furman L. Templeton E. | Gym Renovation | Gym floor replacement and paint lines | $ 47,800 | $ 47,800 | $ 47,800 | |
2000 | Baltimore City | 30.155.00 | #314 Sharp Leadenhall E. | Flooring | Paint entire school interior and exterior | $ 50,000 | $ 50,000 | $ 50,000 | |
2000 | Baltimore City | 30.128.00 | #414 Paul Laurence Dunbar H. | Painting | Paint entire school interior and exterior | $ 95,000 | $ 95,000 | $ 95,000 | |
2000 | Baltimore City | 30.044.00 | #084 Thomas Johnson E. | Painting | Paint entire interior and exterior | $ 60,000 | $ 60,000 | $ 60,000 | |
2001 | Allegany | 01.027.01 | Center for Career and Technical Education | Parking lot enlargement | $ 117,152 | $ 117,152 | $ 117,152 | ||
2001 | Baltimore County | 03.151.01 | Colgate Elementary | Door Replacement | Partial interior door replacement | $ 37,934 | $ 37,934 | $ 37,934 | |
2001 | Baltimore County | 03.148.01 | Kenwood High | Flooring | Replace floor tile | $ 59,260 | $ 59,260 | $ 59,260 | |
2001 | Baltimore County | 03.149.01 | Lansdowne High | Structural foundation repairs | $ 81,270 | $ 81,270 | $ 81,270 | ||
2001 | Baltimore County | 03.021.01 | Maiden Choice Special Education | Health suite renovation | $ 135,948 | $ 135,948 | $ 135,948 | ||
2001 | Baltimore County | 03.128.01 | Catonsville High | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Baltimore County | 03.128.01 | Catonsville High | Bleacher Replacement | Gym bleacher replacement | $ 80,000 | $ 80,000 | $ 80,000 | |
2001 | Baltimore County | 03.098.01 | Milford Mill Academy | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Harford | 12.035.01 | Bel Air Middle | Asbestos abatement | Removal of partial asbestos abatement | $ 22,900 | $ 22,900 | $ 22,900 | |
2001 | Baltimore County | 03.098.01 | Milford Mill Academy | Bleacher Replacement | Gym bleacher replacement | $ 80,000 | $ 80,000 | $ 80,000 | |
2001 | Baltimore County | 03.033.01 | Pikesville High | Auditorium seating Replacement | $ 128,972 | $ 128,972 | $ 128,972 | ||
2001 | Baltimore County | 03.032.01 | Randallstown High | Fire Alarm System Replacement | $ 151,795 | $ 151,795 | $ 151,795 | ||
2001 | Baltimore County | 03.032.01 | Randallstown High | Bleacher Replacement | $ 80,000 | $ 80,000 | $ 80,000 | ||
2001 | Baltimore County | 03.094.01 | Hereford High | Lighting | $ 29,680 | $ 29,680 | $ 29,680 | ||
2001 | Baltimore County | 03.073.01 | Owings Mills High | Bleacher Replacement | $ 80,000 | $ 80,000 | $ 80,000 | ||
2001 | Baltimore County | 03.120.01 | Franklin High | Auditorium seating replacement | Replace Auditorium seating | $ 138,750 | $ 138,750 | $ 138,750 | |
2001 | Baltimore County | 03.095.01 | George Washington Carver Center for Arts & Technology | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Baltimore County | 03.133.01 | Dulaney High | Lighting | Auditorium/stage lighting | $ 216,400 | $ 216,400 | $ 216,400 | |
2001 | Baltimore County | 03.003.01 | Chesapeake High | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Baltimore County | 03.003.01 | Chesapeake High | Bleacher Replacement | $ 80,000 | $ 80,000 | $ 80,000 | ||
2001 | Baltimore County | 03.134.01 | Loch Raven High | Bleacher Replacement | Gym bleacher | $ 80,000 | $ 80,000 | $ 80,000 | |
2001 | Baltimore County | 03.134.01 | Loch Raven High | Locker Replacement | Gym locker (boys) | $ 56,800 | $ 56,800 | $ 56,800 | |
2001 | Baltimore County | 03.165.01 | Overlea High | Fire Alarm System Replacement | Replace fire alarm system | $ 167,530 | $ 167,530 | $ 167,530 | |
2001 | Baltimore County | 03.165.01 | Overlea High | Lighting | Auditorium/stage lighting | $ 225,000 | $ 225,000 | $ 225,000 | |
2001 | Baltimore County | 03.082.01 | Parkville Middle | Fire alarm system replacement | Replace Fire alarm system | $ 194,280 | $ 194,280 | $ 194,280 | |
2001 | Baltimore County | 03.140.01 | Dundalk High | Lighting | Gym lighting | $ 25,480 | $ 25,480 | $ 25,480 | |
2001 | Wicomico | 22.009.01 | Wicomico High | Sewer Replacement | $ 95,320 | $ 95,320 | $ 95,320 | ||
2001 | Harford | 12.004.01 | Bel Air High | Asbestos Abatement | Removal of partial asbestos abatement | $ 62,500 | $ 62,500 | $ 62,500 | |
2001 | Harford | 12.011.01 | Youth's Benefit Elementary | Fire alarm system replacement | $ 37,801 | $ 37,801 | $ 37,801 | ||
2001 | Baltimore County | 03.015.01 | Rosedale Alternative Center | Boiler Replacement | $ 350,000 | $ 350,000 | $ 350,000 | ||
2001 | Baltimore County | 03.075.01 | Eastern Technical High | Flooring | Replacement (aux.) gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Baltimore County | 03.075.01 | Eastern Technical High | Bleacher Replacement | Gym bleacher replacement | $ 80,000 | $ 80,000 | $ 80,000 | |
2001 | Baltimore County | 03.075.01 | Eastern Technical High | Locker Replacement | Gym locker (boys) replacement | $ 57,700 | $ 57,700 | $ 57,700 | |
2001 | Baltimore County | 03.075.01 | Eastern Technical High | Lighting | Auditorium stage lighting | $ 76,000 | $ 76,000 | $ 76,000 | |
2001 | Baltimore County | 03.075.01 | Eastern Technical High | Door Replacement | Exterior door replacement | $ 128,355 | $ 128,355 | $ 128,355 | |
2001 | Calvert | 04.011.01 | Beach Elementary | Open Space Enclosure | Enclose open space classroom areas, install doors, replace VCT. | $ 65,000 | $ 65,000 | $ 65,000 | |
2001 | Caroline | 05.001.01 | Greensboro Elementary | Roof | Re-roof penthouse | $ 14,875 | $ 14,875 | $ 14,875 | |
2001 | Caroline | 05.004.01 | Colonel Richardson High | Door Replacement | Replace exterior door with ADA compliant doors and door operators. | $ 14,600 | $ 14,600 | $ 14,600 | |
2001 | Caroline | 05.005.01 | Lockerman Middle | Intercom System Replacement | Replace the intercom system | $ 11,948 | $ 11,948 | $ 11,948 | |
2001 | Caroline | 05.003.01 | Denton Elementary | Replace the existing canopy | $ 14,800 | $ 14,800 | $ 14,800 | ||
2001 | Caroline | 05.005.01 | Lockerman Middle | Replace boiler mechanical parts | $ 14,830 | $ 14,830 | $ 14,830 | ||
2001 | Carroll | 06.042.01 | Westminster High | Door Replacement | Replace aluminum exterior door assemblies | $ 111,759 | $ 111,759 | $ 111,759 | |
2001 | Carroll | 06.032.01 | Carroll County Career and Technology Center | Door Replacement | Replace aluminum exterior door assemblies | $ 90,752 | $ 90,752 | $ 90,752 | |
2001 | Carroll | 06.001.01 | North Carroll High | Flooring | Replace main gymnasium floor | $ 117,838 | $ 117,838 | $ 117,838 | |
2001 | Carroll | 06.001.01 | North Carroll High | Gymnasium flooring | Refurbish auxiliary gymnasium floor | $ 44,000 | $ 44,000 | $ 44,000 | |
2001 | Charles | 08.003.01 | John Hanson Middle | Replace fixed seating in lecture halls | $ 14,974 | $ 14,974 | $ 14,974 | ||
2001 | Charles | 08.003.01 | John Hanson Middle | Carpet Replacement | Replace carpet | $ 10,648 | $ 10,648 | $ 10,648 | |
2001 | Charles | 08.004.01 | Dr. Gustavus Brown Elementary | Flooring | Replace gym floor | $ 10,000 | $ 10,000 | $ 10,000 | |
2001 | Charles | 08.002.01 | Benjamin Stoddert Middle | Flooring | Replace carpet with VCT | $ 29,378 | $ 29,378 | $ 29,378 | |
2001 | Dorchester | 09.009.01 | Cambridge-South Dorchester High | Lighting | Site lighting system renovation-Phase I | $ 65,000 | $ 65,000 | $ 65,000 | |
2001 | Garrett | 11.009.01 | Northern Middle | Water line Replacement | Replace water line | $ 38,675 | $ 38,675 | $ 38,675 | |
2001 | Garrett | 11.002.01 | Friendsville Elementary | Carpet and Tile Replacement | Replace carpet and tile | $ 46,325 | $ 46,325 | $ 46,325 | |
2001 | Harford | 12.001.01 | Fallston High | Carpet Replacement | Replace carpet | $ 165,577 | $ 165,577 | $ 165,577 | |
2001 | Harford | 12.001.01 | Fallston High | Replace septic drain fields | $ 79,900 | $ 79,900 | $ 79,900 | ||
2001 | Harford | 12.055.01 | Norrisville Elementary | Flooring | Remove/replace VCT in gym/cafeteria | $ 12,420 | $ 12,420 | $ 12,420 | |
2001 | Harford | 12.027.01 | Dublin Elementary | Emergency Generator Replacement | Replace emergency generator | $ 19,250 | $ 19,250 | $ 19,250 | |
2001 | Kent | 14.007.01 | Kent County High | Exterior door Replacement | Replacement exterior door (Phase I) | $ 65,000 | $ 65,000 | $ 65,000 | |
2001 | Montgomery | 15.241.01 | Hoover Middle | Painting | Interior and exterior painting | $ 50,000 | $ 50,000 | $ 38,835 | |
2001 | Montgomery | 15.064.01 | Col. E. Brooke Lee Middle | Painting | Interior and exterior painting | $ 50,000 | $ 50,000 | $ 42,500 | |
2001 | Montgomery | 15.019.01 | Seneca Valley High | Painting | Interior painting | $ 67,351 | $ 67,351 | $ 67,351 | |
2001 | Montgomery | 15.072.01 | Twinbrook Elementary | Painting | Interior painting | $ 45,000 | $ 45,000 | $ 17,165 | |
2001 | Montgomery | 15.035.01 | Broad Acres Elementary | Window and Door Replacement | Replace windows and exterior doors | $ 62,072 | $ 62,072 | $ 62,072 | |
2001 | Montgomery | 15.238.01 | Redland Middle | Plumbing Fixture Replacement | Plumbing fixture and piping replacements | $ 80,000 | $ 80,000 | $ 56,500 | |
2001 | Montgomery | 15.024.01 | Brown Station Elementary | Window and Door Replacement | Replace windows and exterior doors | $ 60,000 | $ 60,000 | $ 45,844 | |
2001 | Montgomery | 15.105.01 | DuFief Elementary | Door Replacement | Exterior door replacements | $ 62,901 | $ 62,901 | $ 62,901 | |
2001 | Montgomery | 15.037.01 | Eastern Middle | Window and Door Replacement | Replace windows and exterior doors | $ 93,719 | $ 93,719 | $ 93,719 | |
2001 | Montgomery | 15.255.01 | Lynnbrook Center | Window and Door Replacement | Replace window and exterior door | $ 70,000 | $ 70,000 | $ 69,576 | |
2001 | Montgomery | 15.035.01 | Broad Acres Elementary | Asbestos Abatement | Floor tile and asbestos abatement | $ 24,000 | $ 24,000 | $ 23,869 | |
2001 | Montgomery | 15.051.01 | Darnestown Elementary | Asbestos abatement | Floor tile and asbestos abatement | $ 34,000 | $ 34,000 | $ 33,803 | |
2001 | Montgomery | 15.251.01 | Farquhar Middle | Flooring | Gym wood floor refinishing | $ 13,000 | $ 13,000 | $ 11,006 | |
2001 | Montgomery | 15.138.01 | Rock Creek Forest Elementary | Flooring | Carpet and floor tile replacement | $ 25,000 | $ 25,000 | $ 12,992 | |
2001 | Montgomery | 15.086.01 | Southlake Elementary | Flooring | Carpet and floor tile replacement and asbestos abatement | $ 95,801 | $ 95,801 | $ 95,800 | |
2001 | Montgomery | 15.047.01 | Rock Terrace Special Education | Folding Partition Replacement | Replace folding wall partition in the gym | $ 65,000 | $ 65,000 | $ 58,846 | |
2001 | Montgomery | 15.136.01 | Neelsville Middle | P.A. System Replacement | Replace P.A. System | $ 30,000 | $ 30,000 | $ 23,185 | |
2001 | Montgomery | 15.042.01 | Ridgeview Middle | P.A. System Replacement | Replace P.A. system | $ 30,000 | $ 30,000 | $ 23,185 | |
2001 | Montgomery | 15.253.01 | Seven Locks Elementary | P.A. System Replacement | Replace P.A. system | $ 20,000 | $ 20,000 | $ 17,584 | |
2001 | Montgomery | 15.138.01 | Rock Creek Forest Elementary | Partition Replacement | Bathroom partition replacement | $ 20,000 | $ 20,000 | $ 13,007 | |
2001 | Montgomery | 15.141.01 | Wheaton High | HVAC | Re-insulate HVAC rooftop equipment | $ 97,000 | $ 97,000 | $ 86,335 | |
2001 | Montgomery | 15.105.01 | DuFief Elementary | Exterior Concrete Replacement | Replace exterior concrete | $ 20,307 | $ 20,307 | $ 20,307 | |
2001 | Montgomery | 15.108.01 | East Silver Spring Elementary | Carpet and Tile Replacement | $ 30,400 | $ 30,400 | $ 30,305 | ||
2001 | Montgomery | 15.218.01 | Strathmore Elementary | Carpet and Tile Replacement | $ 50,000 | $ 50,000 | $ 40,829 | ||
2001 | Queen Anne's | 17.004.01 | Centreville Middle | Rooftop unit Replacement | Replace rooftop unit over Pod C | $ 85,000 | $ 85,000 | $ 85,000 | |
2001 | St. Mary's | 18.016.01 | White Marsh Elementary | Lighting | Install parking lot security lights | $ 27,000 | $ 27,000 | $ 27,000 | |
2001 | St. Mary's | 18.006.01 | Ridge Elementary | Lighting | Install parking lot security lights | $ 41,448 | $ 41,448 | $ 41,448 | |
2001 | Somerset | 19.010.01 | Princess Anne Elementary | Parking Lot Repairs | Repave bus lanes and parking lot | $ 21,935 | $ 21,935 | $ 21,935 | |
2001 | Somerset | 19.007.01 | Deal Island Elementary | Parking Lot Repairs | Repave bus lanes and parking lot | $ 18,900 | $ 18,900 | $ 18,900 | |
2001 | Somerset | 19.003.01 | J. M. Tawes Vo-Tech | Parking Lot Repairs | Repave front bus lane and parking lot | $ 10,650 | $ 10,650 | $ 10,650 | |
2001 | Talbot | 20.008.01 | St. Michaels Middle/High | Construct a covered and fully enclosed connector " hallway" between the two buildings | $ 155,000 | $ 155,000 | $ 155,000 | ||
2001 | Washington | 21.008.01 | Smithsburg Middle | Carpet and Tile Replacement | Replace carpet and tile | $ 79,750 | $ 79,750 | $ 79,750 | |
2001 | Washington | 21.010.01 | Boonsboro Middle | Carpet and Tile Replacement | Replace carpet and tile | $ 70,000 | $ 70,000 | $ 70,000 | |
2001 | Washington | 21.003.01 | Western Heights Middle | Intercom and fire alarm Replacement | Replace intercom and fire alarm | $ 60,500 | $ 60,500 | $ 60,500 | |
2001 | Worcester | 23.012.01 | Berlin Intermediate | Pavement repairs | $ 28,879 | $ 28,879 | $ 28,879 | ||
2001 | Worcester | 23.009.01 | Snow Hill Middle | Flooring | Cafetorium floor replacement | $ 10,095 | $ 10,095 | $ 10,095 | |
2001 | Worcester | 23.011.01 | Pocomoke Middle | Gym floor replacement | Replace gym floor | $ 14,816 | $ 14,816 | $ 14,816 | |
2001 | Worcester | 23.012.01 | Berlin Intermediate | Mansard repair and repaint | $ 11,210 | $ 11,210 | $ 11,210 | ||
2001 | Baltimore City | 30.016.01 | #023 General Wolfe Elementary | Playground Resurfacing | Playground asphalt resurfacing | $ 21,850 | $ 21,850 | $ 21,850 | |
2001 | Baltimore City | 30.138.01 | #025 Dr. Rayner Browne E. | Door Replacement | Replace all exterior doors | $ 45,000 | $ 45,000 | $ 45,000 | |
2001 | Baltimore City | 30.138.01 | #025 Dr. Rayner Browne E. | Gymnasium Renovations | Renovate gymnasium | $ 13,000 | $ 13,000 | $ 13,000 | |
2001 | Baltimore City | 30.129.01 | #028 William Pinderhughes E. | Carpet Installation | Install carpet | $ 21,788 | $ 21,789 | $ 21,789 | |
2001 | Baltimore City | 30.129.01 | #028 William Pinderhughes E. | Lighting Upgrade | Upgrade lighting | $ 37,896 | $ 37,896 | $ 37,896 | |
2001 | Baltimore City | 30.019.01 | #036 Harford Heights Primary | VCT Installation | Install VCT | $ 41,900 | $ 41,900 | $ 41,900 | |
2001 | Baltimore City | 30.019.01 | #037 Harford Heights Intermediate | VCT Installation | Install VCT | $ 54,300 | $ 54,300 | $ 54,300 | |
2001 | Baltimore City | 30.024.01 | #043 Highlandtown M. | VCT Installation | Install VCT | $ 38,000 | $ 38,000 | $ 38,000 | |
2001 | Baltimore City | 30.206.01 | #046 Chinquapin M. | Gymnasium Renovation | Renovate gymnasium including stage | $ 22,000 | $ 22,000 | $ 22,000 | |
2001 | Baltimore City | 30.206.01 | #046 Chinquapin M. | Carpet Installation | Install carpet | $ 28,452 | $ 28,452 | $ 28,452 | |
2001 | Baltimore City | 30.127.01 | #063 Rosemont E. | Gymnasium Renovation | Renovate gymnasium | $ 16,851 | $ 16,851 | $ 16,851 | |
2001 | Baltimore City | 30.253.01 | #107 Gilmor Edison E. | Lighting replacement and ceiling installation | $ 115,000 | $ 115,000 | $ 115,000 | ||
2001 | Baltimore City | 30.253.01 | #107 Gilmor Edison E. | Window Replacement | Replace windows | $ 572,283 | $ 572,283 | $ 572,283 | |
2001 | Baltimore City | 30.061.01 | #125 Furman L. Templeton E. | ATC Renovation | $ 225,000 | $ 225,000 | $ 225,000 | ||
2001 | Baltimore City | 30.205.01 | #219 Yorkwood E. | Replace damaged sewer lines | $ 35,015 | $ 35,015 | $ 35,015 | ||
2001 | Baltimore City | 30.251.01 | #223 Pimlico E. | VCT Installation | Install VCT | $ 28,697 | $ 28,697 | $ 28,697 | |
2001 | Baltimore City | 30.148.01 | #241 Fallstaff M. | Door Replacement | Replace 17 exterior wooden doors | $ 61,000 | $ 61,000 | $ 61,000 | |
2001 | Baltimore City | 30.193.01 | #248 Sinclair Lane E. | Door Replacement | Replace 9 exterior doors. | $ 26,908 | $ 26,908 | $ 26,908 | |
2001 | Baltimore City | 30.207.01 | #412 Southwestern H. | Bleacher Replacement | Replace bleachers | $ 59,480 | $ 59,480 | $ 59,480 | |
2001 | Baltimore City | 30.207.01 | #412 Southwestern H. | Auditorium Seating Replacement | Replace auditorium seating | $ 108,000 | $ 108,000 | $ 108,000 | |
2001 | Baltimore City | 30.128.01 | #414 Paul Laurence Dunbar H. | Bleacher Replacement | Replace bleachers | $ 98,300 | $ 98,300 | $ 98,300 | |
2001 | Carroll | 06.027.01 | Carroll Springs Special Education | Replace water pipes | $ 40,000 | $ 40,000 | $ 40,000 | ||
2001 | Frederick | 10.001.01 | Middletown Elementary | Window replacement | Exterior window | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Frederick | 10.004.01 | Lincoln "B" Elementary | Window replacement | Exterior window | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Frederick | 10.009.01 | Frederick High | Window replacement | Exterior window | $ 20,000 | $ 20,000 | $ 20,000 | |
2001 | Anne Arundel | 02.002.01 | Old Mill High | Asphalt Replacement | $ 250,000 | $ 250,000 | $ 250,000 | ||
2001 | Anne Arundel | 02.111.01 | Phoenix Annapolis Special Education | Asphalt Replacement | $ 34,216 | $ 34,216 | $ 34,216 | ||
2001 | Anne Arundel | 02.068.01 | Southern High | Field Renovations | $ 97,663 | $ 97,663 | $ 97,663 | ||
2001 | Frederick | 10.034.01 | Monocacy Middle | Open space enclosure | $ 17,223 | $ 17,223 | $ 17,223 | ||
2001 | Montgomery | 15.141.01 | Wheaton High | P.A. System Replacement | $ 28,700 | $ 28,700 | $ 28,696 | ||
2001 | Montgomery | 15.108.01 | East Silver Spring Elementary | P.A. system Replacement | $ 18,300 | $ 18,300 | $ 18,284 | ||
2001 | Montgomery | 15.048.01 | Garrett Park Elementary | P.A. system Replacement | $ 18,300 | $ 18,300 | $ 18,284 | ||
2001 | Montgomery | 15.149.01 | Oak View Elementary | P.A. system Replacement | $ 18,300 | $ 18,300 | $ 18,284 | ||
2001 | Montgomery | 15.137.01 | Poolesville Elementary | P.A. system Replacement | $ 18,300 | $ 18,300 | $ 18,284 | ||
2001 | Anne Arundel | 02.004.01 | Van Bokkelen Elementary | Flooring | Carpet replacement | $ 50,043 | $ 50,043 | $ 50,043 | |
2001 | Anne Arundel | 02.117.01 | Central Elementary | Flooring | Carpet replacement | $ 98,485 | $ 98,485 | $ 98,485 | |
2001 | Cecil | 07.012.01 | North East Middle | Woodshop Renovation | Renovate 3,100sf (phase I) of old woodshop for administration | $ 355,000 | $ 355,000 | $ 355,000 | |
2001 | Wicomico | 22.005.01 | Beaver Run Elementary | P.A. System Replacement | $ 17,000 | $ 17,000 | $ 17,000 | ||
2001 | Howard | 13.032.01 | West Friendship Elementary | Door Replacement | $ 66,000 | $ 65,000 | $ 65,000 | ||
2001 | Baltimore County | 03.051.01 | Sparrows Point Middle/High | Auditorium seating and floor tile replacement | $ 162,700 | $ 162,700 | $ 162,700 | ||
2001 | Wicomico | 22.016.01 | Fruitland Primary | Carpet Replacement | In classroom | $ 13,949 | $ 13,949 | $ 13,949 | |
2001 | Wicomico | 22.007.01 | Delmar Elementary | Carpet Replacement | In classroom | $ 15,000 | $ 15,000 | $ 15,000 | |
2001 | St. Mary's | 18.014.01 | Mechanicsville Elementary | Parking lot repaving | $ 27,700 | $ 18,100 | $ 18,100 | ||
2001 | Prince George's | 16.215.01 | Benjamin Foulois Elementary | Boiler Replacement | Replace steam boilers | $ 274,530 | $ 274,530 | $ 274,530 | |
2001 | Caroline | 05.004.01 | Colonel Richardson High | Planetarium re-roofing and wall re-coating | $ 13,097 | $ 13,097 | $ 13,097 | ||
2001 | Prince George's | 16.156.01 | Thurgood Marshall Middle | Boilers Replacement | Replace steam boilers | $ 316,384 | $ 316,384 | $ 316,384 | |
2001 | Prince George's | 16.185.01 | Benjamin Tasker Middle | Chiller Replacement | Replace chiller | $ 161,428 | $ 161,428 | $ 161,428 | |
2001 | Prince George's | 16.236.01 | John E. Howard Elementary | Chiller Replacement | Replace chiller | $ 139,330 | $ 139,330 | $ 139,330 | |
2001 | Prince George's | 16.082.01 | Oxon Hill High | Chiller Replacement | Replace chiller | $ 78,328 | $ 78,328 | $ 78,328 | |
2001 | Allegany | 01.003.01 | Bel Air Elementary | Chiller Replacement | Replace chiller | $ 94,000 | $ 94,000 | $ 94,000 | |
2001 | Wicomico | 22.002.01 | Pinehurst Elementary | P.A. System Replacement | $ 66,000 | $ 66,000 | $ 66,000 | ||
2001 | Wicomico | 22.001.01 | Parkside High | Upgrade gym light and replace divider curtain | $ 35,000 | $ 30,000 | $ 30,000 | ||
2001 | Wicomico | 22.015.01 | Wicomico Middle | Replace parking loop lights and upgrade heads | $ 25,000 | $ 25,000 | $ 25,000 | ||
2001 | Wicomico | 22.007.01 | Delmar Elementary | Flooring | Replace Cafetorium wood floor | $ 16,000 | $ 16,000 | $ 16,000 | |
2001 | Montgomery | 15.238.01 | Redland Middle | P.A system Replacement | $ 22,000 | $ 22,000 | $ 20,652 | ||
2001 | Anne Arundel | 02.073.01 | Glen Burnie Park Elementary | Flooring | Carpet replacement | $ 34,000 | $ 34,000 | $ 34,000 | |
2001 | Somerset | 19.004.01 | Crisfield High | Paving | $ 13,515 | $ 13,515 | $ 13,515 | ||
2001 | Anne Arundel | 02.114.01 | Southgate Elementary | Flooring | Carpet replacement | $ 14,000 | $ 14,000 | $ 14,000 | |
2001 | Allegany | 01.013.01 | Eckhart Alternative | Fire alarm replacement | $ 21,000 | $ 21,000 | $ 21,000 | ||
2001 | Allegany | 01.017.01 | West Side Elementary | Office/classroom renovations | Wall construction using metal studs and fire shields drywall. | $ 14,750 | $ 14,750 | $ 14,750 | |
2001 | Allegany | 01.017.01 | West Side Elementary | Office/classroom renovation | Install new duct work, control wiring, diffusers, out air intake installed | $ 14,900 | $ 14,900 | $ 14,900 | |
2001 | Allegany | 01.017.01 | West Side Elementary | Office/classroom renovation | Doors, frames, and hardware installation | $ 14,500 | $ 14,500 | $ 14,500 | |
2001 | Allegany | 01.011.01 | Fort Hill High | Track resurfacing | $ 91,000 | $ 79,600 | $ 79,600 | ||
2001 | Wicomico | 22.015.01 | Wicomico Middle | Painting | Exterior painting | $ 15,000 | $ 15,000 | $ 15,000 | |
2001 | Wicomico | 22.005.01 | Beaver Run Elementary | Flooring | Replace floor | $ 14,500 | $ 14,500 | $ 14,500 | |
2001 | Wicomico | 22.010.01 | Glen Avenue Elementary | Telecom replacement | $ 48,000 | $ 45,719 | $ 45,719 | ||
2001 | Wicomico | 22.015.01 | Wicomico Middle | Flooring | $ 15,000 | $ 15,000 | $ 15,000 | ||
2002 | Montgomery | 15.137.02 | Poolesville Elementary | Folding partition Replacement | $ 22,166 | $ 22,166 | $ 22,166 | ||
2002 | Montgomery | 15.066.02 | Poolesville High | Floor and Asbestos abatement | Floor covering replacement and asbestos abatement | $ 27,316 | $ 27,316 | $ 27,316 | |
2002 | Montgomery | 15.081.02 | Takoma Park Elementary | Floor and Asbestos abatement | Floor covering replacement and asbestos abatement | $ 75,955 | $ 75,955 | $ 75,955 | |
2002 | Montgomery | 15.105.02 | DuFief Elementary | Parking lots Replacement | Asphalt - resurface parking lots | $ 51,771 | $ 51,771 | $ 51,771 | |
2002 | Montgomery | 15.255.02 | Lynnbrook Center | Window and Door Replacement | Replace exterior window and door | $ 52,767 | $ 52,767 | $ 52,767 | |
2002 | Kent | 14.007.02 | Kent County High | Door Replacement | Replace exterior door | $ 65,000 | $ 65,000 | $ 65,000 | |
2002 | Talbot | 20.008.02 | St. Michaels Middle/High | Renovation of track and contiguous access walks, security fencing and play field. | $ 145,047 | $ 145,047 | $ 145,047 | ||
2002 | Frederick | 10.001.02 | Middletown Elementary | Window replacement | $ 15,000 | $ 15,000 | $ 15,000 | ||
2002 | Prince George's | 16.200.02 | Seabrook Elementary | Boiler and Fuel Tank Replacement | Replace 1 Steam boiler, 2 fuel tanks | $ 284,873 | $ 284,873 | $ 284,873 | |
2002 | Prince George's | 16.080.02 | Hyattsville Elementary | Boiler and Fuel Tank Replacement | Replace 2 Steam boilers, 1 fuel tank | $ 247,030 | $ 247,030 | $ 247,030 | |
2002 | Prince George's | 16.183.02 | William Wirt Middle | Boiler and Fuel Tank Replacement | Replace 3 Steam boilers, 1 fuel tank | $ 278,930 | $ 278,930 | $ 278,930 | |
2002 | Prince George's | 16.199.02 | William Schmidt Center | Boiler and Fuel Tank Replacement | Replace 1 Steam boiler, 1 fuel tank | $ 140,650 | $ 140,650 | $ 140,650 | |
2002 | Garrett | 11.008.02 | Southern Middle | Flooring | Gym floor replacement | $ 59,425 | $ 59,425 | $ 59,425 | |
2002 | Garrett | 11.013.02 | Accident Elementary | Carpet Replacement | $ 11,189 | $ 11,189 | $ 11,189 | ||
2002 | Washington | 21.010.02 | Boonsboro Middle | Flooring | Carpet/tile replacement | $ 61,900 | $ 61,900 | $ 61,900 | |
2002 | Washington | 21.044.02 | Potomac Heights Elementary | Flooring | Carpet/tile replacement | $ 45,900 | $ 45,900 | $ 45,900 | |
2002 | Caroline | 05.004.02 | Colonel Richardson High | Refurbishment of waste water treatment plant | $ 68,824 | $ 68,824 | $ 68,824 | ||
2002 | Carroll | 06.032.02 | Carroll County Career and Technology Center | Cooling Tower Replacement | $ 11,990 | $ 11,990 | $ 11,990 | ||
2002 | Carroll | 06.015.02 | Freedom Elementary | HVAC Replacement | Replacement of HVAC rooftop unit | $ 83,812 | $ 83,812 | $ 83,812 | |
2002 | Carroll | 06.036.02 | Westminster West Middle | Building controls Upgrade | Upgrade of building controls. Installation of Energy Management System. | $ 47,417 | $ 47,417 | $ 47,417 | |
2002 | Carroll | 06.042.02 | Westminster High | Repointing of exterior face brick | $ 82,129 | $ 82,129 | $ 82,129 | ||
2002 | Carroll | 06.018.02 | Robert Moton Elementary | Repointing of exterior face brick | $ 14,950 | $ 14,950 | $ 14,950 | ||
2002 | Charles | 08.009.02 | Maurice J. McDonough High | Wall Replacement | Replace wall with gym curtain | $ 14,985 | $ 14,985 | $ 14,985 | |
2002 | Charles | 08.009.02 | Maurice J. McDonough High | Lighting Replacement | Replace gym lighting | $ 20,153 | $ 20,153 | $ 20,153 | |
2002 | Charles | 08.003.02 | John Hanson Middle | Carpet Replacement | Replace band/choral room carpet | $ 10,000 | $ 11,083 | $ 11,083 | |
2002 | Charles | 08.019.02 | Eva Turner Elementary | Flooring | Install VCT on gym/cafeteria floor | $ 13,791 | $ 13,791 | $ 13,791 | |
2002 | Allegany | 01.035.02 | Braddock Middle | Fire Alarm Replacement | $ 65,000 | $ 65,000 | $ 65,000 | ||
2002 | Allegany | 01.022.02 | Cash Valley Elementary | AHU and Boiler Replacement | $ 90,000 | $ 90,000 | $ 90,000 | ||
2002 | Allegany | 01.013.02 | Eckhart Alternative | AHU Replacement | $ 150,000 | $ 150,000 | $ 150,000 | ||
2002 | Allegany | 01.002.02 | Beall Elementary | Electrical distribution panel Replacement | $ 49,950 | $ 49,950 | $ 49,950 | ||
2002 | Baltimore City | 30.202.02 | #008 City Springs E. | Gym Renovations | Including lighting, refurbishing the floor and painting. | $ 19,955 | $ 19,955 | $ 19,955 | |
2002 | Baltimore City | 30.202.02 | #008 City Springs E. | Door and frame Replacement | $ 47,799 | $ 47,799 | $ 47,799 | ||
2002 | Baltimore City | 30.202.02 | #008 City Springs E. | Painting | Paint the interior/exterior | $ 37,650 | $ 37,650 | $ 37,650 | |
2002 | Baltimore City | 30.234.02 | #016 Johnston Square E. | Painting | Paint the annex building | $ 37,950 | $ 37,950 | $ 37,950 | |
2002 | Baltimore City | 30.020.02 | #039 Dallas F. Nicholas E. | Gym Renovation | Refurbishing floor, painting | $ 12,551 | $ 12,551 | $ 12,551 | |
2002 | Calvert | 04.010.02 | Huntingtown Elementary | Reconfiguration of classroom spaces | $ 50,000 | $ 50,000 | $ 50,000 | ||
2002 | Carroll | 06.030.02 | Mt. Airy Elementary | Energy management system installation | $ 38,290 | $ 38,290 | $ 38,290 | ||
2002 | Baltimore City | 30.223.02 | #057 Lombard M. | Gym Renovation | Renovate gym, including refurbishing floor, painting, replace bleachers, lighting. | $ 51,323 | $ 51,323 | $ 51,323 | |
2002 | Baltimore City | 30.223.02 | #057 Lombard M. | Painting | Paint interior/exterior | $ 86,000 | $ 86,000 | $ 86,000 | |
2002 | Baltimore City | 30.223.02 | #057 Lombard M. | Lighting Fixture Upgrade | Replace lighting fixtures in hallways, stairways, restrooms. | $ 57,096 | $ 57,096 | $ 57,096 | |
2002 | Baltimore City | 30.223.02 | #057 Lombard M. | Ceiling Tiles Replacement | Replace acoustical ceiling tiles in hallways, stairways, restrooms. | $ 14,292 | $ 14,292 | $ 14,292 | |
2002 | Baltimore City | 30.223.02 | #057 Lombard M. | Fire Protection System | $ 250,650 | $ 250,650 | $ 250,650 | ||
2002 | Baltimore City | 30.223.02 | #057 Lombard M. | Doors and frames Replacement | Replace doors/frames, spandrels | $ 49,400 | $ 49,400 | $ 49,400 | |
2002 | Baltimore City | 30.261.02 | #060 Gwynns Falls E. | Gym Renovation | Refurbishing floor, painting | $ 14,800 | $ 14,800 | $ 14,800 | |
2002 | Baltimore City | 30.199.02 | #062 Edgecombe Circle E. | Painting | Paint interior/exterior | $ 49,000 | $ 49,000 | $ 49,000 | |
2002 | Baltimore City | 30.247.02 | #101 Elmer A. Henderson E. | Door and frame Replacement | Exterior doors and frames | $ 89,815 | $ 89,815 | $ 89,815 | |
2002 | Carroll | 06.004.02 | Westminster East Middle | Energy management system installation | $ 48,103 | $ 48,103 | $ 48,103 | ||
2002 | Baltimore City | 30.275.02 | #102 Thomas G. Hayes E. | Door and frame Replacement | Exterior | $ 29,938 | $ 29,938 | $ 29,938 | |
2002 | Baltimore City | 30.275.02 | #102 Thomas G. Hayes E. | HVAC | Replace HVAC steam line | $ 78,971 | $ 78,971 | $ 78,971 | |
2002 | Baltimore City | 30.175.02 | #124 Baybrook E. | Painting | Paint interior/exterior | $ 24,985 | $ 24,985 | $ 24,985 | |
2002 | Baltimore City | 30.175.02 | #124 Baybrook E. | VCT Replacement | $ 16,594 | $ 16,594 | $ 16,594 | ||
2002 | Baltimore City | 30.251.02 | #223 Pimlico E. | Painting | Interior/exterior | $ 69,500 | $ 69,500 | $ 69,500 | |
2002 | Baltimore City | 30.251.02 | #223 Pimlico E. | VCT Replacement | $ 17,158 | $ 17,158 | $ 17,158 | ||
2002 | Baltimore City | 30.193.02 | #248 Sinclair Lane E. | HVAC | Replace HVAC gas line | $ 28,741 | $ 28,741 | $ 28,741 | |
2002 | Baltimore City | 30.204.02 | #250 Dr. Bernard Harris E. | Painting | 2nd floor | $ 72,530 | $ 72,530 | $ 72,530 | |
2002 | Baltimore City | 30.204.02 | #250 Dr. Bernard Harris E. | Gym Renovation | Refurbishing floor, painting | $ 14,800 | $ 14,800 | $ 14,800 | |
2002 | Baltimore City | 30.204.02 | #250 Dr. Bernard Harris E. | VCT Replacement | $ 28,364 | $ 28,364 | $ 28,364 | ||
2002 | Baltimore City | 30.204.02 | #250 Dr. Bernard Harris E. | Boiler Burner replacement | $ 47,898 | $ 47,898 | $ 47,898 | ||
2002 | Baltimore City | 30.244.02 | #254 Dr. Martin Luther King Jr. E. | Painting | Paint interior/exterior | $ 78,000 | $ 78,000 | $ 78,000 | |
2002 | Baltimore City | 30.244.02 | #254 Dr. Martin Luther King Jr. E. | VCT Replacement | $ 19,262 | $ 19,262 | $ 19,262 | ||
2002 | Baltimore City | 30.244.02 | #254 Dr. Martin Luther King Jr. E. | Carpet Replacement | Replace carpet in the library, auditorium, main office, conference room and principal's office. | $ 18,389 | $ 18,389 | $ 18,389 | |
2002 | Carroll | 06.019.02 | Liberty High | Emergency Generator Replacement | Replacement of emergency generator and associated | $ 46,225 | $ 46,225 | $ 46,225 | |
2002 | Howard | 13.032.02 | West Friendship Elementary | Door frame Replacement | $ 61,000 | $ 61,000 | $ 61,000 | ||
2002 | Montgomery | 15.206.02 | Bel Pre Elementary | Painting | Interior and exterior painting | $ 19,250 | $ 19,250 | $ 19,250 | |
2002 | Montgomery | 15.105.02 | DuFief Elementary | Painting | Interior painting | $ 22,351 | $ 22,351 | $ 22,351 | |
2002 | Montgomery | 15.043.02 | Lake Seneca Elementary | Painting | Interior | $ 17,514 | $ 17,514 | $ 17,514 | |
2002 | Montgomery | 15.066.02 | Poolesville High | Painting | Exterior | $ 18,500 | $ 18,500 | $ 18,500 | |
2002 | Somerset | 19.010.02 | Princess Anne Elementary | Additional parking area construction | $ 22,150 | $ 22,150 | $ 22,150 | ||
2002 | Somerset | 19.004.02 | Crisfield High | Student parking lot construction | $ 42,850 | $ 42,850 | $ 42,850 | ||
2002 | Frederick | 10.004.02 | Lincoln "B" Elementary | Window replacement | $ 20,000 | $ 20,000 | $ 20,000 | ||
2002 | Montgomery | 15.231.02 | Argyle Middle | Window and door Replacement | Replace exterior window and door | $ 87,306 | $ 87,306 | $ 87,306 | |
2002 | Montgomery | 15.107.02 | Sherwood Elementary | PA system Replacement | $ 21,748 | $ 21,748 | $ 21,748 | ||
2002 | Montgomery | 15.081.02 | Takoma Park Elementary | PA system Replacement | Replace PA system | $ 23,444 | $ 23,444 | $ 23,444 | |
2002 | Montgomery | 15.022.02 | Benjamin Banneker Middle | Bleachers Replacement | Replace interior bleachers | $ 36,300 | $ 36,300 | $ 36,300 | |
2002 | Montgomery | 15.066.02 | Poolesville High | Lockers and Bencher Replacement | $ 59,828 | $ 59,828 | $ 59,828 | ||
2002 | Montgomery | 15.100.02 | Fox Chapel Elementary | Plumbing/Piping Fixture Replacement | Replace plumbing fixture and piping | $ 49,382 | $ 49,382 | $ 49,382 | |
2002 | Montgomery | 15.137.02 | Poolesville Elementary | Plumbing/Piping Fixture Replacement | Plumbing fixture and piping replacements | $ 42,972 | $ 42,972 | $ 42,972 | |
2002 | Montgomery | 15.007.02 | Cold Spring Elementary | Window and Door Replacement | Replace exterior window and doors | $ 38,948 | $ 38,948 | $ 38,948 | |
2002 | Montgomery | 15.143.02 | Woodfield Elementary | Window and Door Replacement | Replace exterior window and doors | $ 84,486 | $ 84,486 | $ 84,486 | |
2002 | Dorchester | 09.013.02 | North Dorchester High | Lighting Replacement | Site lighting replacement | $ 64,885 | $ 64,885 | $ 64,885 | |
2002 | Washington | 21.003.02 | Western Heights Middle | Flooring | New gym floor. | $ 61,161 | $ 61,161 | $ 61,161 | |
2002 | Harford | 12.002.02 | Magnolia Elementary | Ceiling Tile Replacement | Metal pan ceiling tile replacement | $ 244,750 | $ 244,750 | $ 244,750 | |
2002 | Harford | 12.027.02 | Dublin Elementary | Electrical switchgear Replacement | $ 13,650 | $ 13,650 | $ 13,650 | ||
2002 | Cecil | 07.012.02 | North East Middle | Administration Area | Renovate 7,900 sf of administration area | $ 354,696 | $ 354,696 | $ 354,696 | |
2002 | Caroline | 05.004.02 | Colonel Richardson High | Re-roofing of canopy | $ 12,500 | $ 12,500 | $ 12,500 | ||
2002 | Worcester | 23.008.02 | Snow Hill Elementary | P.A. system replacement | $ 12,725 | $ 12,725 | $ 12,725 | ||
2002 | Worcester | 23.008.02 | Snow Hill Elementary | Flooring | Cafetorium floor replacement | $ 14,900 | $ 14,900 | $ 14,900 | |
2002 | Worcester | 23.002.02 | Pocomoke Elementary | Electric curtain walls repair | $ 11,434 | $ 11,434 | $ 11,434 | ||
2002 | Baltimore County | 03.045.02 | Ridgely Middle | Lighting | Replace exterior lighting | $ 68,300 | $ 68,300 | $ 68,300 | |
2002 | Baltimore County | 03.113.02 | Deep Creek Middle | Fire alarm system replacement | $ 95,325 | $ 95,325 | $ 95,325 | ||
2002 | Baltimore County | 03.113.02 | Deep Creek Middle | Interior door replacement | $ 123,000 | $ 123,000 | $ 123,000 | ||
2002 | Baltimore County | 03.113.02 | Deep Creek Middle | Corridor ceiling replacement | $ 42,025 | $ 42,025 | $ 42,025 | ||
2002 | Baltimore County | 03.034.02 | Sandalwood Elementary | Door frame replacement | Exterior door frame | $ 93,950 | $ 93,950 | $ 93,950 | |
2002 | Baltimore County | 03.082.02 | Parkville Middle | Auditorium/stage lighting replacement | $ 193,131 | $ 193,131 | $ 193,131 | ||
2002 | Baltimore County | 03.165.02 | Overlea High | Retaining wall/electrical service replacement | $ 188,000 | $ 188,000 | $ 188,000 | ||
2002 | Baltimore County | 03.134.02 | Loch Raven High | Elevator system replacement | $ 162,019 | $ 162,019 | $ 162,019 | ||
2002 | Baltimore County | 03.145.02 | Patapsco High | Flooring | Structural floor repairs | $ 77,480 | $ 77,480 | $ 77,480 | |
2002 | Baltimore County | 03.140.02 | Dundalk High | Fire alarm system replacement | $ 186,375 | $ 186,375 | $ 186,375 | ||
2002 | Baltimore County | 03.041.02 | Dundalk Middle | Cafeteria window wall repairs | $ 62,070 | $ 62,070 | $ 62,070 | ||
2002 | Worcester | 23.005.02 | Snow Hill High | Replace exterior vinyl siding and doors | $ 13,716 | $ 13,716 | $ 13,716 | ||
2002 | Frederick | 10.030.02 | New Market Elementary | Window replacement | $ 15,000 | $ 15,000 | $ 15,000 | ||
2002 | Frederick | 10.009.02 | Frederick High | Window replacement | $ 10,000 | $ 10,000 | $ 10,000 | ||
2002 | Wicomico | 22.009.02 | Wicomico High | Chiller Replacement | Replace the auditorium chiller | $ 93,970 | $ 93,970 | $ 93,970 | |
2002 | Wicomico | 22.015.02 | Wicomico Middle | Window replacement | Replace gym windows | $ 99,321 | $ 99,321 | $ 99,321 | |
2002 | St. Mary's | 18.002.02 | Spring Ridge Middle | ADA fire alarm upgrade | $ 15,800 | $ 15,800 | $ 15,800 | ||
2002 | Worcester | 23.003.02 | Pocomoke High | Vinyl siding Replacement | Exterior | $ 12,225 | $ 12,225 | $ 12,225 | |
2002 | Garrett | 11.004.02 | Grantsville Elementary | Flooring | Replace carpet | $ 13,590 | $ 13,590 | $ 13,590 | |
2002 | Montgomery | 15.209.02 | Cabin John Middle | Flooring | $ 10,500 | $ 10,500 | $ 10,500 | ||
2002 | Montgomery | 15.236.02 | North Lake Center | Concrete sidewalk replacement | $ 10,636 | $ 10,636 | $ 10,636 | ||
2002 | Montgomery | 15.211.02 | Paint Branch High | Flooring | Refinish gym wooden floor | $ 18,840 | $ 18,840 | $ 18,840 | |
2002 | Montgomery | 15.081.02 | Takoma Park Elementary | Parking lot asphalt resurfacing | $ 32,066 | $ 32,066 | $ 32,066 | ||
2002 | Montgomery | 15.081.02 | Takoma Park Elementary | Fence replacement | $ 21,748 | $ 21,748 | $ 21,748 | ||
2002 | Wicomico | 22.009.02 | Wicomico High | RTU replacement | $ 69,262 | $ 69,262 | $ 69,262 | ||
2002 | Frederick | 10.060.02 | Lewistown Elementary | Flooring | Flooring replacement | $ 25,000 | $ 25,000 | $ 25,000 | |
2002 | Montgomery | 15.081.02 | Takoma Park Elementary | Exterior windows and doors Replacement | Replace exterior windows and doors | $ 79,547 | $ 79,547 | $ 79,547 | |
2002 | Montgomery | 15.011.02 | Woodlin Elementary | Parking lot asphalt resurfacing | $ 60,954 | $ 60,954 | $ 60,954 | ||
2002 | Montgomery | 15.011.02 | Woodlin Elementary | Concrete sidewalk replacement | $ 10,036 | $ 10,036 | $ 10,036 | ||
2002 | Montgomery | 15.011.02 | Woodlin Elementary | Fence Replacement | $ 11,115 | $ 11,115 | $ 11,115 | ||
2002 | St. Mary's | 18.002.02 | Spring Ridge Middle | Sidewalk installation/replacement | $ 34,125 | $ 34,125 | $ 34,125 | ||
2002 | Anne Arundel | 02.005.02 | Severna Park High | Flooring | Replace carpet and associated asbestos abatement | $ 74,137 | $ 74,137 | $ 74,137 | |
2002 | Anne Arundel | 02.002.02 | Old Mill High | Flooring | Replace carpet in auditorium | $ 23,010 | $ 23,010 | $ 23,010 | |
2002 | Anne Arundel | 02.074.02 | Manor View Elementary | Flooring | Replace carpet and associated asbestos abatement | $ 102,618 | $ 102,618 | $ 102,618 | |
2002 | Anne Arundel | 02.107.02 | Oak Hill Elementary | Flooring | Replace carpet and associated asbestos abatement | $ 104,328 | $ 104,328 | $ 104,328 | |
2002 | Anne Arundel | 02.073.02 | Glen Burnie Park Elementary | Flooring | Replace carpet and associated asbestos abatement | $ 75,593 | $ 75,593 | $ 75,593 | |
2002 | Anne Arundel | 02.062.02 | Bodkin Elementary | Flooring | Replace carpet | $ 107,569 | $ 107,569 | $ 107,569 | |
2002 | Baltimore County | 03.194.02 | Catonsville Center for Alternative Studies | Fire escape replacement | $ 105,651 | $ 105,651 | $ 105,651 | ||
2002 | Baltimore County | 03.176.02 | Southwestern Academy | Fire alarm system replacement | $ 161,065 | $ 161,065 | $ 161,065 | ||
2002 | Baltimore County | 03.088.02 | Catonsville Middle | Fire alarm system replacement | $ 118,076 | $ 118,076 | $ 118,076 | ||
2002 | Baltimore County | 03.098.02 | Milford Mill Academy | Hall/gym locker replacement | $ 229,144 | $ 229,144 | $ 229,144 | ||
2002 | Baltimore County | 03.050.02 | Woodlawn High | Fire alarm system replacement | $ 259,263 | $ 259,263 | $ 259,263 | ||
2002 | Baltimore County | 03.120.02 | Franklin High | Auditorium/stage floor replacement | $ 39,650 | $ 39,650 | $ 39,650 | ||
2002 | Baltimore County | 03.073.02 | Owings Mills High | Fire alarm system replacement | $ 208,318 | $ 208,318 | $ 208,318 | ||
2002 | Baltimore County | 03.094.02 | Hereford High | Gym bleacher replacement | $ 79,000 | $ 79,000 | $ 79,000 | ||
2002 | Baltimore County | 03.049.02 | Dumbarton Middle | Lighting | Replace auditorium/stage lighting | $ 184,548 | $ 184,548 | $ 184,548 | |
2002 | Wicomico | 22.024.02 | Westside Primary | Storefront replacements | $ 11,149 | $ 11,149 | $ 11,149 | ||
2002 | Wicomico | 22.016.02 | Fruitland Primary | Gym window replacement | $ 22,710 | $ 22,710 | $ 22,710 | ||
2002 | Wicomico | 22.018.02 | Mardela Middle/High | HVAC/RTU replacement | $ 16,200 | $ 16,200 | $ 16,200 | ||
2002 | Wicomico | 22.009.02 | Wicomico High | Roof repairs and refurbishment | $ 17,638 | $ 17,638 | $ 17,638 | ||
2002 | Wicomico | 22.005.02 | Beaver Run Elementary | Fire alarm replacement | $ 14,650 | $ 14,650 | $ 14,650 | ||
2002 | Wicomico | 22.021.02 | Bennett Middle | Fire alarm replacement | $ 10,100 | $ 10,100 | $ 10,100 | ||
2002 | Baltimore City | 30.020.02 | #039 Dallas F. Nicholas E. | Burner Replacement | $ 18,000 | $ 18,000 | $ 18,000 | ||
2002 | Baltimore City | 30.021.02 | #041 Hamilton M. | VCT installation | $ 94,402 | $ 94,402 | $ 94,402 | ||
2002 | Baltimore City | 30.028.02 | #051 Waverly E. | Lighting | Upgrade hallway lighting | $ 15,400 | $ 15,400 | $ 15,400 | |
2002 | Baltimore City | 30.274.02 | #078 Harlem Park M. | Boiler Repair | Retube boilers | $ 24,831 | $ 24,831 | $ 24,831 | |
2002 | Baltimore City | 30.270.02 | #085 Fort Worthington E. | Painting | Interior and exterior | $ 36,950 | $ 36,950 | $ 36,950 | |
2002 | Baltimore City | 30.244.02 | #254 Dr. Martin Luther King Jr. E. | Install hot water heater | $ 19,658 | $ 19,658 | $ 19,658 | ||
2002 | Baltimore City | 30.162.02 | #260 Frederick E. | Paining | Interior walls | $ 38,950 | $ 38,950 | $ 38,950 | |
2002 | Baltimore City | 30.187.02 | #401 Northwestern H. | Boiler Repair | Replace burner and mud drum on boiler | $ 23,241 | $ 23,241 | $ 23,241 | |
2002 | St. Mary's | 18.001.02 | Leonardtown Middle | ADA fire alarm upgrade | $ 13,274 | $ 13,274 | $ 13,274 | ||
2002 | St. Mary's | 18.023.02 | Greenview Knolls Elementary | ADA fire alarm upgrade | $ 11,800 | $ 11,800 | $ 11,800 | ||
2002 | St. Mary's | 18.015.02 | Town Creek Elementary | ADA fire alarm upgrade | $ 10,000 | $ 10,000 | $ 10,000 | ||
2002 | Montgomery | 15.241.02 | Hoover Middle | Flooring | Trash room floor replacement | $ 13,750 | $ 13,750 | $ 13,750 | |
2002 | Montgomery | 15.211.02 | Paint Branch High | Flooring | Carpet and floor replacement | $ 17,298 | $ 17,298 | $ 17,298 | |
2002 | Montgomery | 15.005.02 | Richard Montgomery High | Flooring | Gym wooden floor replacement | $ 14,094 | $ 14,094 | $ 14,094 | |
2002 | Montgomery | 15.107.02 | Sherwood Elementary | Flooring | Replace carpet and floor tile | $ 63,424 | $ 63,424 | $ 63,424 | |
2002 | Montgomery | 15.019.02 | Seneca Valley High | Foundation, waterproofing and repair | $ 14,451 | $ 14,451 | $ 14,451 | ||
2002 | Montgomery | 15.072.02 | Twinbrook Elementary | Window replacement | $ 14,820 | $ 14,820 | $ 14,820 | ||
2002 | Montgomery | 15.194.02 | Maryvale Elementary | Concrete Replacement | $ 24,609 | $ 24,609 | $ 24,609 | ||
2002 | Queen Anne's | 17.004.02 | Centreville Middle | Rooftop Unit Replacement | Replacement of roof top unit over pod A | $ 85,000 | $ 85,000 | $ 85,000 | |
2003 | Harford | 12.008.03 | Harford Technical High | Partition Replacement | Existing partition is not repairable and has been condemned. Unit is stuck in the open position. | $ 15,000 | $ 15,000 | $ 15,000 | 100 |
2003 | Harford | 12.006.03 | Aberdeen Middle | Flooring | Replace carpet | $ 39,845 | $ 39,845 | $ 39,845 | |
2003 | Harford | 12.007.03 | North Harford Middle | Fire alarm replacement | $ 90,890 | $ 90,890 | $ 90,890 | ||
2003 | Harford | 12.013.03 | William S. James Elementary | Cooling tower replacement | $ 54,437 | $ 54,437 | $ 54,437 | ||
2003 | Harford | 12.046.03 | Joppatowne High | Flooring | Replace carpet | $ 36,989 | $ 36,989 | $ 36,989 | |
2003 | Harford | 12.004.03 | Bel Air High | Flooring | Replace carpet | $ 39,424 | $ 39,424 | $ 39,424 | |
2003 | Harford | 12.055.03 | Norrisville Elementary | Septic field replacement | $ 29,532 | $ 29,532 | $ 29,532 | ||
2003 | Allegany | 01.029.03 | Frost Elementary | Window replacement | $ 172,869 | $ 172,869 | $ 172,869 | ||
2003 | Montgomery | 15.185.03 | Bells Mill Elementary | Painting | Interior | $ 17,500 | $ 17,500 | $ 17,500 | |
2003 | Montgomery | 15.197.03 | Farquhar Middle | Painting | Interior | $ 39,200 | $ 39,200 | $ 39,200 | |
2003 | Montgomery | 15.219.03 | Rolling Terrace Elementary | Painting | Interior | $ 23,775 | $ 23,775 | $ 23,775 | |
2003 | Montgomery | 15.130.03 | Gaithersburg High | Athletic Fields Renovations | $ 240,882 | $ 240,882 | $ 240,882 | ||
2003 | Montgomery | 15.090.03 | Damascus High | Tennis Courts Renovations | $ 15,936 | $ 15,936 | $ 15,936 | ||
2003 | Kent | 14.007.03 | Kent County High | Flooring | Replace carpet in media center | $ 10,000 | $ 10,000 | $ 10,000 | |
2003 | Cecil | 07.028.03 | Cecil County School of Technology | Renovate cosmetology classroom | $ 41,743 | $ 41,743 | $ 41,743 | ||
2003 | Baltimore City | 30.130.03 | #005 Langston Hughes E. | Flooring | Replace gym floor | $ 13,900 | $ 13,900 | $ 13,900 | |
2003 | Baltimore City | 30.130.03 | #005 Langston Hughes E. | AC computer lab | $ 10,850 | $ 10,850 | $ 10,850 | ||
2003 | Baltimore County | 03.184.03 | Riverview Elementary | Alarm system Replacement/Upgrade Panel | $ 13,260 | $ 13,260 | $ 13,260 | ||
2003 | Baltimore County | 03.013.03 | Prettyboy Elementary | Alarm system Replacement/Upgrade Panel | $ 13,095 | $ 13,095 | $ 13,095 | ||
2003 | Baltimore County | 03.186.03 | Halstead Academy | Alarm system Replacement/Upgrade Panel | $ 11,692 | $ 11,692 | $ 11,692 | ||
2003 | Baltimore County | 03.133.03 | Dulaney High | Lighting | Additional outdoor lights | $ 22,411 | $ 22,411 | $ 22,411 | |
2003 | Baltimore County | 03.095.03 | George Washington Carver Center for Arts & Technology | Alarm system Replacement/Upgrade Panel | $ 12,543 | $ 12,543 | $ 12,543 | ||
2003 | Baltimore County | 03.049.03 | Dumbarton Middle | Alarm system Replacement/Upgrade Panel | $ 11,340 | $ 11,340 | $ 11,340 | ||
2003 | Baltimore County | 03.075.03 | Eastern Technical High | HVAC system and ATC systems controls replacement | $ 1,154,818 | $ 1,154,818 | $ 1,154,818 | ||
2003 | Baltimore County | 03.188.03 | Carney Elementary | Unit vents replacement | $ 80,000 | $ 80,000 | |||
2003 | Baltimore County | 03.165.03 | Overlea High | Gym lockers replacement | $ 71,034 | $ 71,034 | $ 71,034 | ||
2003 | Baltimore County | 03.153.03 | Bear Creek Elementary | ADA modification | Exterior doors | $ 78,500 | $ 78,500 | $ 78,500 | |
2003 | Baltimore County | 03.148.03 | Kenwood High | Alarm system Replacement/Upgrade Panel | $ 13,390 | $ 13,390 | $ 13,390 | ||
2003 | Baltimore County | 03.047.03 | Holabird Middle | Alarm system Replacement/Upgrade Panel | $ 13,900 | $ 13,900 | $ 13,900 | ||
2003 | Montgomery | 15.182.03 | John T. Baker Middle | chiller and Cooling tower Replacement | $ 208,438 | $ 208,438 | $ 205,638 | ||
2003 | Montgomery | 15.040.03 | Fallsmead Elementary | Flooring and Asbestos Abatement | $ 87,913 | $ 87,913 | $ 87,913 | ||
2003 | Prince George's | 16.122.03 | Thomas Pullen Middle | Steam boiler Replacement | $ 235,646 | $ 235,646 | $ 235,646 | ||
2003 | Prince George's | 16.087.03 | Suitland High | Chiller/cooling tower replacement | $ 184,924 | $ 184,924 | $ 184,924 | ||
2003 | Prince George's | 16.188.03 | Kettering Elementary | Chiller replacement | $ 157,434 | $ 157,434 | $ 157,434 | ||
2003 | Prince George's | 16.195.03 | Kenilworth Elementary | Steam boiler replacement | $ 79,900 | $ 79,900 | $ 79,900 | ||
2003 | Garrett | 11.004.03 | Grantsville Elementary | Flooring | Carpet replacement | $ 20,899 | $ 20,899 | $ 20,899 | |
2003 | Garrett | 11.008.03 | Southern Middle | Locker Replacement | Replace lockers in the boys' gym | $ 23,365 | $ 23,365 | $ 23,365 | |
2003 | Garrett | 11.014.03 | Northern High | Chimney repair and brick replacement | $ 14,992 | $ 14,992 | $ 14,992 | ||
2003 | Queen Anne's | 17.004.03 | Centreville Middle | RTU Replacement | Replace cafeteria rooftop units | $ 85,000 | $ 85,000 | $ 85,000 | |
2003 | Frederick | 10.001.03 | Middletown Elementary | Window Replacement | Phase IV | $ 20,000 | $ 20,000 | $ 20,000 | |
2003 | Frederick | 10.009.03 | Frederick High | Window Replacement | Phase IV | $ 11,600 | $ 11,600 | $ 11,600 | |
2003 | Frederick | 10.030.03 | New Market Elementary | Window Replacement | Phase I | $ 30,000 | $ 30,000 | $ 30,000 | |
2003 | Frederick | 10.060.03 | Lewistown Elementary | Flooring Replacement | Phase II | $ 23,000 | $ 23,000 | $ 23,000 | |
2003 | Allegany | 01.001.03 | George's Creek Elementary | Flooring | Replace concrete floor | $ 162,131 | $ 162,131 | $ 162,131 | |
2003 | Allegany | 01.013.03 | Eckhart Alternative | Flooring | Replace carpet | $ 10,000 | $ 10,000 | $ 10,000 | |
2003 | Allegany | 01.021.03 | South Penn Elementary | Flooring | Replace carpet | $ 10,000 | $ 10,000 | $ 10,000 | |
2003 | St. Mary's | 18.018.03 | Loveville Building | Playground Equipment | $ 45,000 | $ 45,000 | $ 45,000 | ||
2003 | St. Mary's | 18.023.03 | Greenview Knolls Elementary | Playground Equipment | $ 40,000 | $ 40,000 | $ 40,000 | ||
2003 | Washington | 21.017.03 | Northern Middle | Flooring | Replace carpet/tile | $ 95,000 | $ 95,000 | $ 95,000 | |
2003 | Washington | 21.010.03 | Boonsboro Middle | Flooring | Gym floor replacement | $ 46,780 | $ 46,780 | $ 46,780 | |
2003 | Washington | 21.017.03 | Northern Middle | Fire Alarm Replacement | $ 44,820 | $ 44,820 | $ 44,820 | ||
2003 | Kent | 14.002.03 | Galena Middle | Fuel storage tank replacement | $ 41,946 | $ 41,946 | $ 41,946 | ||
2003 | Harford | 12.017.03 | Jarrettsville Elementary | Control replacement | $ 21,400 | $ 21,400 | $ 21,400 | ||
2003 | Garrett | 11.014.03 | Northern High | Locker Replacement | $ 11,700 | $ 11,700 | $ 11,700 | ||
2003 | Garrett | 11.008.03 | Southern Middle | Sidewalk repair | $ 13,560 | $ 13,560 | $ 13,560 | ||
2003 | Montgomery | 15.131.03 | Stephen Knolls Special Education | Flooring | Replace floor covering | $ 44,355 | $ 44,355 | $ 44,355 | |
2003 | Montgomery | 15.045.03 | Col. Zadok Magruder High | Upgrade natural gas system | $ 10,048 | $ 10,048 | $ 10,048 | ||
2003 | Montgomery | 15.066.03 | Poolesville High | Corridor Lockers Replacement | $ 98,916 | $ 98,916 | $ 98,916 | ||
2003 | Montgomery | 15.231.03 | Argyle Middle | Window and Door replacements | Replace exterior window and doors | $ 95,634 | $ 95,634 | $ 95,634 | |
2003 | Montgomery | 15.161.03 | Robert Frost Middle | Parking Lot Renovations | Replace asphalt in parking lots and play areas | $ 76,383 | $ 76,383 | $ 76,383 | |
2003 | Montgomery | 15.130.03 | Gaithersburg High | Flooring | Replace trash room floor | $ 14,900 | $ 14,900 | $ 14,900 | |
2003 | Montgomery | 15.040.03 | Fallsmead Elementary | Parking Lot Repairs | Replace asphalt in parking lots and play areas | $ 44,143 | $ 44,143 | $ 44,143 | |
2003 | Montgomery | 15.220.03 | Luxmanor Elementary | Concrete Sidewalk Replacement | $ 39,868 | $ 39,868 | $ 39,868 | ||
2003 | Montgomery | 15.194.03 | Maryvale Elementary | Parking Lot Renovations | Replace asphalt in parking lots and play areas | $ 49,672 | $ 49,672 | $ 49,672 | |
2003 | Montgomery | 15.249.03 | Piney Branch Elementary | Parking Lot Renovations | Replace asphalt in parking lots and play areas | $ 21,580 | $ 21,580 | $ 21,580 | |
2003 | Montgomery | 15.107.03 | Sherwood Elementary | Parking Lot Renovations | Replace asphalt in parking lots and play areas | $ 37,858 | $ 37,858 | $ 37,858 | |
2003 | Baltimore County | 03.125.03 | Chadwick Elementary | Alarm system Replacement/Upgrade Panel | $ 12,359 | $ 12,359 | $ 12,359 | ||
2003 | Baltimore County | 03.101.03 | Edmondson Heights Elementary | Lighting | Additional outdoor lights | $ 30,155 | $ 30,155 | $ 30,155 | |
2003 | Baltimore County | 03.100.03 | Baltimore Highlands Elementary | Lighting | Additional outdoor lights | $ 20,017 | $ 20,017 | $ 20,017 | |
2003 | Baltimore County | 03.085.03 | Pikesville Middle | Protective canopy over bus area | $ 274,679 | $ 274,679 | $ 274,679 | ||
2003 | Baltimore County | 03.166.03 | Cedarmere Elementary | Alarm system Replacement/Upgrade Panel | $ 13,048 | $ 13,048 | $ 13,048 | ||
2003 | Baltimore County | 03.002.03 | Chatsworth Elementary | Alarm system Replacement/Upgrade Panel | $ 12,359 | $ 12,359 | $ 12,359 | ||
2003 | Baltimore County | 03.120.03 | Franklin High | Alarm system Replacement/Upgrade Panel | $ 11,609 | $ 11,609 | $ 11,609 | ||
2003 | Baltimore City | 30.249.03 | #162 Diggs-Johnson M. | Lighting Replacement | Replace lighting in various areas throughout school | $ 39,630 | $ 39,630 | $ 39,630 | |
2003 | Baltimore County | 03.163.03 | Sussex Elementary | Alarm system Replacement/Upgrade Panel | $ 12,735 | $ 12,735 | $ 12,735 | ||
2003 | Howard | 13.004.03 | Lisbon Elementary | Door frames Replacement | $ 25,000 | $ 25,000 | $ 25,000 | ||
2003 | Worcester | 23.007.03 | Buckingham Elementary | Flooring | Replace cafetorium floor | $ 11,069 | $ 11,069 | $ 11,069 | |
2003 | Worcester | 23.007.03 | Buckingham Elementary | Repair electric curtain walls (2) | $ 10,102 | $ 10,102 | $ 10,102 | ||
2003 | Worcester | 23.012.03 | Berlin Intermediate | P.A. system replacement | $ 14,587 | $ 14,587 | $ 14,587 | ||
2003 | Worcester | 23.001.03 | Showell Elementary | Flooring | Replace cafetorium floor | $ 10,972 | $ 10,972 | $ 10,972 | |
2003 | Worcester | 23.001.03 | Showell Elementary | Flooring | Carpet replacement | $ 18,270 | $ 18,270 | $ 18,270 | |
2003 | Charles | 08.011.03 | Arthur Middleton Elementary | Soffit/fascia replacement | $ 65,000 | $ 65,000 | $ 65,000 | ||
2003 | Washington | 21.048.03 | Fairview Outdoor Education Center | Flooring | Carpet/tile replacement | $ 13,400 | $ 13,400 | $ 13,400 | |
2003 | Baltimore City | 30.259.03 | #024 Westside E. | Flooring | Install VCT in approximately 30 classrooms | $ 35,797 | $ 35,797 | $ 35,797 | |
2003 | Somerset | 19.014.03 | Greenwood Middle | Parking Lot Renovations | $ 32,000 | $ 32,000 | $ 32,000 | ||
2003 | Somerset | 19.001.03 | Westover Elementary | Parking Lot Renovations | $ 33,000 | $ 33,000 | $ 33,000 | ||
2003 | Anne Arundel | 02.030.03 | Annapolis High | Flooring | Replace carpet | $ 173,500 | $ 173,500 | $ 173,500 | |
2003 | Anne Arundel | 02.099.03 | South River High | Flooring | Replace carpet | $ 59,607 | $ 59,607 | $ 59,607 | |
2003 | Anne Arundel | 02.038.03 | Crofton Middle | Flooring | Replace carpet | $ 109,200 | $ 109,200 | $ 109,200 | |
2003 | Anne Arundel | 02.032.03 | Broadneck High | Flooring | Replace carpet | $ 56,608 | $ 56,608 | $ 56,608 | |
2003 | Anne Arundel | 02.012.03 | Chesapeake High | Flooring | Replace carpet | $ 20,622 | $ 20,622 | $ 20,622 | |
2003 | Anne Arundel | 02.051.03 | Corkran Middle | Flooring | Replace carpet | $ 67,322 | $ 67,322 | $ 67,322 | |
2003 | Baltimore City | 30.197.03 | #010 James McHenry E. | Flooring | Refinish gym floor | $ 19,895 | $ 19,895 | $ 19,895 | |
2003 | Baltimore City | 30.197.03 | #010 James McHenry E. | Painting | Interior | $ 53,000 | $ 53,000 | $ 53,000 | |
2003 | Baltimore City | 30.144.03 | #013 Tench Tilghman E. | Painting | Interior | $ 39,850 | $ 39,850 | $ 39,850 | |
2003 | Baltimore City | 30.138.03 | #025 Dr. Rayner Browne E. | Painting | Interior and exterior | $ 36,000 | $ 36,000 | $ 36,000 | |
2003 | Baltimore City | 30.017.03 | #027 Commodore John Rodgers Elementary | Painting | Interior | $ 11,788 | $ 11,788 | $ 11,788 | |
2003 | Baltimore City | 30.017.03 | #027 Commodore John Rodgers Elementary | Flooring | Replace carpeting in auditorium, library and music room. | $ 58,000 | $ 58,000 | $ 58,000 | |
2003 | Baltimore City | 30.017.03 | #027 Commodore John Rodgers Elementary | Flooring | Refinish gym floor | $ 33,900 | $ 33,900 | $ 33,900 | |
2003 | Baltimore City | 30.190.03 | #034 Charles Carroll E. | Painting | Interior and exterior doors | $ 33,500 | $ 33,500 | $ 33,500 | |
2003 | Baltimore City | 30.190.03 | #034 Charles Carroll E. | Flooring | Refinish gym floor | $ 21,860 | $ 21,860 | $ 21,860 | |
2003 | Baltimore City | 30.190.03 | #034 Charles Carroll E. | Lighting | Replace lighting | $ 69,250 | $ 69,250 | $ 69,250 | |
2003 | Baltimore City | 30.277.03 | #035 Harlem Park E. | Painting | Paint classrooms and restrooms | $ 24,800 | $ 24,800 | $ 24,800 | |
2003 | Baltimore City | 30.019.03 | #036 Harford Heights Primary | Painting | Interior and exterior doors | $ 44,000 | $ 44,000 | $ 44,000 | |
2003 | Baltimore City | 30.019.03 | #037 Harford Heights Intermediate | Painting | Interior and exterior doors | $ 73,000 | $ 73,000 | $ 73,000 | |
2003 | Baltimore City | 30.029.03 | #053 Margaret Brent E. | Flooring | Replace carpet/VCT in classrooms on first floor, one 2nd floor room and the office. | $ 25,480 | $ 25,480 | $ 25,480 | |
2003 | Baltimore City | 30.261.03 | #060 Gwynns Falls E. | Painting | Paint classrooms and 2nd floor walls and lockers | $ 18,685 | $ 18,685 | $ 18,685 | |
2003 | Baltimore City | 30.034.03 | #061 John Eager Howard E. | Flooring | Gym floor and walls refinishing | $ 31,345 | $ 31,345 | $ 31,345 | |
2003 | Baltimore City | 30.274.03 | #078 Harlem Park M. | Painting | Interior and exterior | $ 95,350 | $ 95,350 | $ 95,350 | |
2003 | Baltimore City | 30.237.03 | #080 West Baltimore M. | Painting | Interior | $ 98,000 | $ 98,000 | $ 98,000 | |
2003 | Baltimore City | 30.042.03 | #083 William Paca E. | Painting | Interior | $ 55,000 | $ 55,000 | $ 55,000 | |
2003 | Baltimore City | 30.042.03 | #083 William Paca E. | Flooring | Refinish gym floor | $ 23,900 | $ 23,900 | $ 23,900 | |
2003 | Baltimore City | 30.044.03 | #084 Thomas Johnson E. | Flooring | Gym floor replacement | $ 15,940 | $ 15,940 | $ 15,940 | |
2003 | Baltimore City | 30.275.03 | #102 Thomas G. Hayes E. | Flooring | Replace carpet | $ 10,722 | $ 10,722 | $ 10,722 | |
2003 | Baltimore City | 30.275.03 | #102 Thomas G. Hayes E. | Painting | Paint second floor classrooms | $ 13,000 | $ 13,000 | $ 13,000 | |
2003 | Baltimore City | 30.203.03 | #122 Samuel Coleridge-Taylor E. | Painting | Paint some rooms and hallways on 2nd and 3rd floors | $ 36,200 | $ 36,200 | $ 36,200 | |
2003 | Baltimore City | 30.074.03 | #177 George W.F. McMechen M./H. | Flooring | Install carpet in the media center and some rooms and install VCT in some rooms. | $ 89,890 | $ 89,890 | $ 89,890 | |
2003 | Baltimore City | 30.255.03 | #201 Dickey Hill E./M. | Flooring | Replace gym floor | $ 19,500 | $ 19,500 | $ 19,500 | |
2003 | Baltimore City | 30.255.03 | #201 Dickey Hill E./M. | Lighting | Upgrade lighting throughout school | $ 65,500 | $ 65,500 | $ 65,500 | |
2003 | Baltimore City | 30.159.03 | #203 Maree Garnett Farring E. | Flooring | Remove carpet and replace with VCT | $ 14,703 | $ 14,703 | $ 14,703 | |
2003 | Baltimore City | 30.248.03 | #207 Curtis Bay E. | Flooring | Refinish gym floor | $ 17,400 | $ 17,400 | $ 17,400 | |
2003 | Baltimore City | 30.248.03 | #207 Curtis Bay E. | Light fixture Replacement | Replace fixtures in hallways | $ 18,421 | $ 18,421 | $ 18,421 | |
2003 | Baltimore City | 30.189.03 | #210 Hazelwood E./M. | Light fixture Replacement | Replace fixtures in hallways | $ 23,760 | $ 23,760 | $ 23,760 | |
2003 | Baltimore City | 30.161.03 | #211 Gardenville E. | Flooring | Replace carpet with VCT throughout school | $ 33,078 | $ 33,078 | $ 33,078 | |
2003 | Baltimore City | 30.161.03 | #211 Gardenville E. | Painting | Paint cafeteria, office and some classrooms | $ 18,650 | $ 18,650 | $ 18,650 | |
2003 | Baltimore City | 30.205.03 | #219 Yorkwood E. | Flooring | Refinish gym floor | $ 27,800 | $ 27,800 | $ 27,800 | |
2003 | Baltimore City | 30.149.03 | #220 Morrell Park E. | Flooring | Refinish gym floor | $ 18,490 | $ 18,490 | $ 18,490 | |
2003 | Baltimore City | 30.166.03 | #230 Canton M. | Flooring | Refinish gym floor | $ 20,000 | $ 20,000 | $ 20,000 | |
2003 | Baltimore City | 30.258.03 | #249 Medfield Heights E. | Lighting | Replace lighting in classrooms and gym | $ 54,000 | $ 54,000 | $ 54,000 | |
2003 | Baltimore City | 30.134.03 | #256 Calvin Rodwell E. | Flooring | Refinish gym floor | $ 20,490 | $ 20,490 | $ 20,490 | |
2003 | Baltimore City | 30.134.03 | #256 Calvin Rodwell E. | Painting | Interior | $ 32,000 | $ 32,000 | $ 32,000 | |
2003 | Baltimore City | 30.188.03 | #411 Walbrook H. | Bleacher Replacement | $ 45,380 | $ 45,380 | $ 45,380 | ||
2003 | Baltimore City | 30.111.03 | #450 Frederick Douglass H. | Flooring | Repair and refinish gym floor | $ 33,704 | $ 33,704 | $ 33,704 | |
2003 | Talbot | 20.005.03 | Easton Elementary - Dobson Building | Playground | $ 155,000 | $ 155,000 | $ 155,000 | ||
2003 | Kent | 14.008.03 | Worton Elementary | Exterior door replacement | $ 13,000 | $ 13,000 | $ 13,000 | ||
2003 | Dorchester | 09.010.03 | Maple Elementary | Lighting | Site lighting replacement | $ 51,000 | $ 51,000 | $ 51,000 | |
2003 | Howard | 13.031.03 | Clarksville Middle | Door frame replacement | $ 40,000 | $ 40,000 | $ 40,000 | ||
2003 | Baltimore County | 03.147.03 | Deer Park Middle | Boiler replacement | $ 172,000 | $ 172,000 | $ 172,000 | ||
2003 | Baltimore County | 03.022.03 | Stoneleigh Elementary | Fire alarm replacement | $ 48,899 | $ 48,899 | $ 48,899 | ||
2003 | Carroll | 06.014.03 | Carrolltowne Elementary | Flooring | Retile-Remove tiles and replace with VCT | $ 24,930 | $ 24,930 | $ 24,930 | |
2003 | Carroll | 06.018.03 | Robert Moton Elementary | Flooring | Remove tiles and replace with VCT | $ 51,491 | $ 51,491 | $ 51,491 | |
2003 | Carroll | 06.015.03 | Freedom Elementary | Flooring | Remove tiles and replace with VCT | $ 46,697 | $ 46,697 | $ 46,697 | |
2003 | Carroll | 06.020.03 | Eldersburg Elementary | Flooring | Remove tiles and replace with VCT | $ 16,685 | $ 16,685 | $ 16,685 | |
2003 | Carroll | 06.032.03 | Carroll County Career and Technology Center | Flooring | Remove tiles and replace with VCT | $ 67,072 | $ 67,072 | $ 67,072 | |
2003 | Carroll | 06.025.03 | William Winchester Elementary | Flooring | Remove tiles and replace with VCT | $ 48,159 | $ 48,159 | $ 48,159 | |
2003 | Calvert | 04.004.03 | Calvert Elementary | Rooftop air handling units | $ 13,574 | $ 13,574 | $ 13,574 | ||
2003 | Calvert | 04.004.03 | Calvert Elementary | Sanitary system | $ 50,000 | $ 50,000 | $ 50,000 | ||
2003 | Wicomico | 22.020.03 | Chipman Elementary | Flooring | Gym floor replacement | $ 25,400 | $ 25,400 | $ 25,400 | |
2003 | Wicomico | 22.020.03 | Chipman Elementary | Exterior refurbishment | $ 13,900 | $ 13,900 | $ 13,900 | ||
2003 | Wicomico | 22.007.03 | Delmar Elementary | Flooring | Carpet Replacement | $ 68,978 | $ 68,978 | $ 68,978 | |
2003 | Wicomico | 22.019.03 | Pittsville Elementary/Middle | Window replacement | Replace gym window | $ 62,960 | $ 62,960 | $ 62,960 | |
2003 | Wicomico | 22.016.03 | Fruitland Primary | Fencing | Perimeter exterior fence | $ 22,043 | $ 22,043 | $ 22,043 | |
2003 | Wicomico | 22.015.03 | Wicomico Middle | Flooring | Carpet replacement | $ 36,635 | $ 36,635 | $ 36,635 | |
2003 | Wicomico | 22.018.03 | Mardela Middle/High | Flooring | Gym floor refurbishment | $ 18,300 | $ 18,300 | $ 18,300 | |
2003 | Wicomico | 22.002.03 | Pinehurst Elementary | Re-plaster therapy tank | $ 12,517 | $ 12,517 | $ 12,517 | ||
2003 | Wicomico | 22.009.03 | Wicomico High | Sewer refurbishment | $ 39,867 | $ 39,867 | $ 39,867 | ||
2003 | Wicomico | 22.002.03 | Pinehurst Elementary | Sewer refurbishment | $ 16,157 | $ 16,157 | $ 16,157 | ||
2003 | Wicomico | 22.016.03 | Fruitland Primary | Sewer refurbishment | $ 14,497 | $ 14,497 | $ 14,497 | ||
2003 | Wicomico | 22.005.03 | Beaver Run Elementary | Sewer Refurbishment | $ 23,746 | $ 23,746 | $ 23,746 | ||
2003 | Prince George's | 16.022.03 | Oakcrest Elementary | Flooring | Replace stage floor system | $ 8,073 | $ 8,073 | $ 8,073 | |
2003 | Prince George's | 16.002.03 | Eleanor Roosevelt High | Flooring | Replace stage floor | $ 22,646 | $ 22,646 | $ 22,646 | |
2003 | Prince George's | 16.030.03 | Deerfield Run Elementary | Prep, prime and apply 2 finish coats to all interior walls, ceiling, doors and trim. | $ 48,550 | $ 48,550 | $ 48,550 | ||
2003 | Prince George's | 16.238.03 | Frances T. Evans Elementary | Prep, prime and apply 2 finish coats too all interior walls, ceilings, doors and trim. | $ 58,890 | $ 58,890 | $ 58,890 | ||
2003 | Prince George's | 16.245.03 | Matthew Henson Elementary | Prep, prime and apply 2 finish coats too all interior walls, ceilings, doors and trim. | $ 59,000 | $ 59,000 | $ 59,000 | ||
2003 | Prince George's | 16.046.03 | Friendly High | Flooring | Stage floor renovation | $ 25,428 | $ 25,428 | $ 25,428 | |
2003 | Prince George's | 16.085.03 | High Point High | Flooring | Stage floor renovation | $ 26,753 | $ 26,753 | $ 26,753 | |
2003 | Prince George's | 16.024.03 | William Beanes Elementary | Prep, prime and apply 2 finish coats too all interior | $ 62,756 | $ 62,756 | $ 62,756 | ||
2003 | Baltimore County | 03.103.03 | Johnnycake Elementary | Security Upgrade | $ 13,275 | $ 13,275 | $ 13,275 | ||
2003 | Baltimore County | 03.023.03 | Pot Spring Elementary | Security upgrade | $ 12,824 | $ 12,824 | $ 12,824 | ||
2003 | Baltimore County | 03.042.03 | Rodgers Forge Elementary | Security upgrade | $ 11,419 | $ 11,419 | $ 11,419 | ||
2003 | Baltimore County | 03.213.03 | Catonsville Alternative Center | Security Upgrade | $ 15,207 | $ 15,207 | $ 15,207 | ||
2003 | Baltimore County | 03.010.03 | Woodbridge Elementary | Security Panel Upgrade | $ 12,381 | $ 12,381 | $ 12,381 | ||
2003 | Baltimore County | 03.021.03 | Maiden Choice Special Education | Security Upgrade | $ 12,126 | $ 12,126 | $ 12,126 | ||
2003 | Baltimore County | 03.005.03 | Halethorpe Elementary | Lockouts and Security Panel Upgrade | $ 11,876 | $ 11,876 | $ 11,876 | ||
2003 | Baltimore County | 03.188.03 | Carney Elementary | Security Upgrade | $ 12,173 | $ 12,173 | $ 12,173 | ||
2003 | Baltimore County | 03.110.03 | Logan Elementary | Security Upgrade | $ 13,148 | $ 13,148 | $ 13,148 | ||
2003 | Baltimore County | 03.025.03 | Scotts Branch Elementary | Security upgrade | $ 12,192 | $ 12,192 | $ 12,192 | ||
2003 | Baltimore County | 03.032.03 | Randallstown High | Security system | $ 56,332 | $ 56,332 | $ 56,332 | ||
2003 | Baltimore County | 03.075.03 | Eastern Technical High | HVAC Support Upgrade | $ 174,940 | $ 174,940 | $ 174,940 | ||
2003 | Baltimore County | 03.149.03 | Lansdowne High | Corridor locker Replacements | $ 144,920 | $ 144,920 | $ 144,920 | ||
2003 | Baltimore County | 03.103.03 | Johnnycake Elementary | Lighting | Exterior Lighting | $ 30,313 | $ 30,313 | $ 30,313 | |
2003 | Cecil | 07.011.03 | Thomson Estates Elementary | Fire Alarm System Upgrade | This project is a request to upgrade the existing fire alarm system per the State Fire Marshall's recommendations. The work scope includes replacing the control panel, alarm devices, and installing new cabling. | $ 17,950 | $ 17,950 | $ 17,950 | |
2003 | Cecil | 07.041.03 | Leeds Elementary | Fire Alarm System Upgrade | This project is a request to upgrade the existing fire alarm system per the State Fire Marshall's recommendations. The work scope includes replacing the control panel, alarm devices, and installing new cabling. | $ 22,992 | $ 22,992 | $ 22,992 | |
2003 | Cecil | 07.021.03 | Kenmore Elementary | Fire Alarm System Upgrade | This project is a request to upgrade the existing fire alarm system per the State Fire Marshall's recommendations. The work scope includes replacing the control panel, alarm devices, and installing new cabling. | $ 27,307 | $ 27,307 | $ 27,307 | |
2003 | Cecil | 07.016.03 | Gilpin Manor Elementary | Fire Alarm System Upgrade | This project is a request to upgrade the existing fire alarm system per the State Fire Marshall's recommendations. The work scope includes replacing the control panel, alarm devices, and installing new cabling. | $ 35,050 | $ 35,050 | $ 35,050 | |
2003 | Cecil | 07.011.03 | Thomson Estates Elementary | Flooring | This project is a request to remove the existing carpet in various areas due to the age and condition. The work scope includes removing the old carpet and installing new vinyl floor tile, cove base and/or new carpeting. | $ 34,415 | $ 34,415 | $ 34,415 | |
2003 | Cecil | 07.013.03 | Perryville High | Flooring | This project is a request to remove the existing carpet in various areas due to the age and condition. The work scope includes removing the old carpet and installing new vinyl floor tile, cove base and/or new carpeting. | $ 15,850 | $ 15,850 | $ 15,850 | |
2003 | Cecil | 07.039.03 | Cherry Hill Middle | Flooring | This project is a request to remove existing A.C.M. tile in various areas due to the condition. The work scope includes removing the old floor tile, completing the asbestos abatement, and installing new vinyl floor tile and cove base. | $ 27,400 | $ 27,400 | $ 27,400 | |
2003 | Cecil | 07.039.03 | Cherry Hill Middle | Flooring | This project is a request to remove existing ceramic floor tile from the corridors due to the deteriorating conditions. The work scope includes removing the ceramic floor tile and adhesive. Install new vinyl floor tile and cove base. | $ 64,225 | $ 64,225 | $ 64,225 | |
2003 | Cecil | 07.012.03 | North East Middle | Cooling Tower Replacement | This project is a request to replace the existing cooling tower, which serves the air conditioning system for the school facility. The condition of the unit is deteriorating due to age, wear and use. The work scope includes removing the existing unit and installing a new cooling tower unit, fitting's and connections. | $ 25,698 | $ 25,698 | $ 25,698 | |
2003 | Cecil | 07.013.03 | Perryville High | Air Conditioning System Installation | This project is a request to install an air conditioning system to a Wood Shop instruction room due to curriculum adjustments. The work scope includes installing a self-contained system with fittings, accessories, and controls. | $ 10,169 | $ 10,169 | $ 10,169 | |
2003 | Cecil | 07.040.03 | North East High | Locker Upgrade | This project is a request to upgrade the existing locker units in the facility corridors and locker rooms. Because of wear and use, the exterior finish has deteriorated. The work scope includes the preparation and application of an electrostatic paint finish to the locker units. | $ 19,351 | $ 19,351 | $ 19,351 | |
2003 | Cecil | 07.040.03 | North East High | Ceiling Replacement | This project is a request to upgrade the existing ceiling system in the second floor corridors. Because of previous moisture penetration, the ceiling material has deteriorated. The work space includes installing a new suspended ceiling and new lighting fixtures. | $ 12,850 | $ 12,850 | $ 12,850 | |
2003 | Harford | 12.004.03 | Bel Air High | Partition Replacement | Existing partition is not repairable and has been condemned. Unit is stuck in the open position. | $ 11,000 | $ 11,000 | $ 11,000 | |
2003 | Caroline | 05.008.03 | Preston Elementary | Repoint Masonry walls | $ 36,062 | $ 36,062 | $ 36,062 | ||
2003 | Caroline | 05.009.03 | Caroline Career and Technology Center | Door Replacement | Replace (3) exterior door systems | $ 10,135 | $ 10,135 | $ 10,135 | |
2003 | Caroline | 05.002.03 | North Caroline High | Control systems Replacement | Replace control systems in two (2) sewage lift stations. | $ 10,352 | $ 10,352 | $ 10,352 | |
2003 | Caroline | 05.006.03 | Ridgely Elementary | Parking Lot Renovations | Repave parking lot | $ 23,000 | $ 23,000 | $ 23,000 | |
2003 | Carroll | 06.036.03 | Westminster West Middle | flooring | Remove and replace asbestos containing floor tile | $ 129,542 | $ 129,542 | $ 129,542 | |
2003 | Harford | 12.014.03 | Edgewood Middle | Carpet Replacement | $ 21,700 | $ 21,700 | $ 21,700 | ||
2003 | Anne Arundel | 02.114.03 | Southgate Elementary | Carpet Replacement | Replace carpet and assoc. Asbestos abate. | $ 44,594 | $ 44,594 | $ 44,594 | |
2003 | Anne Arundel | 02.005.03 | Severna Park High | Carpet Replacement | $ 36,180 | $ 36,180 | $ 36,180 | ||
2003 | Baltimore County | 03.049.03 | Dumbarton Middle | Flooring | Gym Floor refinishing | $ 12,914 | $ 12,914 | $ 12,914 | |
2003 | Baltimore County | 03.134.03 | Loch Raven High | AC Installation | Install AC for Media Center networking wiring closet | $ 18,545 | $ 18,545 | $ 18,545 | |
2003 | Baltimore County | 03.165.03 | Overlea High | Security System Upgrade | Upgrade security system | $ 15,000 | $ 15,000 | $ 15,000 | |
2003 | Baltimore County | 03.015.03 | Rosedale Alternative Center | Security System | $ 15,000 | $ 15,000 | $ 15,000 | ||
2003 | Baltimore County | 03.127.03 | Franklin Middle | Security System Upgrade | $ 15,000 | $ 15,000 | $ 15,000 | ||
2003 | Baltimore County | 03.106.03 | Reisterstown Elementary | Security System Upgrade | $ 15,000 | $ 15,000 | $ 15,000 | ||
2003 | Baltimore County | 03.051.03 | Sparrows Point Middle/High | Security System Upgrade | $ 15,000 | $ 15,000 | $ 15,000 | ||
2003 | Baltimore County | 03.045.03 | Ridgely Middle | Security System Upgrade | $ 15,000 | $ 15,000 | $ 15,000 | ||
2003 | Baltimore County | 03.041.03 | Dundalk Middle | Flooring | Gym Floor refinishing | $ 10,514 | $ 10,514 | $ 10,514 | |
2003 | Baltimore County | 03.181.03 | Winand Elementary | Security System Upgrade | $ 15,000 | $ 15,000 | $ 15,000 | ||
2003 | Baltimore County | 03.010.03 | Woodbridge Elementary | Electric Breaker Replacement | $ 25,750 | $ 25,750 | $ 25,750 | ||
2003 | Baltimore County | 03.048.03 | Arbutus Middle | Electric Breaker Replacement | $ 25,750 | $ 25,750 | $ 25,750 | ||
2003 | Baltimore County | 03.165.03 | Overlea High | Piping | Replace heating system piping in Gym crawl space | $ 22,676 | $ 22,676 | $ 22,676 | |
2003 | Baltimore County | 03.070.03 | Perry Hall Elementary | Painting | Paint entire interior of school | $ 27,140 | $ 27,140 | $ 27,140 | |
2003 | Baltimore County | 03.167.03 | Middlesex Elementary | Painting | Paint entire interior of school | $ 29,040 | $ 29,040 | $ 29,040 | |
2003 | Baltimore City | 30.222.03 | #240 Graceland Park E./O'Donnell Heights | Flooring | Replace current flooring with VCT in twelve classrooms | $ 39,545 | $ 39,545 | $ 39,545 | |
2003 | Dorchester | 09.010.03 | Maple Elementary | Flooring | Floor covering replacement | $ 12,000 | $ 12,000 | $ 12,000 | |
2004 | Garrett | 11.002.04 | Friendsville Elementary | Replace Evaporative Condensers | $ 22,000 | $ 22,000 | $ 22,000 | ||
2004 | Garrett | 11.013.04 | Accident Elementary | Rooftop Unit Replacement | $ 11,448 | $ 11,448 | $ 11,448 | ||
2004 | Garrett | 11.006.04 | Broad Ford Elementary | Masonry Work and/or Repainting | $ 14,961 | $ 14,961 | $ 14,961 | ||
2004 | Garrett | 11.019.04 | Hickory Environmental Center | Fire Alarm Replacement | $ 22,000 | $ 22,000 | $ 22,000 | ||
2004 | Garrett | 11.016.04 | Swan Meadow Elementary/Middle | Window Replacement | $ 17,200 | $ 17,200 | $ 17,200 | ||
2004 | Washington | 21.017.04 | Northern Middle | Carpet/Tile Replacement | $ 40,000 | $ 26,410 | $ 26,410 | ||
2004 | Washington | 21.008.04 | Smithsburg Middle | Flooring | Overlay existing synthetic gym floor with new wood flooring. | $ 54,574 | $ 54,574 | $ 54,574 | |
2004 | Washington | 21.035.04 | Old Forge Elementary | Well Water Treatment System | $ 40,000 | $ 40,000 | $ 40,000 | ||
2004 | Washington | 21.043.04 | Fountain Rock Elementary | Well Water Treatment System | $ 40,000 | $ 40,000 | $ 40,000 | ||
2004 | Frederick | 10.001.04 | Middletown Elementary | Window Replacement | Phase VI | $ 35,150 | $ 23,770 | $ 23,770 | |
2004 | Frederick | 10.009.04 | Frederick High | Window Replacement | Phase V | $ 12,225 | $ 12,225 | $ 12,225 | |
2004 | Frederick | 10.004.04 | Lincoln "B" Elementary | Window Replacement | Phase II | $ 15,525 | $ 15,525 | $ 15,525 | |
2004 | Frederick | 10.030.04 | New Market Elementary | Window Replacement | Phase II | $ 22,925 | $ 22,925 | $ 22,925 | |
2004 | Frederick | 10.060.04 | Lewistown Elementary | Flooring Replacement | Phase 6, 7 and 8 | $ 20,555 | $ 10,555 | $ 10,555 | |
2004 | Harford | 12.050.04 | Southampton Middle | Cooling Tower Replacement | $ 120,000 | $ 120,000 | $ 120,000 | ||
2004 | Harford | 12.001.04 | Fallston High | Re-Asphalt of Bus Loop | $ 60,000 | $ 60,000 | $ 60,000 | ||
2004 | Harford | 12.009.04 | Edgewood High | Re-Asphalt Student Parking Area | $ 45,000 | $ 45,000 | $ 45,000 | ||
2004 | Baltimore City | 30.196.04 | #205 Woodhome E. | Flooring | Carpet replacement | $ 40,539 | $ 40,539 | $ 40,539 | |
2004 | Anne Arundel | 02.007.04 | Magothy River Middle | Flooring | Replace carpet and tile | $ 80,000 | $ 80,000 | $ 80,000 | |
2004 | Anne Arundel | 02.044.04 | George Fox Middle | Flooring | Replace carpet and tile | $ 80,000 | $ 80,000 | $ 80,000 | |
2004 | Anne Arundel | 02.042.04 | Southern Middle | Flooring | Replace carpet and tile | $ 53,000 | $ 53,000 | $ 53,000 | |
2004 | Anne Arundel | 02.014.04 | Central Special Education | Flooring | Replace carpet and tile | $ 42,000 | $ 42,000 | $ 42,000 | |
2004 | Anne Arundel | 02.008.04 | Linthicum Elementary | Flooring | Replace carpet and tile | $ 105,000 | $ 105,000 | $ 105,000 | |
2004 | Anne Arundel | 02.054.04 | North County High | Flooring | Replace carpet and tile | $ 121,000 | $ 121,000 | $ 121,000 | |
2004 | Anne Arundel | 02.020.04 | Glen Burnie High | Flooring | Replace carpet and tile | $ 75,000 | $ 75,000 | $ 75,000 | |
2004 | Prince George's | 16.042.04 | James E. Duckworth Special Education | Chiller Replacement | Replace (3) Reciprocating Air Cooled Split Chillers | $ 185,000 | $ 185,000 | $ 185,000 | |
2004 | Prince George's | 16.157.04 | Rose Valley Elementary | Boiler Replacement | Replace (2) Steam Boiler | $ 239,345 | $ 239,345 | $ 239,345 | |
2004 | Montgomery | 15.048.04 | Garrett Park Elementary | Sewer Injection Pumps | $ 39,000 | $ 39,000 | $ 55,498 | ||
2004 | Montgomery | 15.047.04 | Rock Terrace Special Education | Parking lot Resurfing | $ 30,000 | $ 30,000 | $ 21,352 | ||
2004 | Montgomery | 15.103.04 | Damascus Elementary | Parking lot Resurfing | $ 35,000 | $ 35,000 | $ 109,152 | ||
2004 | Montgomery | 15.179.04 | Cannon Road Elementary | Concrete sidewalk Replacement | $ 30,000 | $ 30,000 | $ 56,921 | ||
2004 | Montgomery | 15.231.04 | Argyle Middle | Concrete Sidewalk Replacement | $ 22,000 | $ 22,000 | $ 20,812 | ||
2004 | Montgomery | 15.105.04 | DuFief Elementary | Flooring | $ 61,000 | $ 61,000 | $ 61,818 | ||
2004 | Montgomery | 15.042.04 | Ridgeview Middle | Flooring | $ 45,000 | $ 45,000 | $ 47,399 | ||
2004 | Montgomery | 15.081.04 | Takoma Park Elementary | Flooring | Replace gym floor | $ 30,000 | $ 30,000 | $ 26,688 | |
2004 | Montgomery | 15.090.04 | Damascus High | Resurface Running Track | $ 30,000 | $ 30,000 | $ 28,553 | ||
2004 | Montgomery | 15.130.04 | Gaithersburg High | Resurface Running Track | $ 30,000 | $ 30,000 | $ 39,555 | ||
2004 | Montgomery | 15.067.04 | Walter Johnson High | Resurface Running Track | $ 70,000 | $ 70,000 | $ 90,024 | ||
2004 | Montgomery | 15.141.04 | Wheaton High | Lighting | Stage dimmer panel replacement | $ 50,000 | $ 50,000 | $ 89,422 | |
2004 | Montgomery | 15.023.04 | Thomas S. Wootton High | Lighting | Stage Dimmer Panel; replace failed and obsolete pan | $ 50,000 | $ 50,000 | $ 59,885 | |
2004 | Montgomery | 15.209.04 | Cabin John Middle | Lighting | Replace stage dimmer panel | $ 20,000 | $ 20,000 | $ 23,889 | |
2004 | Queen Anne's | 17.004.04 | Centreville Middle | Rooftop Unit Replacement | Replacement of rooftop unit #7- over music/art/band | $ 85,000 | $ 85,000 | $ 85,000 | |
2004 | Montgomery | 15.145.04 | Bradley Hills Elementary | Concrete Sidewalk Replacement | $ 20,000 | $ 20,000 | $ 16,625 | ||
2004 | Montgomery | 15.197.04 | Farquhar Middle | Concrete Sidewalk Replacement | $ 30,000 | $ 30,000 | $ 26,504 | ||
2004 | Montgomery | 15.072.04 | Twinbrook Elementary | P.A. System Replacement | $ 20,000 | $ 20,000 | $ 36,577 | ||
2004 | Montgomery | 15.230.04 | Francis Scott Key Middle | Concrete Sidewalk Replacement | $ 30,000 | $ 30,000 | $ 116,535 | ||
2004 | Montgomery | 15.194.04 | Maryvale Elementary | Concrete Sidewalk Replacement | $ 35,000 | $ 35,000 | $ 31,666 | ||
2004 | Montgomery | 15.110.04 | Potomac Elementary | Concrete Sidewalk Replacement | $ 20,000 | $ 20,000 | $ 14,834 | ||
2004 | Montgomery | 15.210.04 | Tilden Center | Concrete Sidewalk Replacement | $ 20,000 | $ 20,000 | $ 17,849 | ||
2004 | Montgomery | 15.201.04 | Cresthaven Elementary | Fencing Replacement | $ 15,000 | $ 15,000 | $ 14,976 | ||
2004 | Montgomery | 15.040.04 | Fallsmead Elementary | Fencing Replacement | $ 20,000 | $ 20,000 | $ 15,249 | ||
2004 | Montgomery | 15.211.04 | Paint Branch High | Door Replacement | Replace exterior doors | $ 37,000 | $ 37,000 | $ 36,946 | |
2004 | Montgomery | 15.222.04 | Carl Sandburg Learning Center | Parking lot Resurfing | $ 41,000 | $ 41,000 | $ 45,975 | ||
2004 | Allegany | 01.021.04 | South Penn Elementary | Boiler/Domestic Water Heater Replacement | $ 205,000 | $ 205,000 | $ 205,000 | ||
2004 | Allegany | 01.004.04 | John Humbird Elementary | Flooring | Carpet Replacement | $ 61,000 | $ 60,000 | $ 60,000 | |
2004 | St. Mary's | 18.008.04 | Leonardtown Elementary | Roof | Ballasting of the Roof | $ 45,000 | $ 45,000 | $ 45,000 | |
2004 | St. Mary's | 18.004.04 | Leonardtown High | Flooring | Gymnasium Floor Refinishing | $ 40,000 | $ 40,000 | $ 40,000 | |
2004 | Kent | 14.006.04 | Garnett Elementary | Underground Fuel Storage Tank Replacement | $ 51,068 | $ 51,068 | $ 51,068 | ||
2004 | Harford | 12.040.04 | Joppatowne Elementary | Fire Alarm Replacement | $ 50,000 | $ 50,000 | $ 50,000 | ||
2004 | Harford | 12.013.04 | William S. James Elementary | Fire Alarm Replacement | $ 90,000 | $ 90,000 | $ 90,000 | ||
2004 | Harford | 12.026.04 | North Harford Elementary | Re-Asphalt of Bus Loop | $ 35,000 | $ 35,000 | $ 35,000 | ||
2004 | Charles | 08.008.04 | Indian Head Elementary | Flooring | Media Center carpet/VCT replacement | $ 97,207 | $ 65,000 | $ 65,000 | |
2004 | Baltimore City | 30.137.04 | #049 Northeast M. | Painting | Paint entire interior | $ 50,000 | $ 50,000 | $ 50,000 | |
2004 | Baltimore City | 30.137.04 | #049 Northeast M. | Flooring | Replace carpet with VCT in self contained classrooms | $ 25,000 | $ 25,000 | $ 25,000 | |
2004 | Baltimore City | 30.137.04 | #049 Northeast M. | Door and hardware Replacement | Replace exterior doors and hardware and interior fire doors and hardware. | $ 200,319 | $ 200,319 | $ 200,319 | |
2004 | Washington | 21.026.04 | Smithsburg High | Bleachers Replacement | Replace existing Gym bleachers (1967) that do not meet A.D.A. requirements. | $ 39,000 | $ 39,000 | $ 39,000 | |
2004 | Baltimore County | 03.160.04 | Arbutus Elementary | Electrical | Replace main breaker | $ 40,000 | $ 40,000 | $ 40,000 | |
2004 | Baltimore County | 03.005.04 | Halethorpe Elementary | Door and Frame Replacement | Replace exterior door and frame | $ 116,700 | $ 116,700 | $ 116,700 | |
2004 | Baltimore County | 03.008.04 | Western School of Technology/Science | Fire Alarm System replacement | $ 212,766 | $ 212,766 | $ 212,766 | ||
2004 | Baltimore County | 03.184.04 | Riverview Elementary | Structural Repairs | Repair structural footing | $ 45,000 | $ 45,000 | $ 45,000 | |
2004 | Baltimore County | 03.105.04 | Lansdowne Elementary | Repair structural | $ 75,000 | $ 75,000 | $ 75,000 | ||
2004 | Baltimore County | 03.102.04 | Featherbed Lane Elementary | Intercom System Replacement | $ 18,000 | $ 18,000 | $ 18,000 | ||
2004 | Baltimore County | 03.098.04 | Milford Mill Academy | Intercom System Replacement | $ 49,500 | $ 49,500 | $ 49,500 | ||
2004 | Baltimore County | 03.115.04 | Old Court Middle | Lighting Replacement | Interior | $ 75,000 | $ 75,000 | $ 75,000 | |
2004 | Baltimore County | 03.032.04 | Randallstown High | Lighting Upgrade | Replace and Upgrade Gym Lighting | $ 136,646 | $ 136,646 | $ 136,646 | |
2004 | Baltimore County | 03.006.04 | Cockeysville Middle | Fire Alarm System Upgrade | $ 115,480 | $ 115,480 | $ 115,480 | ||
2004 | Baltimore County | 03.150.04 | Franklin Elementary | Lighting Upgrade | Interior Lighting Upgrade/Replace | $ 75,000 | $ 75,000 | $ 75,000 | |
2004 | Baltimore County | 03.120.04 | Franklin High | Lighting Replacement | Replace Activity Room Lighting | $ 18,000 | $ 18,000 | $ 18,000 | |
2004 | Baltimore County | 03.013.04 | Prettyboy Elementary | Install Fire Control Tank and Pump | $ 139,000 | $ 139,000 | $ 139,000 | ||
2004 | Baltimore County | 03.178.04 | Fifth District Elementary | Install Fire Control Tank and Pump | $ 145,500 | $ 145,500 | $ 145,500 | ||
2004 | Baltimore County | 03.133.04 | Dulaney High | Door and Frame Replacement | Exterior | $ 173,450 | $ 173,450 | $ 173,450 | |
2004 | Baltimore County | 03.049.04 | Dumbarton Middle | Lighting Upgrade | Exterior Lighting Upgrade | $ 30,000 | $ 30,000 | $ 30,000 | |
2004 | Baltimore County | 03.154.04 | Loch Raven Technical Academy | Fire Alarm System Upgrade | $ 132,400 | $ 132,400 | $ 132,400 | ||
2004 | Baltimore County | 03.022.04 | Stoneleigh Elementary | Folding Partition Replacement | Replace Folding Partition Wall | $ 16,000 | $ 16,000 | $ 16,000 | |
2004 | Baltimore County | 03.003.04 | Chesapeake High | Lighting Replacement | Replace Gym Lighting | $ 35,000 | $ 35,000 | $ 35,000 | |
2004 | Baltimore County | 03.075.04 | Eastern Technical High | Ceiling Replacement | Replace Activity Room Ceiling | $ 40,000 | $ 40,000 | $ 40,000 | |
2004 | Baltimore County | 03.192.04 | Middleborough Elementary | Door and Frame Replacement | Exterior Door and Frame Replacement | $ 113,000 | $ 113,000 | $ 113,000 | |
2004 | Baltimore County | 03.161.04 | Carroll Manor Elementary | Install Fire Control Tank and Pump | $ 162,600 | $ 162,600 | $ 162,600 | ||
2004 | Baltimore County | 03.165.04 | Overlea High | Flooring | Refinish Stage Floor | $ 13,000 | $ 13,000 | $ 13,000 | |
2004 | Baltimore County | 03.121.04 | Parkville High | Lighting Upgrade | Exterior | $ 15,000 | $ 15,000 | $ 15,000 | |
2004 | Baltimore County | 03.001.04 | Pine Grove Middle | New Cooling Tower and Support Equipment | $ 185,000 | $ 185,000 | $ 185,000 | ||
2004 | Baltimore County | 03.172.04 | Battle Monument Special Education | Unit Ventilator Replacement | Replace various unit ventilators | $ 160,000 | $ 160,000 | $ 160,000 | |
2004 | Baltimore County | 03.151.04 | Colgate Elementary | Ceiling Replacement | Replace Cafeteria Ceiling | $ 18,000 | $ 18,000 | $ 18,000 | |
2004 | Baltimore County | 03.116.04 | Battle Grove Elementary | Lighting Upgrade | Exterior | $ 45,000 | $ 45,000 | $ 45,000 | |
2004 | Baltimore County | 03.051.04 | Sparrows Point Middle/High | Intercom Upgrade | Combine and Update Intercoms | $ 40,000 | $ 40,000 | $ 40,000 | |
2004 | Baltimore City | 30.144.04 | #013 Tench Tilghman E. | Flooring | Repair and refinish gym floor | $ 25,000 | $ 25,000 | $ 25,000 | |
2004 | Baltimore City | 30.144.04 | #013 Tench Tilghman E. | Carpet Replacement | Replace carpet with VCT throughout school | $ 40,000 | $ 40,000 | $ 40,000 | |
2004 | Baltimore City | 30.206.04 | #046 Chinquapin M. | Restroom replacement | $ 40,000 | $ 40,000 | $ 40,000 | ||
2004 | Baltimore City | 30.260.04 | #054 Barclay E./M. | Lighting Replacement | Replace lighting in hallways, cafeteria and auditorium. | $ 35,000 | $ 35,000 | $ 35,000 | |
2004 | Baltimore City | 30.260.04 | #054 Barclay E./M. | Bathroom Renovation | $ 134,394 | $ 134,394 | $ 134,394 | ||
2004 | Baltimore City | 30.260.04 | #054 Barclay E./M. | Gym Renovation | $ 55,000 | $ 55,000 | $ 55,000 | ||
2004 | Baltimore City | 30.165.04 | #056 Robert Poole M. | Gym renovation | $ 50,000 | $ 50,000 | $ 50,000 | ||
2004 | Baltimore City | 30.165.04 | #056 Robert Poole M. | Repair walls and paint in the stairwells, hallways, lockers, boys and girls locker rooms and bathrooms. | $ 50,000 | $ 50,000 | $ 50,000 | ||
2004 | Baltimore City | 30.135.04 | #064 Liberty E. | Painting | Paint the entire interior | $ 60,000 | $ 60,000 | $ 60,000 | |
2004 | Baltimore City | 30.135.04 | #064 Liberty E. | Gym renovation | $ 25,000 | $ 25,000 | $ 25,000 | ||
2004 | Baltimore City | 30.243.04 | #095 Franklin Square E. | Door and frame Replacement | Replace exterior doors and frames | $ 50,000 | $ 50,000 | $ 50,000 | |
2004 | Baltimore City | 30.243.04 | #095 Franklin Square E. | Gym Renovation | $ 30,000 | $ 30,000 | $ 30,000 | ||
2004 | Baltimore City | 30.275.04 | #102 Thomas G. Hayes E. | Replace damaged catch basin and related piping | $ 40,000 | $ 40,000 | $ 40,000 | ||
2004 | Baltimore City | 30.196.04 | #205 Woodhome E. | Oil Tank Replacement | Replace Oil Tank | $ 65,000 | $ 65,000 | $ 65,000 | |
2004 | Baltimore City | 30.196.04 | #205 Woodhome E. | Painting | Paint entire interior | $ 80,000 | $ 80,000 | $ 80,000 | |
2004 | Baltimore City | 30.196.04 | #205 Woodhome E. | Gym renovation | $ 25,000 | $ 25,000 | $ 25,000 | ||
2004 | Baltimore City | 30.196.04 | #205 Woodhome E. | Door and frame Replacement | Replace exterior doors and frames | $ 115,687 | $ 115,687 | $ 115,687 | |
2004 | Baltimore City | 30.173.04 | #209 Winston M. | Replace concrete sidewalk, curbing and repave driveway at main entrance. | $ 60,000 | $ 60,000 | $ 60,000 | ||
2004 | Baltimore City | 30.086.04 | #228 John Ruhrah E. | Flooring | Replace carpet with VCT throughout school | $ 50,000 | $ 50,000 | $ 50,000 | |
2004 | Baltimore City | 30.086.04 | #228 John Ruhrah E. | Painting | Paint entire interior | $ 80,000 | $ 80,000 | $ 80,000 | |
2004 | Baltimore City | 30.229.04 | #242 Northwood E. | Painting | Paint entire permanent modular building | $ 15,000 | $ 15,000 | $ 15,000 | |
2004 | Baltimore City | 30.229.04 | #242 Northwood E. | Renovate boys and girls bathrooms in permanent modular building. | $ 15,000 | $ 15,000 | $ 15,000 | ||
2004 | Baltimore City | 30.229.04 | #242 Northwood E. | Lighting Replacement | Replace lighting in permanent modular building | $ 15,000 | $ 15,000 | $ 15,000 | |
2004 | Baltimore City | 30.229.04 | #242 Northwood E. | Door Replacement | Replace exterior and interior doors in permanent modular building. | $ 20,000 | $ 20,000 | $ 20,000 | |
2004 | Baltimore City | 30.257.04 | #251 Callaway E. | Gym renovation | $ 35,000 | $ 35,000 | $ 35,000 | ||
2004 | Baltimore City | 30.257.04 | #251 Callaway E. | Flooring | Carpet replacement | $ 60,000 | $ 60,000 | $ 60,000 | |
2004 | Baltimore City | 30.257.04 | #251 Callaway E. | Door and frame Replacement | Replace exterior doors and frames | $ 111,914 | $ 111,914 | $ 111,914 | |
2004 | Baltimore City | 30.134.04 | #256 Calvin Rodwell E. | Flooring | Replace carpet with VCT throughout school | $ 25,000 | $ 25,000 | $ 25,000 | |
2004 | Baltimore City | 30.164.04 | #405 Patterson H. | Parking lot resurfacing | Parking lot resurfacing and speed bump installation | $ 90,000 | $ 90,000 | $ 90,000 | |
2004 | Baltimore City | 30.164.04 | #405 Patterson H. | Water Service Replacement | Replace water service main line | $ 80,000 | $ 80,000 | $ 80,000 | |
2004 | Talbot | 20.001.04 | St. Michaels Elementary | Playground | New playground to serve pre-kindergarten through 6th grade students. | $ 95,700 | $ 89,700 | $ 89,700 | |
2004 | Talbot | 20.008.04 | St. Michaels Middle/High | Improvements to include tennis court fencing and wind screen, permanent field hockey and soccer benches, field bleachers, permanent batting cage for baseball field foul poles, softball field fencing, and installation of an irrigation system for the baseball infield. | $ 63,300 | $ 65,300 | $ 65,300 | ||
2004 | Kent | 14.003.04 | Chestertown Middle | Asbestos Abatement | $ 16,500 | $ 13,392 | $ 13,392 | ||
2004 | Cecil | 07.012.04 | North East Middle | Chiller Replacement | Water-cooled chiller unit replacement | $ 290,000 | $ 290,000 | $ 290,000 | |
2004 | Carroll | 06.003.04 | Westminster Elementary | Asbestos removal and replacement | $ 114,972 | $ 114,972 | $ 114,972 | ||
2004 | Carroll | 06.042.04 | Westminster High | Cooling Tower Replacement | $ 60,000 | $ 60,000 | $ 60,000 | ||
2004 | Carroll | 06.012.04 | South Carroll High | Asbestos removal and carpet replacement | $ 168,897 | $ 168,897 | $ 168,897 | ||
2004 | Somerset | 19.014.04 | Greenwood Middle | Unit ventilator Replacement | Replace unit ventilators in Cafeteria/auditorium, Family Living and Art rooms, 4/5 units. | $ 42,000 | $ 42,000 | $ 42,000 | |
2004 | Somerset | 19.003.04 | J. M. Tawes Vo-Tech | Parking Lot | Add 20 parking spaces to lot to accommodate parents and visitors. | $ 13,000 | $ 13,000 | $ 13,000 | |
2004 | Worcester | 23.012.04 | Berlin Intermediate | Plumbing, water and/or sewer lines and fixtures. Replace 10K gallon water heater. Remove existing water heater and install six new water heaters for gym, cafeteria and eight restrooms. | $ 28,880 | $ 22,617 | $ 22,617 | ||
2004 | Worcester | 23.002.04 | Pocomoke Elementary | Flooring | Remove existing carpet in two classroom pods and Computer Labs. Provide and install new vinyl composition tile. | $ 15,201 | $ 15,201 | $ 15,201 | |
2004 | Prince George's | 16.010.04 | Central High | Steam Boiler Replacement | $ 488,000 | $ 488,000 | $ 488,000 | ||
2004 | Wicomico | 22.021.04 | Bennett Middle | P.A. System Replacement | $ 18,000 | $ 18,000 | $ 18,000 | ||
2004 | Wicomico | 22.008.04 | James. M. Bennett High | Install ceiling fans in old shop areas for classroom | $ 14,000 | $ 14,000 | $ 14,000 | ||
2004 | Wicomico | 22.008.04 | James. M. Bennett High | Folding Partition Replacement | Replace folding partition and make open classroom more usable. | $ 13,000 | $ 13,000 | $ 13,000 | |
2004 | Wicomico | 22.009.04 | Wicomico High | Systemic improvements to address accessibility deficiencies. | $ 87,308 | $ 87,308 | $ 87,308 | ||
2004 | Wicomico | 22.009.04 | Wicomico High | Lighting | Replace the original lighting control panel | $ 40,000 | $ 40,000 | $ 40,000 | |
2004 | Wicomico | 22.015.04 | Wicomico Middle | Flooring | Refinish the original wood gym floor | $ 25,000 | $ 25,000 | $ 25,000 | |
2004 | Wicomico | 22.005.04 | Beaver Run Elementary | Carpet Replacement | Replace the existing carpet in the Media Center. | $ 25,000 | $ 25,000 | $ 25,000 | |
2004 | Wicomico | 22.002.04 | Pinehurst Elementary | Carpet Replacement | Replace the existing carpets in several rooms with VCT. | $ 75,000 | $ 75,000 | $ 75,000 | |
2004 | Wicomico | 22.018.04 | Mardela Middle/High | Carpet Replacement | Replace the existing Media Center carpet and several classrooms with VCT. | $ 70,000 | $ 70,000 | $ 70,000 | |
2004 | Cecil | 07.041.04 | Leeds Elementary | Flooring | Ceramic floor replacement with new vinyl floor tile | $ 30,000 | $ 30,000 | $ 30,000 | |
2004 | Allegany | 01.034.04 | Washington Middle | Fire Alarm Replacement | Replace fire alarm | $ 150,000 | $ 145,000 | $ 145,000 | |
2004 | Cecil | 07.040.04 | North East High | Waterproof and finish painting the interior concrete walls of four stand alone stairwells | $ 55,000 | $ 55,000 | $ 55,000 | ||
2004 | Howard | 13.016.04 | Hammond High | Door and Hardware Replacement | Replace rusted out, damaged, old doors, frames, an | $ 65,000 | $ 65,000 | $ 65,000 | |
2004 | Dorchester | 09.012.04 | South Dorchester Elementary/Middle | Carpet Replacement | Replace 30-year-old carpet in elementary school portion of building, abate and replace original sheet flooring in elementary school portion of building. One (1) leaking and deteriorated door/window and frame needs to be replaced to protect the new floor coverings. | $ 39,000 | $ 39,000 | $ 39,000 | |
2004 | Dorchester | 09.014.04 | Hurlock Elementary | Carpet Replacement | Replace 24-year-old original carpet floor coverings in pods 2 and 4. | $ 26,000 | $ 26,000 | $ 26,000 | |
2004 | Worcester | 23.002.04 | Pocomoke Elementary | Flooring | Remove existing carpet in two classroom pods. Provide and install new vinyl composition tile. | $ 14,116 | $ 14,116 | $ 14,116 | |
2004 | Worcester | 23.001.04 | Showell Elementary | Flooring | Remove existing carpet in two classroom pods. Provide and install new vinyl composition tile. | $ 13,066 | $ 13,066 | $ 13,066 | |
2004 | Calvert | 04.006.04 | Northern Middle | Carpet Replacement | Carpet in this building is 15 years old. The condition of this carpet has deteriorated to a point that it presents a safety hazard. Approximately 3,200 yards of carpet will be replaced in this project. | $ 92,000 | $ 65,000 | $ 65,000 | |
2004 | Caroline | 05.002.04 | North Caroline High | Partial Roof Replacement | Industrial Arts/Technology area- Partial Re-Roof | $ 85,000 | $ 85,000 | $ 85,000 | |
2004 | Montgomery | 15.243.04 | Carderock Springs Elementary | Repair Concrete Foundation | Concrete foundation cracks causing water leaks into the building. | $ 15,000 | $ 15,000 | $ 14,196 | |
2004 | Montgomery | 15.144.04 | Gaithersburg Elementary | Repair Concrete Foundation | Concrete foundation cracks causing water leaks into the building. | $ 12,000 | $ 12,000 | $ 10,280 | |
2004 | Montgomery | 15.146.04 | Washington Grove Elementary | Repair Concrete Foundation | Concrete foundation cracks causing water leaks into the building. | $ 10,000 | $ 10,000 | $ 12,258 | |
2004 | Baltimore County | 03.011.04 | Perry Hall High | Air Handling Unit Replacement | Replace 3 Air Handling Units | $ 150,000 | $ 150,000 | $ 150,000 | |
2004 | Prince George's | 16.010.04 | Central High | Painting | Paint entire interior and exterior of building | $ 155,678 | $ 155,678 | $ 155,678 | |
2004 | Baltimore City | 30.135.04 | Liberty E. #064 | Flooring | replace carpet with VCT throughout school | $ 25,000 | $ 25,000 | $ 25,000 | |
2004 | Montgomery | 15.066.04 | Poolesville High | Resurface running track | $ 30,000 | $ 30,000 | $ 26,561 | ||
2005 | Dorchester | 09.011.05 | Warwick Elementary | Playground Equipment | Replacing outdated and/or unsafe play equipment. | $ 41,666 | $ 21,666 | $ 21,666 | |
2005 | Dorchester | 09.005.05 | Vienna Elementary | Playground Equipment | Replacing outdated and/or unsafe play equipment. | $ 25,634 | $ 21,666 | $ 21,666 | |
2005 | Dorchester | 09.012.05 | South Dorchester Elementary/Middle | Playground Equipment | Replacing outdated and/or unsafe play equipment. | $ 29,666 | $ 21,666 | $ 21,666 | |
2005 | Garrett | 11.008.05 | Southern Middle | Ceiling Tile Replacement | Replacement of original ceiling tile | $ 104,000 | $ 85,000 | $ 85,000 | |
2005 | Kent | 14.006.05 | Garnett Elementary | Window Replacement | Replace original steel frame single glazed windows (circa 1950) with new thermally efficient windows and frames. | $ 76,000 | $ 65,000 | $ 65,000 | |
2005 | Montgomery | 15.061.05 | Weller Road Elementary | Floor Replacement | Synthetic flooring material cracked and loose and causing safety issues. | $ 31,000 | $ 31,000 | $ 32,536 | |
2005 | Montgomery | 15.043.05 | Lake Seneca Elementary | Window and Door Replacement | Original rusted badly and causing security issues. | $ 37,000 | $ 37,000 | $ 36,930 | |
2005 | Montgomery | 15.090.05 | Damascus High | Repair Concrete Foundation | Cracks causing water leaks into the building. | $ 35,000 | $ 35,000 | $ 34,470 | |
2005 | Montgomery | 15.151.05 | Christa McAuliffe Elementary | Repair Concrete Foundation | Cracks causing water leaks into the building. | $ 11,000 | $ 11,000 | $ 10,592 | |
2005 | Montgomery | 15.153.05 | Waters Landing Elementary | Repair Concrete Foundation | Cracks causing water leaks into the building. | $ 12,000 | $ 12,000 | $ 11,950 | |
2005 | Montgomery | 15.045.05 | Col. Zadok Magruder High | Window and Door Replacement | Original rusted badly and causing security issues. | $ 99,000 | $ 99,000 | $ 98,856 | |
2005 | Montgomery | 15.147.05 | Flower Hill Elementary | Window and Door Replacement | Original rusted badly and causing security issues. | $ 32,000 | $ 32,000 | $ 32,142 | |
2005 | Montgomery | 15.208.05 | Burnt Mills Elementary | Window and Door Replacement | Original rusted badly and causing security issues. | $ 73,000 | $ 73,000 | $ 73,906 | |
2005 | Montgomery | 15.051.05 | Darnestown Elementary | Emergency Generator Installation | Install new EG to address failed battery back-up emergency lighting and improve safety during power failures. | $ 98,000 | $ 98,000 | $ 98,132 | |
2005 | Montgomery | 15.209.05 | Cabin John Middle | Exterior Concrete Replacement | To address cracked and unsafe sidewalks. | $ 25,000 | $ 25,000 | $ 24,843 | |
2005 | Montgomery | 15.230.05 | Francis Scott Key Middle | Exterior Concrete Replacement | To address cracked and unsafe sidewalks. | $ 50,000 | $ 50,000 | $ 50,921 | |
2005 | Montgomery | 15.019.05 | Seneca Valley High | Exterior Concrete Replacement | Replace concrete to address cracked and unsafe sidewalks. | $ 20,000 | $ 20,000 | $ 10,426 | |
2005 | Montgomery | 15.125.05 | Tilden Middle | Exterior Concrete Replacement | To address cracked and unsafe sidewalks. | $ 38,000 | $ 38,000 | $ 34,601 | |
2005 | Montgomery | 15.150.05 | Jones Lane Elementary | Interior Painting | Paint in poor condition, last painted 1986. | $ 33,000 | $ 33,000 | $ 21,279 | |
2005 | Montgomery | 15.148.05 | Clopper Mill Elementary | Interior Painting | Paint in poor condition, last painted 1986. | $ 33,000 | $ 33,000 | $ 19,050 | |
2005 | Montgomery | 15.151.05 | Christa McAuliffe Elementary | Interior Painting | Paint in poor condition, last painted 1987. | $ 33,000 | $ 33,000 | $ 19,590 | |
2005 | Montgomery | 15.208.05 | Burnt Mills Elementary | Floor Replacement and Related Asbestos Abatement | In several classrooms due to missing loose tile. | $ 23,000 | $ 23,000 | $ 24,192 | |
2005 | Montgomery | 15.040.05 | Fallsmead Elementary | Floor Replacement and Related Asbestos Abatement | Existing tile and carpet are worn-out throughout the building. | $ 75,000 | $ 75,000 | $ 23,197 | |
2005 | Montgomery | 15.194.05 | Maryvale Elementary | Floor Replacement and Related Asbestos Abatement | In several classrooms due to missing, broken and loose tile. | $ 60,000 | $ 60,000 | $ 55,988 | |
2005 | Montgomery | 15.019.05 | Seneca Valley High | Flooring | Carpet and Tile in IMC, Music Room worn-out. | $ 20,000 | $ 20,000 | $ 49,205 | |
2005 | Montgomery | 15.153.05 | Waters Landing Elementary | Floor Replacement and Related Asbestos Abatement | In several classrooms due to missing, broken and loose tile. | $ 50,000 | $ 50,000 | $ 13,055 | |
2005 | Montgomery | 15.145.05 | Bradley Hills Elementary | Plumbing Fixture Replacements | Toilet room fixtures have repeated failures and drain piping is damaged and needs replaced. | $ 44,000 | $ 44,000 | $ 36,488 | |
2005 | Montgomery | 15.022.05 | Benjamin Banneker Middle | Locker Replacement | Boys and Girls Lockers rusted and damaged and several not useable. | $ 60,000 | $ 60,000 | $ 55,092 | |
2005 | Montgomery | 15.243.05 | Carderock Springs Elementary | Asphalt Replacement | Parking lot and play area | $ 45,000 | $ 45,000 | $ 40,871 | |
2005 | Montgomery | 15.242.05 | Farmland Elementary | P.A. System Replacement | Due to repeated failures and inability to secure repair parts. | $ 23,000 | $ 23,000 | $ 26,577 | |
2005 | Montgomery | 15.150.05 | Jones Lane Elementary | Asphalt Replacement | Parking lot and play area in poor condition, has exceeded product life-cycle. | $ 60,000 | $ 60,000 | $ 60,440 | |
2005 | Montgomery | 15.194.05 | Maryvale Elementary | Fencing Replacement | Existing Fencing is rusted and damaged beyond repair. | $ 50,000 | $ 50,000 | $ 27,992 | |
2005 | Queen Anne's | 17.004.05 | Centreville Middle | Communication System | Replace failing P.A. System installed during the initial construction of the building in 1978. | $ 25,000 | $ 25,000 | $ 25,000 | |
2005 | Queen Anne's | 17.006.05 | Stevensville Middle | Carpeting | Replace carpet in Media Center and Administration area. 1980 Replace carpet in corridors with tile 1990. | $ 36,000 | $ 36,000 | $ 36,000 | |
2005 | Queen Anne's | 17.006.05 | Stevensville Middle | Painting and Locker Repair | Lockers have had general maintenance since 1980, but need to be painted and major repairs done. | $ 24,000 | $ 24,000 | $ 24,000 | |
2005 | St. Mary's | 18.014.05 | Mechanicsville Elementary | Well Replacement | $ 25,000 | $ 25,000 | $ 25,000 | ||
2005 | St. Mary's | 18.018.05 | Loveville Building | Well Replacement | $ 20,000 | $ 20,000 | $ 20,000 | ||
2005 | St. Mary's | 18.023.05 | Greenview Knolls Elementary | Lighting | Installation of security site lighting. | $ 40,000 | $ 40,000 | $ 40,000 | |
2005 | Baltimore City | 30.137.05 | #049 Northeast M. | Partitions Installation | Install partitions in open areas | $ 150,000 | $ 150,000 | $ 150,000 | |
2005 | Baltimore City | 30.137.05 | #049 Northeast M. | Door Replacement | Replace classroom doors in entire school | $ 50,000 | $ 50,000 | $ 50,000 | |
2005 | Worcester | 23.004.05 | Stephen Decatur High | Site Development | Remove existing resolite running track surface. Provide new asphalt surface and polyurethane track surface. | $ 65,000 | $ 65,000 | $ 65,000 | |
2005 | Allegany | 01.020.05 | Flintstone Elementary | Boiler and Chiller Replacement | $ 369,300 | $ 355,000 | $ 355,000 | ||
2005 | Frederick | 10.060.05 | Lewistown Elementary | Flooring Replacement | Phase IX | $ 15,460 | $ 10,000 | $ 10,000 | |
2005 | Frederick | 10.004.05 | Lincoln "B" Elementary | Window Replacement | Phase III | $ 27,825 | $ 27,825 | $ 27,825 | |
2005 | Frederick | 10.030.05 | New Market Elementary | Window Replacement | Phase III | $ 47,325 | $ 47,175 | $ 47,175 | |
2005 | Montgomery | 15.019.05 | Seneca Valley High | Fencing | Replace rusted fencing and gates to address safety and security issues. | $ 10,500 | $ 10,500 | $ 11,089 | |
2005 | Montgomery | 15.019.05 | Seneca Valley High | Restroom Partitions | Existing metal partitions are in poor condition and badly rusted and bent. | $ 13,700 | $ 13,700 | $ 13,623 | |
2005 | Baltimore City | 30.040.05 | Lemmel M. | Door Replacement | Replace 41 exterior doors and 4 interior doors | $ 120,000 | $ 120,000 | $ 120,000 | |
2005 | Caroline | 05.003.05 | Denton Elementary | Playground Equipment | $ 34,970 | $ 33,000 | $ 33,000 | ||
2005 | Caroline | 05.008.05 | Preston Elementary | Playground Equipment | $ 34,000 | $ 32,000 | $ 32,000 | ||
2005 | Caroline | 05.006.05 | Ridgely Elementary | P. A. System | $ 20,000 | $ 20,000 | $ 20,000 | ||
2005 | Baltimore County | 03.160.05 | Arbutus Elementary | Boiler Replacement | $ 247,574 | $ 205,574 | $ 205,574 | ||
2005 | Harford | 12.011.05 | Youth's Benefit Elementary | Fire Alarm Replacement | $ 55,000 | $ 55,000 | $ 55,000 | ||
2005 | Harford | 12.025.05 | John Archer Special Education | Cooling tower Replacement | $ 80,000 | $ 80,000 | $ 80,000 | ||
2005 | Harford | 12.003.05 | William Paca/Old Post Road Elementary | Sanitary Repair | $ 43,000 | $ 43,000 | $ 43,000 | ||
2005 | Anne Arundel | 02.045.05 | Crofton Meadows Elementary | Flooring | carpet and tile replacement | $ 75,000 | $ 75,000 | $ 75,000 | |
2005 | Anne Arundel | 02.047.05 | Windsor Farms Elementary | Flooring | carpet and tile replacement | $ 65,000 | $ 65,000 | $ 65,000 | |
2005 | Anne Arundel | 02.020.05 | Glen Burnie High | Flooring | carpet and tile replacement | $ 70,000 | $ 70,000 | $ 70,000 | |
2005 | Anne Arundel | 02.006.05 | Center of Applied Technology North | Flooring | carpet and tile replacement | $ 35,000 | $ 35,000 | $ 35,000 | |
2005 | Anne Arundel | 02.087.05 | MacArthur Middle | Fire alarm Replacement | Replace fire alarm | $ 250,000 | $ 250,000 | $ 250,000 | |
2005 | Anne Arundel | 02.006.05 | Center of Applied Technology North | Door Replacement | Overhead door replacement | $ 75,000 | $ 75,000 | $ 75,000 | |
2005 | Charles | 08.005.05 | General Smallwood Middle | Building entrance improvements including doors/hardware, pedestrian circulation and canopy. | $ 361,800 | $ 65,000 | $ 65,000 | ||
2005 | Talbot | 20.002.05 | Easton High | greenhouse and aquaculture addition - see attached letter | $ 104,754 | $ 104,754 | $ 104,754 | ||
2005 | Prince George's | 16.016.05 | Thomas Stone Elementary | Boiler Replacement | Replace (3) steam boilers with pumps, controls, etc. to current design standards. | $ 250,350 | $ 250,350 | $ 250,350 | |
2005 | Baltimore County | 03.149.05 | Lansdowne High | Fire Alarm System | $ 389,250 | $ 389,250 | $ 389,250 | ||
2005 | Baltimore County | 03.027.05 | Winfield Elementary | Chiller Replacement | $ 375,000 | $ 375,000 | $ 375,000 | ||
2005 | Baltimore County | 03.085.05 | Pikesville Middle | Lighting | gym lighting | $ 35,000 | $ 35,000 | $ 35,000 | |
2005 | Baltimore County | 03.092.05 | Powhatan Elementary | Lighting | exterior lighting | $ 25,000 | $ 25,000 | $ 25,000 | |
2005 | Baltimore County | 03.094.05 | Hereford High | Water heaters/Tanks Replacement | replace all existing water heaters/tanks in school | $ 139,150 | $ 139,150 | $ 139,150 | |
2005 | Baltimore County | 03.154.05 | Loch Raven Technical Academy | Lighting | replace/upgrade corridor lighting | $ 125,000 | $ 125,000 | $ 125,000 | |
2005 | Baltimore County | 03.095.05 | George Washington Carver Center for Arts & Technology | Door Replacement | boards and exterior door replacement | $ 381,937 | $ 381,937 | $ 381,937 | |
2005 | Baltimore County | 03.095.05 | George Washington Carver Center for Arts & Technology | Locker Replacement | $ 113,600 | $ 113,600 | $ 113,600 | ||
2005 | Baltimore County | 03.011.05 | Perry Hall High | Chiller Replacement | $ 319,768 | $ 299,768 | $ 299,768 | ||
2005 | Baltimore County | 03.003.05 | Chesapeake High | Fire Alarm System | $ 199,305 | $ 189,305 | $ 189,305 | ||
2005 | Baltimore County | 03.121.05 | Parkville High | Seating Replacement | Replace auditorium seating | $ 250,941 | $ 246,941 | $ 246,941 | |
2005 | Baltimore County | 03.165.05 | Overlea High | Water Heater Replacement | water heater replacement and re-piping of 3-way co | $ 280,000 | $ 275,000 | $ 275,000 | |
2005 | Baltimore County | 03.134.05 | Loch Raven High | toilet partitions replacement | Replace toilet partitions | $ 70,000 | $ 70,000 | $ 70,000 | |
2005 | Baltimore County | 03.122.05 | General John Stricker Middle | Fire Alarm System | $ 250,400 | $ 250,400 | $ 250,400 | ||
2005 | Baltimore County | 03.109.05 | Red House Run Elementary | Heating loop Replacement | $ 50,000 | $ 50,000 | $ 50,000 | ||
2005 | Prince George's | 16.155.05 | Templeton Elementary | Chiller Replacement | Reciprocating water cooled chiller replacement | $ 98,000 | $ 98,000 | $ 98,000 | |
2005 | Prince George's | 16.016.05 | Thomas Stone Elementary | Chiller Replacement | $ 98,000 | $ 98,000 | $ 98,000 | ||
2005 | Prince George's | 16.125.05 | Thomas Claggett Elementary | Chiller Replacement | $ 98,000 | $ 98,000 | $ 98,000 | ||
2005 | Prince George's | 16.245.05 | Matthew Henson Elementary | Chiller Replacement | $ 98,000 | $ 98,000 | $ 98,000 | ||
2005 | Prince George's | 16.088.05 | Brandywine Elementary | Chiller Replacement | $ 80,000 | $ 80,000 | $ 80,000 | ||
2005 | Prince George's | 16.085.05 | High Point High | Chiller Replacement | $ 98,000 | $ 98,920 | $ 98,920 | ||
2005 | Carroll | 06.014.05 | Carrolltowne Elementary | Asbestos removal and carpet replacement | $ 33,000 | $ 33,000 | $ 33,000 | ||
2005 | Carroll | 06.036.05 | Westminster West Middle | Asbestos removal and carpet replacement | $ 20,000 | $ 20,000 | $ 20,000 | ||
2005 | Carroll | 06.002.05 | Northwest Middle | Asbestos removal and carpet replacement | $ 168,385 | $ 168,385 | $ 168,385 | ||
2005 | Carroll | 06.032.05 | Carroll County Career and Technology Center | Asbestos removal and carpet replacement | $ 23,000 | $ 23,000 | $ 23,000 | ||
2005 | Carroll | 06.026.05 | Mt. Airy Middle | Asbestos floor removal and replacement | $ 24,000 | $ 24,000 | $ 24,000 | ||
2005 | Carroll | 06.033.05 | Manchester Elementary | Flooring | Remove and replace flooring | $ 20,000 | $ 20,000 | $ 20,000 | |
2005 | Calvert | 04.007.05 | Mt. Harmony Elementary | Fire Alarm Replacement | $ 78,000 | $ 65,000 | $ 65,000 | ||
2005 | Harford | 12.003.05 | William Paca/Old Post Road Elementary | Switchboard Replacement | $ 120,000 | $ 120,000 | $ 120,000 | ||
2005 | Cecil | 07.028.05 | Cecil County School of Technology | Renovation of the existing welding lab within our Technology High School. This project consists of the installation of twenty (20) welding booths with the appropriate electric and gas services to handle individual welding at each booth as well as other necessary requirements. This will also include newly renovated classroom, girls and boys locker room facilities. | $ 250,000 | $ 220,000 | $ 220,000 | ||
2005 | Cecil | 07.012.05 | North East Middle | Roof Replacement | The removal and disposal of 7200 sf of built up roof and replace with SBS modified Bitumen roofing. The removal includes coping stones, metal coping, drains, flashings, expansion joints and associated masonry repairs. | $ 95,000 | $ 95,000 | $ 95,000 | |
2005 | Talbot | 20.007.05 | White Marsh Elementary | Playground Addition | $ 50,000 | $ 50,000 | $ 50,000 | ||
2005 | Carroll | 06.042.05 | Westminster High | Asbestos floor removal and replacement | $ 15,000 | $ 15,000 | $ 15,000 | ||
2005 | Wicomico | 22.016.05 | Fruitland Primary | Roof Replacement | Replace the remaining roof section that was not completed previously. | $ 20,000 | $ 19,000 | $ 19,000 | |
2005 | Wicomico | 22.020.05 | Chipman Elementary | Interior Renovations | Add a teacher restroom area | $ 55,000 | $ 50,000 | $ 50,000 | |
2005 | Wicomico | 22.019.05 | Pittsville Elementary/Middle | Bleachers Replacement | Replace old and broken gym bleachers | $ 25,000 | $ 25,000 | $ 25,000 | |
2005 | Wicomico | 22.009.05 | Wicomico High | Systemic improvements to address problems with the original switchgear and electrical service. | To address problems with the original switchgear and electrical service. | $ 35,000 | $ 30,000 | $ 30,000 | |
2005 | Wicomico | 22.018.05 | Mardela Middle/High | Door Replacement | Continuation of systemic repairs and replacement on the remaining existing exterior doors. | $ 27,000 | $ 27,000 | $ 27,000 | |
2005 | Wicomico | 22.001.05 | Parkside High | Address settlement problems at existing fire exits, address unsafe egress conditions and upgrade ADA access ramp as necessary. | $ 55,000 | $ 50,000 | $ 50,000 | ||
2005 | Wicomico | 22.019.05 | Pittsville Elementary/Middle | Flooring | Refinish the original wood gym floor | $ 25,000 | $ 25,000 | $ 25,000 | |
2005 | Wicomico | 22.007.05 | Delmar Elementary | Carpet Replacement | Replace the existing carpet | $ 35,000 | $ 35,000 | $ 35,000 | |
2005 | Wicomico | 22.016.05 | Fruitland Primary | Carpet Replacement | Replace the existing worn carpets and abate asbestos tile in several rooms with new VCT | $ 21,000 | $ 21,000 | $ 21,000 | |
2005 | Wicomico | 22.018.05 | Mardela Middle/High | Fire Alarm Replacement | Replace and upgrade the existing fire alarm system | $ 18,000 | $ 18,000 | $ 18,000 | |
2005 | Prince George's | 16.121.05 | Isaac J. Gordine Middle | Painting | Repaint total interior | $ 75,000 | $ 75,000 | $ 75,000 | |
2005 | Prince George's | 16.139.05 | Middleton Valley Elementary | Painting | Repaint total interior | $ 45,000 | $ 45,000 | $ 45,000 | |
2005 | Prince George's | 16.039.05 | Mt. Rainier Elementary | Painting | Repaint total interior | $ 60,000 | $ 60,000 | $ 60,000 | |
2005 | Prince George's | 16.213.05 | Martin Luther King Jr. Middle | Painting | Repaint total interior | $ 70,000 | $ 70,000 | $ 70,000 | |
2005 | Baltimore City | 30.138.05 | #025 Dr. Rayner Browne E. | Pluming | Replace fixtures and partitions in restrooms throughout school. | $ 65,000 | $ 65,000 | $ 65,000 | |
2005 | Baltimore City | 30.138.05 | #025 Dr. Rayner Browne E. | Flooring | Replace carpet with VCT in several classrooms throughout school. | $ 50,000 | $ 50,000 | $ 50,000 | |
2005 | Baltimore City | 30.242.05 | #029 Matthew Henson E. | Lighting Fixtures | Install new lighting fixtures throughout entire school | $ 80,000 | $ 80,000 | $ 80,000 | |
2005 | Baltimore City | 30.054.05 | #098 Samuel F.B. Morse E. | Door Replacement | Replace all exterior doors | $ 100,000 | $ 100,000 | $ 100,000 | |
2005 | Baltimore City | 30.115.05 | #178 Francis M. Woods H. | Door Replacement | Replace all exterior doors | $ 105,000 | $ 105,000 | $ 105,000 | |
2005 | Baltimore City | 30.173.05 | #209 Winston M. | Painting | Paint the entire school interior and exterior | $ 65,000 | $ 65,000 | $ 65,000 | |
2005 | Baltimore City | 30.173.05 | #209 Winston M. | Lighting Fixtures | New lighting fixtures throughout entire school | $ 90,000 | $ 90,000 | $ 90,000 | |
2005 | Baltimore City | 30.076.05 | #213 Govans E. | Flooring | Replace carpet with VCT in several classrooms throughout school. | $ 30,000 | $ 30,000 | $ 30,000 | |
2005 | Baltimore City | 30.191.05 | #231 Brehms Lane E. | Painting | Paint the entire school interior | $ 70,000 | $ 70,000 | $ 70,000 | |
2005 | Baltimore City | 30.187.05 | #401 Northwestern H. | Door Replacement | Replace all exterior doors | $ 260,000 | $ 260,000 | $ 260,000 | |
2005 | Baltimore City | 30.164.05 | #405 Patterson H. | Bleachers Replacement | $ 50,000 | $ 50,000 | $ 50,000 | ||
2005 | Baltimore City | 30.213.05 | #413 Harbor City H. | Parking Lot Renovation | Replace asphalt in parking lot, including repairs and striping. | $ 98,000 | $ 98,000 | $ 98,000 | |
2005 | Baltimore City | 30.111.05 | #450 Frederick Douglass H. | Painting | Paint the entire school interior | $ 160,000 | $ 160,000 | $ 160,000 | |
2005 | Somerset | 19.002.05 | Washington High | Athletic Storage Building | $ 45,000 | $ 45,000 | $ 45,000 | ||
2005 | Montgomery | 15.159.05 | Capt. James E. Daly Elementary | P.A. System Replacement | Due to repeated failures and inability to secure repair parts. | $ 27,181 | $ 27,181 | $ 27,181 | |
2005 | Montgomery | 15.105.05 | DuFief Elementary | PA System Replacement | Due to repeated failures and inability to secure repair parts. | $ 25,989 | $ 25,989 | $ 25,989 | |
2005 | Montgomery | 15.147.05 | Flower Hill Elementary | PA System Replacement | Due to repeated failures and inability to secure repair parts. | $ 25,498 | $ 25,498 | $ 25,498 | |
2005 | Montgomery | 15.122.05 | Highland Elementary | Door replacement | Exterior door replacements due to badly rusted doors and jambs causing safety and security problems. | $ 17,803 | $ 17,803 | $ 17,803 | |
2005 | Montgomery | 15.151.05 | Christa McAuliffe Elementary | PA System Replacement | Due to repeated failures and inability to secure repair parts. | $ 25,498 | $ 25,498 | $ 25,498 | |
2005 | Wicomico | 22.019.05 | Pittsville Elementary/Middle | Flooring | Replace the existing worn carpets and abate asbestos tile in several rooms with new VCT | $ 15,000 | $ 15,000 | $ 15,000 | |
2005 | Baltimore County | 03.003.05 | Chesapeake High | Exterior Door Replacement | Replace 30 original exterior doors | $ 80,000 | $ 80,000 | $ 80,000 | |
2005 | Baltimore City | 30.208.05 | #004 Steuart Hill E. | Exterior Door Replacement | Replace 16 exterior doors, frames and associated glazing. | $ 70,000 | $ 70,000 | $ 70,000 | |
2005 | Baltimore City | 30.042.05 | #083 William Paca E. | Exterior Door Replacement | Replace 22 exterior doors, frames and associated security contacts. | $ 90,000 | $ 90,000 | $ 90,000 | |
2005 | Baltimore City | 30.225.05 | #150 Bentalou E. | Restroom renovation | Replace fixtures in restrooms throughout the school. | $ 55,000 | $ 55,000 | $ 55,000 | |
2005 | Baltimore City | 30.077.05 | #214 Guilford E. | Restroom renovation | Replace fixtures in restrooms throughout school. | $ 70,000 | $ 70,000 | $ 70,000 | |
2005 | Howard | 13.062.05 | Waterloo Elementary | Door and Hardware Replacement | Replacement of rusted out, damaged, original exterior doors and hardware. | $ 65,000 | $ 65,000 | $ 65,000 | |
2005 | Prince George's | 16.113.05 | James Harrison Elementary | Painting | Repaint total interior | $ 49,000 | $ 49,000 | $ 49,000 | |
2006 | Baltimore County | 03.100.06 | Baltimore Highlands Elementary | Window System Replacement | $ 664,000 | $ 755,602 | $ 755,602 | ||
2006 | St. Mary's | 18.002.06 | Spring Ridge Middle | Flooring | Replace carpet with VCT | $ 37,500 | $ 76,899 | $ 76,899 | |
2006 | Wicomico | 22.007.06 | Delmar Elementary | Expand existing parking area, provide additional exits and repair existing lot. | $ 180,000 | $ 171,201 | $ 171,201 | ||
2006 | Wicomico | 22.019.06 | Pittsville Elementary/Middle | Boiler Replacement | Replace the original existing gym boiler | $ 96,000 | $ 68,074 | $ 68,074 | |
2006 | Wicomico | 22.012.06 | Northwestern Elementary | P.A. System | Replace existing PA and integrate w/ telecom system | $ 25,000 | $ 14,887 | $ 14,887 | |
2006 | Wicomico | 22.019.06 | Pittsville Elementary/Middle | Flooring | Replace the flooring in miscellaneous locations. (still outstanding: Main Office, Media Center, Band Room, and Computer Lab) | $ 14,500 | $ 21,719 | $ 21,719 | |
2006 | Wicomico | 22.024.06 | Westside Primary | Flooring | Replace old carpet, abate floor tile and replace with new VCT in approx. 6 rooms. | $ 50,000 | $ 36,119 | $ 36,119 | |
2006 | Montgomery | 15.190.06 | Whetstone Elementary | Concrete Replacement | Exterior concrete replacement to correct cracked retaining wall and unsafe sidewalks. | $ 35,921 | $ 35,921 | $ 35,921 | |
2006 | Montgomery | 15.194.06 | Maryvale Elementary | Lighting Replacement | Replace original stage dimmer panel and lighting due to failed equipment and repair parts no longer available. | $ 41,762 | $ 41,762 | $ 41,762 | |
2006 | Montgomery | 15.211.06 | Paint Branch High | Lighting Replacement | Replace original stage dimmer panel and lighting dimmer panel and lighting due to failed equipment and repair parts no longer available. | $ 39,994 | $ 39,994 | $ 39,994 | |
2006 | Montgomery | 15.019.06 | Seneca Valley High | Lighting Replacement | Replace original stage dimmer panel and lighting, and house lights due to failed equipment and repair parts no longer available. | $ 108,636 | $ 108,636 | $ 108,636 | |
2006 | Montgomery | 15.144.06 | Gaithersburg Elementary | Flooring | Replace original gymnasium synthetic floor that is cracked and delaminating. | $ 29,850 | $ 29,850 | $ 29,850 | |
2006 | Montgomery | 15.100.06 | Fox Chapel Elementary | Widow Replacement | Replace original exterior windows that are rusted badly in several classrooms. | $ 40,754 | $ 40,754 | $ 40,754 | |
2006 | Montgomery | 15.141.06 | Wheaton High | Window Replacement | Replace exterior windows that are rusted badly in the court area. | $ 56,488 | $ 56,488 | $ 56,488 | |
2006 | Montgomery | 15.122.06 | Highland Elementary | Asphalt replacement | Asphalt replacement in play area that is in poor condition. | $ 10,009 | $ 10,009 | $ 10,009 | |
2006 | Montgomery | 15.154.06 | Clearspring Elementary | Painting | Paint in poor condition, last painted in 1988. | $ 25,000 | $ 25,000 | $ 28,375 | |
2006 | Montgomery | 15.100.06 | Fox Chapel Elementary | Interior Painting | Paint in poor condition, last painted in 1987. | $ 26,695 | $ 26,695 | $ 26,695 | |
2006 | Montgomery | 15.156.06 | Goshen Elementary | Painting | Paint in poor condition, last painted in 1988. | $ 27,200 | $ 27,200 | $ 27,200 | |
2006 | Montgomery | 15.153.06 | Waters Landing Elementary | Painting | Paint in poor condition, last painted in 1988. | $ 29,350 | $ 29,350 | $ 29,350 | |
2006 | Montgomery | 15.100.06 | Fox Chapel Elementary | Replace the original acoustical ceiling system and light fixtures in the corridors throughout that have failed and require a high degree of maintenance. | $ 49,973 | $ 49,973 | $ 49,973 | ||
2006 | Montgomery | 15.013.06 | Germantown Elementary | Flooring | Floor covering replacement to address worn-out carpet in the IMC and loose and damaged VCT on the corridor ramps. | $ 13,075 | $ 13,075 | $ 13,075 | |
2006 | Montgomery | 15.197.06 | Farquhar Middle | Locker Replacement | Replace original corridor lockers that are in poor condition and require high maintenance. | $ 110,250 | $ 110,250 | $ 110,250 | |
2006 | Montgomery | 15.141.06 | Wheaton High | Replace 51 year old concrete stadium seating system on visitor side that has spalling and badly deteriorated concrete and fiberglass benches. | $ 374,668 | $ 374,668 | $ 374,668 | ||
2006 | Allegany | 01.003.06 | Bel Air Elementary | Boiler Replacement | The existing cast iron boilers were installed as part of the 1974 renovation. The boilers are inefficient and have reached the end of their useful life. This project will replace the boilers with cast iron, dual fuel, sectional boilers. The domestic water heaters and holding talk will be replaced. All related pumps, piping, and controls will be replaced. The exterior boiler room doors and combustion air vents will be removed and replaced. | $ 308,000 | $ 308,000 | $ 308,000 | |
2006 | Kent | 14.001.06 | Millington Elementary | Cafeteria table Replacement | In-wall cafeteria table replacement | $ 26,835 | $ 20,948 | $ 20,948 | |
2006 | Kent | 14.005.06 | Rock Hall Elementary | Cafeteria table Replacement | In-wall cafeteria table replacement | $ 20,152 | $ 20,152 | $ 20,152 | |
2006 | Kent | 14.006.06 | Garnett Elementary | Flooring | Classroom (4) floor tile replacement | $ 13,900 | $ 13,900 | $ 13,900 | |
2006 | Kent | 14.004.06 | Rock Hall Middle | Flooring | Replace/Install Carpet Media Center, Teachers Lounge. | $ 10,500 | $ 10,000 | $ 10,000 | |
2006 | Dorchester | 09.012.06 | South Dorchester Elementary/Middle | Flooring | Replace 31-year-old carpet in media center and administrative, break out areas. | $ 13,041 | $ 13,041 | $ 13,041 | |
2006 | Dorchester | 09.009.06 | Cambridge-South Dorchester High | Flooring | Replace original, 29-year-old carpet in the media center main reading room and ancillary spaces. | $ 35,067 | $ 35,067 | $ 35,067 | |
2006 | Dorchester | 09.001.06 | Sandy Hill Elementary | Flooring | Replace original, 31-year-old carpet in Pod 4 and ancillary spaces. | $ 16,892 | $ 16,892 | $ 16,892 | |
2006 | Baltimore County | 03.057.06 | Victory Villa Elementary | Window and Door Replacement | Replace windows and exterior doors | $ 500,000 | $ 540,754 | $ 540,754 | |
2006 | Baltimore County | 03.020.06 | Mars Estates Elementary | Window System Replacement | $ 672,000 | $ 444,000 | $ 444,000 | ||
2006 | Baltimore County | 03.136.06 | Campfield Early Childhood Center | Window System Replacement | $ 700,000 | $ 835,644 | $ 835,644 | ||
2006 | Harford | 12.046.06 | Joppatowne High | Chiller replacement | Replace chiller, heating, ventilating, air conditioning system/or components | $ 300,000 | $ 300,000 | $ 300,000 | |
2006 | Harford | 12.003.06 | William Paca/Old Post Road Elementary | Motor Control Center Replacement | $ 30,000 | $ 30,000 | $ 30,000 | ||
2006 | Harford | 12.022.06 | Homestead/Wakefield Elementary | Flooring | Replace hallways asbestos floor tile | $ 30,000 | $ 30,000 | $ 30,000 | |
2006 | Harford | 12.022.06 | Homestead/Wakefield Elementary | Flooring | Replace classroom asbestos floor tile | $ 30,000 | $ 30,000 | $ 30,000 | |
2006 | Calvert | 04.013.06 | Appeal Elementary | Flooring | Carpeting | $ 57,351 | $ 57,351 | $ 57,351 | |
2006 | Calvert | 04.013.06 | Appeal Elementary | Painting | Paint Existing Walls and Replace Chalkboards with Marker Boards | $ 10,000 | $ 10,000 | $ 10,000 | |
2006 | Frederick | 10.030.06 | New Market Elementary | Window Replacement | Phase IV | $ 43,125 | $ 40,000 | $ 40,000 | |
2006 | Frederick | 10.023.06 | Parkway Elementary | Window Replacement | Phase I | $ 43,125 | $ 40,000 | $ 40,000 | |
2006 | Frederick | 10.033.06 | Rock Creek Center Special Education | Burner Replacement | Replace burner to Dual Fuel Burner with Components (1) | $ 19,500 | $ 15,000 | $ 15,000 | |
2006 | Frederick | 10.058.06 | Waverley Elementary | Burner Replacement | Replace burner to Dual Fuel Burner with Components (1) | $ 19,500 | $ 15,000 | $ 15,000 | |
2006 | Frederick | 10.025.06 | Brunswick Elementary | Asbestos Abatement | $ 73,500 | $ 60,000 | $ 60,000 | ||
2006 | Frederick | 10.004.06 | Lincoln "B" Elementary | Gym Flooring | Refinish wood floor 2,079 sf. | $ 25,000 | $ 20,000 | $ 20,000 | |
2006 | Frederick | 10.023.06 | Parkway Elementary | Gym Flooring | Replace with Synthetic Material and Repair Substructure. 2,652 sf. | $ 50,000 | $ 45,000 | $ 45,000 | |
2006 | Frederick | 10.015.06 | Thurmont Elementary | Entrance reconfiguration to improve security | $ 40,000 | $ 35,000 | $ 35,000 | ||
2006 | Frederick | 10.075.06 | Walkersville "B" Adult Education/Evening High | Window Replacement Phase I | Replace window Phase I | $ 41,500 | $ 40,000 | $ 40,000 | |
2006 | Cecil | 07.015.06 | Chesapeake City Elementary | Flooring | Carpet Replacement | $ 25,000 | $ 25,000 | $ 25,000 | |
2006 | Cecil | 07.013.06 | Perryville High | Flooring | Carpet Replacement | $ 20,000 | $ 20,000 | $ 20,000 | |
2006 | Cecil | 07.028.06 | Cecil County School of Technology | Lab Renovations | Supplemental Funding of Welding lab Renovations approved under FY 05 ASP | $ 117,321 | $ 117,321 | $ 117,321 | |
2006 | Anne Arundel | 02.017.06 | Georgetown East Elementary | Flooring | Carpet and Tile replacement | $ 75,000 | $ 75,000 | $ 75,000 | |
2006 | Anne Arundel | 02.023.06 | Broadneck Elementary | Flooring | Carpet and Tile replacement | $ 105,000 | $ 105,000 | $ 105,000 | |
2006 | Anne Arundel | 02.007.06 | Magothy River Middle | Folding Door Replacement | Replace folding doors | $ 90,000 | $ 90,000 | $ 90,000 | |
2006 | Anne Arundel | 02.009.06 | Chesapeake Bay Middle | Folding Door Replacement | Replace folding doors | $ 55,000 | $ 55,000 | $ 55,000 | |
2006 | Anne Arundel | 02.008.06 | Linthicum Elementary | Folding Door Replacement | Replace folding doors | $ 50,000 | $ 50,000 | $ 50,000 | |
2006 | Anne Arundel | 02.089.06 | Severna Park Middle | Folding Door Replacement | Replace folding doors | $ 45,000 | $ 45,000 | $ 45,000 | |
2006 | Caroline | 05.006.06 | Ridgely Elementary | Playground Equipment | $ 33,000 | $ 33,000 | $ 33,000 | ||
2006 | Caroline | 05.008.06 | Preston Elementary | Stage Curtain/Folding Door | $ 32,000 | $ 32,000 | $ 32,000 | ||
2006 | Caroline | 05.001.06 | Greensboro Elementary | Public Address / Communication System | $ 20,000 | $ 20,000 | $ 20,000 | ||
2006 | Cecil | 07.028.06 | Cecil County School of Technology | Flooring | Carpet, VCT tile and cove base replacement various rooms. This includes asbestos floor tile removal. | $ 35,000 | $ 35,000 | $ 35,000 | |
2006 | Talbot | 20.006.06 | Chapel District Elementary | Playground Addition | $ 135,000 | $ 133,000 | $ 133,000 | ||
2006 | Queen Anne's | 17.006.06 | Stevensville Middle | Flooring | Paint glazed tile, which was install during the initial construction of the building, in hallways with Multi-plex epoxy paint. | $ 30,600 | $ 30,600 | $ 30,600 | |
2006 | Queen Anne's | 17.002.06 | Sudlersville Middle | Locker Replacement | Lockers were last renovated during the construction in 1979. They need to be painted and major repairs done. | $ 18,000 | $ 18,000 | $ 18,000 | |
2006 | Queen Anne's | 17.006.06 | Stevensville Middle | Flooring | Replace carpet in Band Room and replace carpet in Choral Room with VCT which was installed during the 1980 renovation. | $ 12,000 | $ 12,000 | $ 12,000 | |
2006 | Prince George's | 16.005.06 | Eugene Burroughs Middle | A/C unit replacement | (1) Absorption A/C unit replacement. Replace with new centrifugal A/C unit. Chill water, condenser water, and control to be included. | $ 242,624 | $ 242,624 | $ 242,624 | |
2006 | Prince George's | 16.056.06 | Capitol Heights Elementary | Boiler Replacement | (2) Hot-water Boiler Replacement with pumps, controls, etc. to current design standards. | $ 364,000 | $ 364,000 | $ 364,000 | |
2006 | Prince George's | 16.237.06 | Concord Elementary | Boiler/Buried Fuel Oil Tank Replacement | (2) Steam Boiler/Buried Fuel Oil Tank Replacement with pumps, controls, etc. to current design standards. | $ 496,000 | $ 496,000 | $ 496,000 | |
2006 | Prince George's | 16.194.06 | Duval High | Boiler Replacement | (2) Steam Boiler Replacement with pumps, controls, etc. to current design standards. | $ 411,000 | $ 411,000 | $ 411,000 | |
2006 | Prince George's | 16.016.06 | Thomas Stone Elementary | Replacement of the underground fuel oil storage tank | $ 90,900 | $ 90,900 | $ 90,900 | ||
2006 | Prince George's | 16.088.06 | Brandywine Elementary | Replacement of the underground fuel oil storage tank | $ 89,300 | $ 89,300 | $ 89,300 | ||
2006 | Prince George's | 16.081.06 | University Park Elementary | Chiller Replacement | (1) Recip air cooled Chiller Replacement. | $ 105,000 | $ 105,000 | $ 105,000 | |
2006 | Worcester | 23.007.06 | Buckingham Elementary | Flooring | Remove existing carpet and tile and install new vinyl composition tile in 27 classrooms, Media Center, and corridors. | $ 37,000 | $ 37,000 | $ 37,000 | |
2006 | Worcester | 23.011.06 | Pocomoke Middle | Flooring | Remove existing carpet and tile and install new vinyl composition tile in Media Center. | $ 14,000 | $ 14,000 | $ 14,000 | |
2006 | Worcester | 23.012.06 | Berlin Intermediate | Ceilings Tile | Remove existing Kitchen ceiling tiles and install new vinyl coated ceiling tiles per Health Department recommendation. | $ 14,000 | $ 14,000 | $ 14,000 | |
2006 | Somerset | 19.014.06 | Greenwood Middle | Lighting | Install retrofit in entire school | $ 65,000 | $ 65,000 | $ 65,000 | |
2006 | Cecil | 07.040.06 | North East High | Flooring | Replace carpet, upgrade PA, add lighting, chalkboard, door jam, fixed seating, and painting. | $ 40,000 | $ 35,000 | $ 35,000 | |
2006 | Cecil | 07.013.06 | Perryville High | Chiller Replacement | $ 76,150 | $ 76,150 | $ 76,150 | ||
2006 | Carroll | 06.026.06 | Mt. Airy Middle | VAT removal and VCT installation | $ 76,500 | $ 76,500 | $ 76,500 | ||
2006 | Carroll | 06.042.06 | Westminster High | VAT removal and VCT installation | $ 132,750 | $ 132,750 | $ 132,750 | ||
2006 | Carroll | 06.019.06 | Liberty High | VAT removal and VCT installation | $ 119,700 | $ 173,045 | $ 173,045 | ||
2006 | Anne Arundel | 02.018.06 | Central Middle | Flooring | Replace rubber floor tile and stair treads | $ 20,000 | $ 20,000 | $ 20,000 | |
2006 | Anne Arundel | 02.009.06 | Chesapeake Bay Middle | Flooring | Replace rubber floor tile and stair treads | $ 60,000 | $ 60,000 | $ 60,000 | |
2006 | Anne Arundel | 02.012.06 | Chesapeake High | Flooring | Replace rubber floor tile and stair treads | $ 30,000 | $ 30,000 | $ 30,000 | |
2006 | Anne Arundel | 02.007.06 | Magothy River Middle | Flooring | Replace rubber floor tile and stair treads | $ 60,000 | $ 60,000 | $ 60,000 | |
2006 | Anne Arundel | 02.013.06 | Meade High | Flooring | Replace rubber floor tile and stair treads | $ 45,000 | $ 45,000 | $ 45,000 | |
2006 | Anne Arundel | 02.049.06 | Shipley's Choice Elementary | Flooring | Carpet and Tile replacement | $ 80,000 | $ 80,000 | $ 80,000 | |
2006 | Anne Arundel | 02.099.06 | South River High | Flooring | Replace rubber floor tile and stair treads | $ 45,000 | $ 45,000 | $ 45,000 | |
2006 | Charles | 08.025.06 | Daniel of St. Thomas Jenifer Elementary | Flooring | Re-carpet/tile | $ 150,000 | $ 85,000 | $ 85,000 | |
2006 | Garrett | 11.014.06 | Northern High | Masonry/concrete sidewalk replacement | Sidewalks to front entrance are deteriorating. Remove existing and replace. | $ 85,000 | $ 65,000 | $ 65,000 | |
2006 | Howard | 13.013.06 | Atholton High | Roof Repair | Repair roof in several areas. Roof needs repairs and upgrades; need to replace lead pans around drains; install new drains where water is ponding on roof; and need roof coating in several areas to control leak problems. | $ 15,000 | $ 15,000 | $ 15,000 | |
2006 | Howard | 13.076.06 | Hammond Middle | Bleachers Replacement | Replace gym bleachers; the gym bleachers are in very poor operating condition. There are serious signs of fatigue of the steel structure. The bleachers were originally freestanding but have been anchored to the wall and converted to pullout type. | $ 30,000 | $ 30,000 | $ 30,000 | |
2006 | Howard | 13.056.06 | Longfellow Elementary | Door and Hardware Replacement | Replace rusted out, damaged, original exterior doors and hardware. | $ 17,841 | $ 17,841 | $ 17,841 | |
2006 | Howard | 13.048.06 | Northfield Elementary | Doors and Hardware | Install card readers and electronic door hardware. Add security cameras. Safety/security of students/staff. | $ 19,000 | $ 19,000 | $ 19,000 | |
2006 | Howard | 13.048.06 | Northfield Elementary | Rooftop unit Replacement | Replace Gym rooftop unit. The existing rooftop unit for the Gym is about twenty (20) years old and is past its life expectancy. The unit is badly rusted and leaks whenever it rains or snows. It is extremely difficult to maintain and operate this unit. During extreme weather conditions we receive numerous complaints that the unit is not working. Furthermore, it is hard to find replacement parts. | $ 30,000 | $ 30,000 | $ 30,000 | |
2006 | Howard | 13.023.06 | Swansfield Elementary | Doors and Hardware | Install card readers and electronic door hardware. Safety/security of students/staff. | $ 12,159 | $ 12,159 | $ 12,159 | |
2006 | Howard | 13.007.06 | Talbott Springs Elementary | Doors and Hardware | Install card readers and electronic door hardware. Safety/security of students/staff. | $ 11,604 | $ 11,604 | $ 11,604 | |
2006 | Howard | 13.075.06 | Thunder Hill Elementary | Rooftop Unit Replacement | Replace Gym rooftop unit. The existing rooftop unit for the Gym is about eighteen (18) years old and is past its life expectancy. The unit is badly rusted and leaks whenever it rains or snows. It is extremely difficult to maintain and operate this unit. During extreme weather conditions we receive numerous complaints that the unit is not working. Furthermore, it is hard to find replacement parts. | $ 15,000 | $ 15,000 | $ 15,000 | |
2006 | Prince George's | 16.048.06 | Flintstone Elementary | Painting | Repaint exterior | $ 24,000 | $ 24,000 | $ 24,000 | |
2006 | Prince George's | 16.001.06 | Gwynn Park High | Resurface interior halls with high impact sheetrock, repaint, replace ceiling, carpeting/floor tile. | $ 172,000 | $ 172,000 | $ 172,000 | ||
2006 | Prince George's | 16.128.06 | John Hanson Elementary/Middle | Painting | Repaint exterior | $ 29,200 | $ 29,200 | $ 29,200 | |
2006 | Prince George's | 16.155.06 | Templeton Elementary | Painting | Repaint exterior | $ 29,200 | $ 29,200 | $ 29,200 | |
2006 | Queen Anne's | 17.004.06 | Centreville Middle | Interior painting | Gymnasium including girls and boys locker rooms. Two walls have paint peeling from a previously repaired roof leak. It has been 10 years since this area has been painted. Repair ceiling in locker room, retouch paint, plaster spackling. | $ 20,000 | $ 20,000 | $ 20,000 | |
2006 | Washington | 21.001.06 | Boonsboro High | Flooring | Gym Floor Replacement; the existing wood floor is 10,300 sq. ft. and is scheduled for refinishing this summer. The wood floor is original and installed in the addition/renovation of 1976. | $ 20,815 | $ 20,815 | $ 20,815 | |
2006 | Washington | 21.001.06 | Boonsboro High | Auditorium | The high school is in need of an auditorium sound system to be utilized during informational assemblies and other activities. The present sound system has been in place since 1976 and is, for the most part, not operational. | $ 28,000 | $ 28,000 | $ 28,000 | |
2006 | Washington | 21.023.06 | Cascade Elementary | Window Replacement | Painting exterior trim and windows of the school. Replacing window trim and glass as needed. Believed to be last painted in 1979. | $ 43,000 | $ 43,000 | $ 43,000 | |
2006 | Washington | 21.007.06 | Clear Spring Middle | The project would include replacing ballasts and re-lamping exiting lighting fixture in open space areas. The project will include 150 light fixtures and cover 11,000 sq. ft. of open interior classroom, library, and corridor space. | $ 80,000 | $ 80,000 | $ 80,000 | ||
2006 | Washington | 21.038.06 | E. Russell Hicks Middle | Flooring | Gym floor refinishing; the existing wood floor is 6,670 sq. ft. and is scheduled for refinishing this summer. The wood floor is the original floor installed during construction. | $ 9,926 | $ 9,926 | $ 9,926 | |
2006 | Washington | 21.025.06 | Hancock Middle/High | Flooring | Gym floor refinishing; the existing wood floor is 7,200 sq. ft. and is scheduled for refinishing this summer. The wood floor is the original floor installed during construction in 1956. | $ 17,016 | $ 17,016 | $ 17,016 | |
2006 | Washington | 21.004.06 | Hickory Elementary | Flooring | The existing 3,000 sq. ft. gym floor is made of a synthetic material. It was installed when the school was built in 1975. Hickory Elementary has never had a major renovation project. | $ 30,000 | $ 30,000 | $ 30,000 | |
2006 | Baltimore City | 30.144.06 | #013 Tench Tilghman Elementary | CCTV installation | Interior and exterior CCTV installation. | $ 91,619 | $ 76,690 | $ 76,690 | |
2006 | Baltimore City | 30.277.06 | #035 Harlem Park Elementary | Gym Renovation | Refinish wood floor, upgrade lighting, replace backboards and paint. | $ 35,000 | $ 24,943 | $ 24,943 | |
2006 | Baltimore City | 30.019.06 | #036 Harford Heights Building | Door Replacement | Replace all exterior doors and frames with new FRP doors. | $ 226,000 | $ 225,903 | $ 225,903 | |
2006 | Baltimore City | 30.029.06 | #053 Margaret Brent Elementary | Lockers Replacement | Provide additional built-in lockers at classrooms to accommodate existing classrooms and expansion. | $ 29,805 | $ 24,690 | $ 24,690 | |
2006 | Baltimore City | 30.030.06 | #055 Hampden Elementary | Gym Renovation | Refinish wood floor, upgrade lighting, replace backboards, and paint. | $ 32,820 | $ 25,268 | $ 25,268 | |
2006 | Baltimore City | 30.030.06 | #055 Hampden Elementary | Door Replacement | Replace exterior doors and frames w/ new FRP doors. | $ 112,625 | $ 93,691 | $ 93,691 | |
2006 | Baltimore City | 30.030.06 | #055 Hampden Elementary | CCTV installation | Interior and exterior CCTV installation. | $ 99,704 | $ 75,790 | $ 75,790 | |
2006 | Baltimore City | 30.030.06 | #055 Hampden Elementary | Flooring | Replace carpet with VCT. | $ 80,042 | $ 93,209 | $ 93,209 | |
2006 | Baltimore City | 30.184.06 | #075 Calverton Middle | Door Replacement | Replace exterior doors and frames w/ new FRP doors, including Courtyard area. | $ 210,826 | $ 208,986 | $ 208,986 | |
2006 | Baltimore City | 30.184.06 | #075 Calverton Middle | Gym Renovation | Refinish wood floor (300 sq. ft.), touch up game lines, replace backboards, and recoat entire floor. | $ 18,175 | $ 13,212 | $ 13,212 | |
2006 | Baltimore City | 30.184.06 | #075 Calverton Middle | Door Replacement | Replace interior doors at all classrooms, office doors at rooms 221, 225, 318, 327, 303, 312, and student/teacher bathrooms in school #075 and #430 areas. | $ 352,000 | $ 349,029 | $ 349,029 | |
2006 | Baltimore City | 30.168.06 | #130 Booker T. Washington Middle | Door Replacement | Replace exterior doors and frames w/ new FRP doors. | $ 149,120 | $ 147,707 | $ 147,707 | |
2006 | Baltimore City | 30.168.06 | #130 Booker T. Washington Middle | Flooring Replacement | Repair damaged sub-floor and provide new VCT for entire floor in cafeteria. | $ 74,500 | $ 73,715 | $ 73,715 | |
2006 | Baltimore City | 30.147.06 | #133 Paul Laurence Dunbar Middle | Door Replacement | Replace damaged interior doors at cafeteria bathrooms and rooms 103, 210, 211, 207, 206, 312, 300, 303, 400, and boys bathroom near room 106. | $ 148,208 | $ 146,523 | $ 146,523 | |
2006 | Baltimore City | 30.264.06 | #170 Thurgood Marshall Middle | Locker Replacement | Replace 25% of existing damaged built-in lockers. | $ 20,972 | $ 23,072 | $ 23,072 | |
2006 | Baltimore City | 30.264.06 | #170 Thurgood Marshall Middle | Gym Renovation | Touch up game lines, screen/recoat entire floor due to excess wear, upgrade lighting, replace backboards, new hoist for goals, and dedicated circuit for scoreboard. | $ 64,895 | $ 51,581 | $ 51,581 | |
2006 | Baltimore City | 30.115.06 | #178 Francis M. Woods Alternative High | Gym Renovation | Repair and refinish wood floor (2,200 sq. ft.), replace backboards, scoreboard, painting of game lines, and dedicated circuit. | $ 32,060 | $ 45,560 | $ 45,560 | |
2006 | Baltimore City | 30.115.06 | #178 Francis M. Woods Alternative High | Bleacher Replacement | Replace 2 banks of bleachers at gymnasium. | $ 18,028 | $ 16,523 | $ 16,523 | |
2006 | Baltimore City | 30.072.06 | #215 Highlandtown Elementary | CCTV installation | Interior and exterior CCTV installation. | $ 96,916 | $ 60,947 | $ 60,947 | |
2006 | Baltimore City | 30.251.06 | #223 Pimlico Elementary | Locker Replacement | Provide 300 built-in student lockers at 2nd and 3rd floor corridor at Building Section A. | $ 42,570 | $ 36,781 | $ 36,781 | |
2006 | Baltimore City | 30.251.06 | #223 Pimlico Elementary | Flooring Replacement | Replace carpet w/ VCT in rooms 203, 205, 206, 303, 304, 305, and 306. | $ 21,420 | $ 21,420 | $ 21,420 | |
2006 | Baltimore City | 30.251.06 | #223 Pimlico Elementary | Door Replacement | Replace all interior doors at Building A, 2nd and 3rd floors. | $ 199,258 | $ 188,980 | $ 188,980 | |
2006 | Baltimore City | 30.244.06 | #254 Martin L. King, Jr. Elementary | Gym Renovation | Repair 500 sq. ft. of damaged wood flooring and refinish wood floor, replace backboards, scoreboard, paint game lines (painting ineligible for reimbursement), and light bulb replacement. | $ 18,504 | $ 23,304 | $ 23,304 | |
2007 | Prince George's | 16.043.07 | Kettering Middle | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 200,000 | $ 200,000 | $ 249,675 | 100 | |
2007 | Queen Anne's | 17.006.07 | Stevensville Middle | Replace carpet | Replace carpet with VCT in classroom #105,104, 103, 202, 203 and 204. | $ 40,000 | $ 40,000 | $ 36,655 | 100 |
2007 | Baltimore City | 30.057.07 | #105A Moravia Elementary | Intercom System Replacement | Existing system has exceeded its useful life and with system components no longer manufactured, repair is not an option | $ 20,000 | $ 17,807 | $ 17,807 | |
2007 | Queen Anne's | 17.004.07 | Centreville Middle | Fire Doors Replacement | Replacement of Asbestos Containing Fire Doors throughout building. | $ 20,000 | $ 20,000 | $ 19,950 | 0 |
2007 | Carroll | 06.001.07 | North Carroll High | Asbestos Removal and Replacement | Asbestos Countertop replacement, VAT removal/flooring installation and Stage Lighting Asbestos wiring replacement. | $ 217,000 | $ 226,420 | $ 234,935 | 100 |
2007 | Baltimore County | 03.167.07 | Middlesex Elementary | Door Replacement | Replace exterior doors. | $ 125,000 | $ 119,044 | $ 130,930 | 100 |
2007 | Baltimore City | 30.164.07 | #405 Patterson High | Door Replacement | Replace all exterior doors, and frames with new FRP doors and frames. | $ 324,000 | $ 323,107 | $ 323,107 | 100 |
2007 | Baltimore City | 30.086.07 | #228 John Ruhrah Elementary | Ceiling Tile Replacement | Replace all drop ceilings within school building. | $ 75,000 | $ 142,290 | $ 142,290 | 100 |
2007 | Baltimore City | 30.182.07 | #042 Garrison Middle | Hot Water Heater | Replacement of water heater will result in cost savings for hot water needs during summer. Currently hot water is provided by boiler running to supply hot water heater. Separate Hot Water unit will allow for boilers to be off line for 7 months per year. | $ 72,000 | $ 20,904 | $ 20,904 | 100 |
2007 | Baltimore City | 30.240.07 | #229 Holabird Elementary | HVAC Replacement | Replace 10 self contained heat/air conditioning units for individual classrooms. | $ 70,000 | $ 37,023 | $ 37,023 | 100 |
2007 | Baltimore City | 30.140.07 | #142 Robert W. Coleman Elementary | HVAC Replacement | Replace 9 heat/air conditioning units. | $ 56,000 | $ 55,913 | $ 55,913 | 100 |
2007 | Baltimore City | 30.054.07 | #098 Samuel F.B. Morse Elementary | Intercom System Replacement | Existing system far exceeded its operational life and with the specific system components no longer manufactured, repair is not an option. | $ 20,000 | $ 19,888 | $ 19,888 | 100 |
2007 | Baltimore City | 30.019.07 | #036/037 Harford Heights Elementary | Gym Renovation | Replace Floor and both the basketball and volleyball apparatus. | $ 106,000 | $ 60,055 | $ 60,055 | 100 |
2007 | Baltimore County | 03.075.07 | Eastern Technical High | Auxiliary gym activity room, locker rooms and panel lighting replacement. | $ 65,000 | $ 65,000 | $ 39,950 | 0 | |
2007 | Baltimore City | 30.232.07 | #105B Moravia Elementary | Boiler Replacement | Repair Boiler #1; replace rear section and bottom three rows of stay bolts. Perform energy savings upgrades by installing new code plate, new 3"x3" relief valves, and blow down piping. | $ 32,253 | $ 10,832 | $ 10,832 | 0 |
2007 | Baltimore City | 30.223.07 | #057 Lombard Middle | Boiler Replacement | Replacement of total burner assembly on boiler #1. | $ 13,668 | $ 13,511 | $ 13,511 | 0 |
2007 | Baltimore City | 30.197.07 | #010 James McHenry Elementary | Boiler Replacement | Replace first and second pass tubing on Boiler #2, that includes (71) new 2 1/2" wall tubes, per manufacturer's specification. Boiler inspection violation. School has one operating boiler. | $ 17,728 | $ 12,657 | $ 12,657 | 100 |
2007 | Baltimore City | 30.140.07 | #142 Robert W. Coleman Elementary | Boiler Replacement | Replacement of boiler # 2, including reconnection of burner and fuel piping. | $ 35,900 | $ 35,900 | $ 35,900 | 0 |
2007 | Caroline | 05.003.07 | Denton Elementary | Public Address/Communication System | Replace Public Address/Communication System. | $ 21,785 | $ 21,785 | $ 21,785 | 100 |
2007 | Caroline | 05.008.07 | Preston Elementary | Public Address/Communication System | $ 18,740 | $ 18,740 | $ 18,740 | 100 | |
2007 | Montgomery | 15.206.07 | Bel Pre Elementary | Emergency Generator Installation | Install new emergency generator to address failed battery back-up emergency lighting and to improve safety during power failures. | $ 75,000 | $ 75,000 | $ 31,334 | 100 |
2007 | Montgomery | 15.160.07 | Sequoyah Elementary | P.A. System Replacement | Due to repeated failures and inability to secure repair parts. | $ 21,042 | $ 21,042 | $ 21,042 | 100 |
2007 | Montgomery | 15.118.07 | Emory Grove Center | Exterior Window Replacement | Original badly rusted causing security issues. New windows will enhance energy savings. (Phase 1 of 2). | $ 99,685 | $ 99,685 | $ 99,685 | 100 |
2007 | Montgomery | 15.219.07 | Rolling Terrace Elementary | Gym Floor | Replace original gymnasium synthetic floor that is cracked and delaminating causing it to be unsafe with a wood floor. | $ 49,734 | $ 49,734 | $ 49,734 | 100 |
2007 | Montgomery | 15.224.07 | Mark Twain Spec. Ed. (Blair G. Ewing Center ) | Exterior Door Replacement | Original badly rusted causing security issues. | $ 64,961 | $ 64,961 | $ 64,961 | 100 |
2007 | Montgomery | 15.197.07 | Farquhar Middle | Exterior Window Replacement | Original badly rusted causing security issues. New windows will enhance energy savings. (Media Center) | $ 33,666 | $ 33,666 | $ 33,666 | 100 |
2007 | Montgomery | 15.150.07 | Jones Lane Elementary | Floor Covering Replacement | Remove carpet that is buckled and torn causing a safety issue in all classrooms and install VCT. | $ 40,703 | $ 40,703 | $ 40,703 | 100 |
2007 | Montgomery | 15.162.07 | Ronald McNair Elementary | Floor Covering Replacement | Remove carpet that is buckled and torn causing a safety issue in all classrooms and install VCT. | $ 44,408 | $ 44,408 | $ 44,408 | 100 |
2007 | Montgomery | 15.093.07 | Olney Elementary | Floor Covering Replacement | Remove carpet that is buckled and torn causing a safety issue in all classrooms and administration area and install VCT in classrooms and new carpet in administration area. | $ 40,652 | $ 40,652 | $ 40,652 | 100 |
2007 | Montgomery | 15.152.07 | Strawberry Knolls Elementary | Floor Covering Replacement | Remove carpet that is buckled and torn causing a safety issue in eight classrooms and install VCT. | $ 15,814 | $ 15,814 | $ 15,814 | 100 |
2007 | Montgomery | 15.210.07 | Tilden Center | Floor Covering Replacement | Replace all second floor VCT including required asbestos abatement due to loose and missing tiles. | $ 99,882 | $ 99,882 | $ 99,882 | 100 |
2007 | Montgomery | 15.090.07 | Damascus High | Exterior and Interior Painting | Paint in poor condition, last painted 1988. | $ 99,980 | $ 99,980 | $ 99,980 | 100 |
2007 | Montgomery | 15.152.07 | Strawberry Knolls Elementary | Exterior and Interior Painting | Original paint in poor condition. | $ 22,836 | $ 22,836 | $ 22,836 | 100 |
2007 | Montgomery | 15.021.07 | Belmont Elementary | Asphalt Replacement | Parking lot and driveway in poor condition. | $ 74,178 | $ 74,178 | $ 74,178 | 100 |
2007 | Montgomery | 15.024.07 | Brown Station Elementary | Asphalt Replacement | Court yard and play areas in poor condition. | $ 25,046 | $ 25,046 | $ 25,046 | 100 |
2007 | Montgomery | 15.234.07 | Cloverly Elementary | Asphalt Replacement | Parking lot and driveway in poor condition. | $ 45,951 | $ 45,951 | $ 45,951 | 100 |
2007 | Montgomery | 15.013.07 | Germantown Elementary | Asphalt Replacement | Parking lot and play areas in poor condition. | $ 68,824 | $ 68,824 | $ 68,824 | 100 |
2007 | Montgomery | 15.155.07 | Greencastle Elementary | Asphalt Replacement | Replace asphalt; parking lot and driveway in poor condition. | $ 69,288 | $ 69,288 | $ 69,288 | 100 |
2007 | Montgomery | 15.252.07 | Stonegate Elementary | Asphalt Replacement | Parking lot and driveway in poor condition. | $ 42,747 | $ 42,747 | $ 42,747 | 100 |
2007 | Montgomery | 15.141.07 | Wheaton High | Fencing Replacement | Existing fencing is rusted and damaged beyond repair. | $ 32,567 | $ 32,567 | $ 32,567 | 100 |
2007 | Baltimore City | 30.269.07 | #086 Lakewood Elementary | Playground | Provide play equipment and safety surfacing. | $ 150,000 | $ 49,414 | $ 49,414 | 100 |
2007 | Baltimore City | 30.030.07 | #055 Hampden Elementary | Playground equipment | Provide play equipment and safety surfacing. | $ 120,000 | $ 85,726 | $ 85,726 | 100 |
2007 | Baltimore City | 30.251.07 | #223 Pimlico Elementary | CCTV Installation | Interior and exterior CCTV installation. | $ 149,809 | $ 136,150 | $ 136,150 | 100 |
2007 | Baltimore City | 30.042.07 | #083 William Paca Elementary | Play Area | Resurface hard surface play area at enclosed courtyard. | $ 100,000 | $ 48,842 | $ 48,842 | 100 |
2007 | Baltimore City | 30.147.07 | #133 Paul Laurence Dunbar Middle | Painting | Paint all interior spaces, classrooms, corridors, stairs, bathrooms, common areas, trims, and railings. | $ 91,500 | $ 128,500 | $ 128,500 | 100 |
2007 | Baltimore City | 30.144.07 | #013 Tench Tilghman Elementary/Middle | Door Replacement | Replace all exterior doors with new FRP doors and frames. | $ 88,000 | $ 79,831 | $ 79,831 | 100 |
2007 | Baltimore City | 30.017.07 | #027 Commodore John Rodgers Elementary | Door Replacement | Replace all exterior doors and frames with a new FRP. | $ 87,500 | $ 85,412 | $ 85,412 | 100 |
2007 | Baltimore City | 30.264.07 | #170 Thurgood Marshall Middle | P.A. System | Install separate P.A. and bell system for #420 Samuel Banks High. | $ 80,000 | $ 28,159 | $ 28,159 | 100 |
2007 | Baltimore City | 30.168.07 | #130 Booker T. Washington Middle | P.A. System | Install separate PA and bell system for #433 Renaissance Academy High. | $ 80,000 | $ 17,498 | $ 17,498 | 100 |
2007 | Baltimore City | 30.144.07 | #013 Tench Tilghman Elementary/Middle | P.A. System | Upgrade existing PA and bell system. | $ 80,000 | $ 15,081 | $ 15,081 | 100 |
2007 | Baltimore County | 03.156.07 | Grange Elementary | Window Replacement | Removal and replacement of all aged windows. | $ 1,021,000 | $ 1,021,000 | $ 1,251,930 | 100 |
2007 | Baltimore City | 30.072.07 | #215 Highlandtown Elementary/Middle | Door Replacement | Replace all Exterior Doors and Frames with new FRP doors. | $ 72,000 | $ 48,390 | $ 48,390 | 100 |
2007 | Baltimore City | 30.017.07 | #027 Commodore John Rodgers Elementary | Locker Replacement | Student lockers for 3rd floor classrooms (full size). | $ 11,000 | $ 28,378 | $ 28,378 | 100 |
2007 | Cecil | 07.040.07 | North East High | Bleacher Replacement | Remove old unsafe existing bleacher manual system with an electronic bleacher system that meets all ADA codes in gymnasium. | $ 76,025 | $ 76,025 | $ 78,520 | 100 |
2007 | Dorchester | 09.001.07 | Sandy Hill Elementary | Flooring | Replace original, 32-year-old carpet in Media Center, Pods 1-3, PK, Planning and Staff Development Areas and Corridors 1 and 2. | $ 80,000 | $ 65,000 | $ 65,000 | 100 |
2007 | Garrett | 11.014.07 | Northern High | Fire Alarm System | The fire alarm system is outdated and unreliable causing false alarms as well as no alarms when needed. | $ 65,000 | $ 65,000 | $ 65,000 | 100 |
2007 | Talbot | 20.009.07 | Tilghman Elementary | Playground Replacement | Replacement of an aging playground at Tilghman Elementary School with an ADA compliant playground for intermediate age children, 5-12. Plantings and benches will be included. | $ 115,000 | $ 110,000 | $ 110,000 | 100 |
2007 | Baltimore City | 30.182.07 | #042 Garrison Middle | Door Replacement | Replace all exterior doors/frames with new FRP doors and frames. | $ 98,000 | $ 75,792 | $ 75,792 | 100 |
2007 | Baltimore City | 30.182.07 | #042 Garrison Middle | Door Replacement | Replace Interior Fire Doors. | $ 97,000 | $ 80,017 | $ 80,017 | 100 |
2007 | Cecil | 07.013.07 | Perryville High | Chiller Replacement | $ 139,847 | $ 139,847 | $ 139,847 | 100 | |
2007 | Cecil | 07.015.07 | Chesapeake City Elementary | Carpet Replacement | Carpet and cove base replacement in kindergarten pod (~2800 sf.). | $ 18,540 | $ 18,540 | $ 18,540 | 100 |
2007 | Harford | 12.006.07 | Aberdeen Middle | Main Electric Service Entrance Replacement | $ 100,000 | $ 100,000 | $ 78,000 | 100 | |
2007 | Harford | 12.005.07 | Havre de Grace High | AC Unit Replacement | Replace 3 AC Units | $ 250,000 | $ 250,000 | $ 250,000 | 100 |
2007 | Harford | 12.007.07 | North Harford Middle | Carpet Replacement | Replace media center carpet | $ 25,000 | $ 25,000 | $ 14,700 | 100 |
2007 | Prince George's | 16.148.07 | Rockledge Elementary | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 225,000 | $ 225,000 | $ 148,019 | 100 | |
2007 | Prince George's | 16.119.07 | Pointer Ridge Elementary | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 240,000 | $ 240,000 | $ 148,019 | 100 | |
2007 | Prince George's | 16.157.07 | Rose Valley Elementary | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 205,000 | $ 205,000 | $ 148,019 | 100 | |
2007 | Wicomico | 22.017.07 | Fruitland Intermediate | Masonry Gym Wall Restoration | There has been noticeable deterioration in the exterior wall of the gym. Needs to be cleaned, tuck pointed and sealed. | $ 20,000 | $ 20,000 | $ 20,000 | 100 |
2007 | Wicomico | 22.001.07 | Parkside High | Tennis Court Resurface and Refurbishment | The existing tennis courts which were constructed as part of the original school back in 1974 are cracked and failing due to wear and differential settlement and need replacement. The new scope would require that the existing wearing surface and base be removed, re-milled where feasible and the base be reconstructed. A new wearing surface would then be reapplied. An alternate for resurfacing and repairing a detached (5th) court would also be included should budget allow. | $ 257,630 | $ 147,127 | $ 147,127 | 100 |
2007 | Cecil | 07.028.07 | Cecil County School of Technology | Replace original main breaker panel that is water damaged over the years where underground water is flowing through the conduit and into the panel. | Replace original main breaker panel that is water damaged over the years where underground water is flowing through the conduit and into the panel. | $ 15,000 | $ 15,000 | $ 11,000 | 100 |
2007 | Prince George's | 16.017.07 | H. W. Wheatley Special Education | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 230,000 | $ 230,000 | $ 148,019 | 100 | |
2007 | Prince George's | 16.018.07 | Paint Branch Elementary | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 220,000 | $ 220,000 | $ 148,019 | 100 | |
2007 | Prince George's | 16.113.07 | James Harrison Elementary | Replace all doors and deteriorated storefronts. Flooring will be replaced in areas adjacent to storefronts. | $ 250,000 | $ 250,000 | $ 148,019 | 100 | |
2007 | Prince George's | 16.011.07 | Largo High | Folding Door Partition | Replace 6 folding partition walls throughout building. | $ 109,932 | $ 109,932 | $ 114,296 | 100 |
2007 | Prince George's | 16.002.07 | Eleanor Roosevelt High | Partition Replacement | Replace partition in gym. | $ 42,005 | $ 42,005 | $ 42,005 | 100 |
2007 | Prince George's | 16.041.07 | C. Elizabeth Reig Special Education | Folding Door Partition | Replace folding partition wall in Multi-purpose room. | $ 69,581 | $ 69,581 | $ 69,581 | 100 |
2007 | Prince George's | 16.144.07 | Catherine T. Reed Elementary | Partition Replacement | Replace partition in Media Center. | $ 49,405 | $ 52,023 | $ 52,023 | 100 |
2007 | Prince George's | 16.223.07 | Chapel Forge Early Childhood Center | Partition Replacement | Replace partition in Media Center. | $ 49,405 | $ 52,023 | $ 52,023 | 100 |
2007 | Prince George's | 16.120.07 | Forest Heights Elementary | Plumbing fixtures Replacement | Replace plumbing fixtures throughout building. | $ 40,000 | $ 40,000 | $ 24,765 | 100 |
2007 | Prince George's | 16.215.07 | Benjamin Foulois Elementary | Plumbing fixtures Replacement | Replace plumbing fixtures throughout building. | $ 40,000 | $ 40,000 | $ 41,382 | 100 |
2007 | Prince George's | 16.085.07 | High Point High | Plumbing fixtures Replacement | Replace plumbing fixtures throughout building. | $ 40,000 | $ 50,070 | $ 50,070 | 100 |
2007 | Prince George's | 16.197.07 | Andrew Jackson Middle | Plumbing fixtures Replacement | Replace plumbing fixtures throughout building. | $ 40,000 | $ 40,000 | $ 47,652 | 100 |
2007 | Prince George's | 16.214.07 | Fort Foote Elementary | Flooring | Replace flooring in halls and select classrooms; all hallways, Main Office, Rooms: 6 and 10. | $ 124,000 | $ 124,000 | $ 125,231 | 100 |
2007 | Prince George's | 16.183.07 | William Wirt Middle | Flooring | Replace flooring in halls and select classrooms - Entire Third Floor, Rooms 207, 209, Stairwells, Multi-Purpose, including all halls, classrooms will be provided at a later date. | $ 100,000 | $ 75,000 | $ 32,128 | 75 |
2007 | Allegany | 01.004.07 | John Humbird Elementary | Boiler Replacement | The existing cast iron boilers were installed as part of the 1974 renovation. The boilers are inefficient and have reached the end of their useful life. This project will replace the boilers with cast iron, dual fuel, and sectional boilers. The domestic water heaters and holding tank will be replaced. All related pumps, piping, controls, and ATC compressor will also be replaced. The exterior boiler room doors and combustion air vents will be removed and replaced. | $ 290,000 | $ 181,876 | $ 181,876 | 100 |
2007 | Anne Arundel | 02.043.07 | Severn Elementary | Flooring | Replace carpet and tile in the following rooms: Main office including office corridor, Principal, Asst Principal, Guidance, Conference, Pupil Personnel, Psychologist offices, Media Center and Inst. Area, Computer Lab, Room 148, room 153, Speech Room, Kindergarten, Music, Area I (three classrooms), Area II (three classrooms), Area III (three classrooms), Area IV (three classrooms), and Area VI A, B, C. | $ 65,000 | $ 65,000 | $ 52,869 | 100 |
2007 | Anne Arundel | 02.010.07 | Four Seasons Elementary | Flooring | Replace carpet and tile in the following rooms: Music A, Music B, Main office, Corridor, Principal's office, Vice Principal's office, Guidance, Conference A, Conference B, Main Hall, Kindergarten, Media, Pre-K, Computer Lab, Quads 1-6, and Lounge. | $ 195,000 | $ 195,000 | $ 190,776 | 100 |
2007 | Anne Arundel | 02.003.07 | Rippling Woods Elementary | Flooring | Replace carpet and tile in the following rooms: Music A and B, Speech, Room 152, Room 153, Conference A and B, Workroom 112, Workroom 114, Kindergarten, Pre-K, Pod 1 and 2, Pod 3 and 2 rooms attached to Pod 3, Computer Lab, and Media. | $ 150,000 | $ 150,000 | $ 147,177 | 100 |
2007 | Anne Arundel | 02.017.07 | Georgetown East Elementary | Folding Door Partition | Replace folding door partition in cafeteria. | $ 100,000 | $ 94,000 | $ 94,000 | 100 |
2007 | Anne Arundel | 02.002.07 | Old Mill High | Folding Door Partition | Replace folding door partition in auditorium. | $ 150,000 | $ 150,000 | $ 150,000 | 100 |
2007 | Anne Arundel | 02.117.07 | Central Elementary | Folding Door Partition | Replace folding door partition in cafeteria. | $ 65,000 | $ 64,800 | $ 64,800 | 100 |
2007 | Anne Arundel | 02.015.07 | High Point Elementary | Folding Door Partition | Replace folding door partition in cafeteria. | $ 65,000 | $ 64,800 | $ 64,800 | 100 |
2007 | Anne Arundel | 02.093.07 | Brock Bridge Elementary | Folding Door Partition | Replace folding door partition in cafeteria. | $ 65,000 | $ 64,800 | $ 64,800 | 100 |
2007 | Frederick | 10.023.07 | Parkway Elementary | Roof Replacement | Replace roof; E Section (3,904 sf) of EDPM roof. | $ 54,000 | $ 53,000 | $ 54,579 | 100 |
2007 | Frederick | 10.023.07 | Parkway Elementary | Window Replacement | Replace 40 windows Phase II | $ 80,000 | $ 75,000 | $ 75,000 | 100 |
2007 | Frederick | 10.075.07 | Walkersville "B" Adult Education/Evening High | Window Replacement | Phase II | $ 67,575 | $ 60,000 | $ 60,000 | 100 |
2007 | Frederick | 10.009.07 | Frederick High | Masonry Repairs/Brick Repointing | $ 90,000 | $ 60,000 | $ 60,421 | 100 | |
2007 | Frederick | 10.060.07 | Lewistown Elementary | Playground Repairs | Repairs and replacing of hard surface of playground, dumpster pad, and driveway. | $ 68,646 | $ 62,000 | $ 60,000 | 100 |
2007 | Wicomico | 22.018.07 | Mardela Middle/High | Water Well Replacement | Plumbing/Mechanical; the existing domestic 6" water well is beginning to fail and a new well is required. This will include casing, submersible pump, flushing and re-chlorination. A new expansion tank is not included under this scope. | $ 57,839 | $ 57,839 | $ 57,839 | 100 |
2007 | Wicomico | 22.017.07 | Fruitland Intermediate | Flooring | The existing cafeteria floor (renovation circa 1991) consist of vinyl tile with a cork backing. It is extremely soft and has not worn well under the constant load and movement of cafeteria tables over the years and is now worn through in several locations. The scope will include the removal and disposal of the existing floor tile and the prep and replacement of a new VCT material. High compressive strength VCTs such as quartz tile will also be considered as alternate replacement floor covering. | $ 24,701 | $ 24,701 | $ 24,701 | 100 |
2007 | Wicomico | 22.002.07 | Pinehurst Elementary | Structural Repairs | Carpentry; the interconnecting west wing hallway floor at the elevator lobby is sagging and the under floor structure needs to be replaced. This is an area within the original 1935 school. The area is original wood construction and it is believed that the original tongue and groove decking and sub floor has delaminated from the structure. From limited visual observation it does not appear that structural failure is at hand. The scope would include for the controlled demolition to facilitate inspection and to replace and repair the substructure and floor as may be required. | $ 18,360 | $ 18,360 | $ 18,360 | 100 |
2007 | Baltimore County | 03.121.07 | Parkville High | Main electric feeder replacement | $ 246,500 | $ 246,500 | $ 227,600 | 0 | |
2007 | Baltimore County | 03.041.07 | Dundalk Middle | Bleacher Replacement | Replace aged gym bleachers. | $ 45,000 | $ 45,000 | $ 43,432 | 0 |
2007 | Baltimore County | 03.049.07 | Dumbarton Middle | Bleacher Replacement | Replace aged gym bleachers. | $ 45,000 | $ 45,000 | $ 37,922 | 0 |
2007 | Baltimore County | 03.127.07 | Franklin Middle | Bleacher Replacement | Replace aged gym bleachers. | $ 62,000 | $ 62,000 | $ 65,231 | 0 |
2007 | Baltimore County | 03.050.07 | Woodlawn High | Flooring | Replace gym floor. | $ 261,991 | $ 261,991 | $ 291,675 | 0 |
2007 | Washington | 21.031.07 | Williamsport High | Mechanical Room Asbestos Removal | Remove asbestos insulations on the duct work and piping in mechanical rooms and re-insulate. | $ 230,000 | $ 229,000 | $ 229,000 | 0 |
2007 | Kent | 14.002.07 | Galena Middle | Ceiling Tile Replacement | Remove and replace metal ceiling tile in classroom Rms:37,22,20,18,16,24,19,25,26,27, and Sci prep room. | $ 54,060 | $ 36,396 | $ 36,396 | 0 |
2007 | Worcester | 23.013.07 | Cedar Chapel Special School | Electrical upgrade | Install new electrical sub-panel to accommodate electrical demands generated by multi-sensory therapy equipment added to classrooms in recent years. | $ 15,000 | $ 15,000 | $ 9,779 | 0 |
2007 | Worcester | 23.007.07 | Buckingham Elementary | Window Replacement | Replace fourteen glass and metal wall panels which date from original 1978 construction. Panels have rust and leak. | $ 20,000 | $ 20,000 | $ 20,200 | 0 |
2007 | Worcester | 23.012.07 | Berlin Intermediate | Repair Ceramic Tile | Repair and replace cracked, damaged and missing ceramic tile on Cafetorium walls. | $ 15,000 | $ 15,000 | $ 15,027 | 0 |
2007 | Worcester | 23.012.07 | Berlin Intermediate | Repair Tennis Courts | Repair and patch cracked surface and paint surface of two tennis courts. | $ 15,000 | $ 15,000 | $ 12,400 | 0 |
2007 | Kent | 14.006.07 | Garnett Elementary | Replace in-wall Palmer Hamilton cafeteria tables. | $ 28,604 | $ 28,604 | $ 28,600 | 0 | |
2007 | Calvert | 04.007.07 | Mt. Harmony Elementary | Door Replacement | Replace the rusted hollow metal doors on the west wing with aluminum doors. Three pairs of doors and one single door. | $ 19,800 | $ 19,800 | $ 20,314 | 0 |
2007 | Calvert | 04.010.07 | Huntingtown Elementary | Door Replacement | Replace the rusted original hollow metal window system with an aluminum system in the courtyard and the east exit. | $ 17,700 | $ 17,700 | $ 18,191 | 0 |
2007 | Calvert | 04.002.07 | Mutual Elementary | Flooring | Remove and replace carpet in the media center, music room, and existing kindergarten rooms. | $ 27,500 | $ 27,500 | $ 19,930 | 0 |
2007 | Charles | 08.029.07 | Gale-Bailey Elementary | Classroom Unit Ventilator Replacement | Replacement of 24 classroom unit ventilators and condensing units. | $ 118,488 | $ 85,000 | $ 85,000 | 0 |
2007 | Carroll | 06.002.07 | Northwest Middle | Domestic water lines | Change existing domestic water lines from galvanized to copper piping. | $ 42,000 | $ 42,000 | $ 37,000 | 0 |
2007 | Caroline | 05.003.07 | Denton Elementary | HVAC | HVAC System for Administration Area | $ 27,000 | $ 27,000 | $ 27,000 | 100 |
2007 | Howard | 13.013.07 | Atholton High | Bleacher replacement | Remove and replace existing interior, gymnasium bleachers (both sides). | $ 255,000 | $ 149,000 | $ 96,900 | 100 |
2007 | Allegany | 01.020.07 | Flintstone Elementary | Carpet Replacement | The carpet is original to the 1978 renovation. This project will remove the existing carpet, install VCT in the hallways and main circulation areas. Modular carpet tile will be installed in the open pod areas. | $ 85,000 | $ 80,000 | $ 58,784 | 100 |
2007 | Baltimore City | 30.243.07 | #095 Franklin Square Elementary | Intercom System | Replacement of a system that has exceeded its service life and is no longer manufactured. In addition, spare parts are no longer available. | $ 18,100 | $ 18,053 | $ 18,053 | 100 |
2007 | Baltimore City | 30.149.07 | #220 Morrell Park Elementary | Emergency Generator Replacement | Replace emergency Generator | $ 31,000 | $ 26,488 | $ 26,488 | 100 |
2007 | Baltimore City | 30.110.07 | #480 Baltimore City College High | Heat Exchanger Replacement | Shell and tube heat exchanger where over 50% of the tubes have failed. | $ 35,000 | $ 71,290 | $ 71,290 | 100 |
2007 | Baltimore City | 30.130.07 | #005 Langston Hughes Elementary | Asphalt/Concrete | Concrete replacement to existing sidewalk where upheaval and cracking have created a major tripping hazard. | $ 25,200 | $ 25,200 | $ 25,200 | 100 |
2007 | Baltimore City | 30.229.07 | #242 Northwood Elementary | Asphalt/Concrete | Repaving of sidewalks. Upheaval and creaking have created a hazardous condition. | $ 40,600 | $ 40,600 | $ 40,600 | 100 |
2007 | Baltimore City | 30.164.07 | #405 Patterson High | Lighting | Wall pack installation in the building that presently has no emergency lighting. | $ 12,000 | $ 11,898 | $ 11,898 | 100 |
2007 | Baltimore City | 30.260.07 | #054 Barclay Elementary/Middle | Door Replacement | Replace Main Entrance set of doors and frames. Existing are wooden and require replacement. | $ 17,500 | $ 17,255 | $ 17,255 | 100 |
2007 | Baltimore City | 30.130.07 | #005 Langston Hughes Elementary | Door Replacement | Replace Main Entrance set of doors. Existing doors are wooden and are irreparable. | $ 13,500 | $ 13,358 | $ 13,358 | 100 |
2007 | Baltimore City | 30.130.07 | #005 Langston Hughes Elementary | Flooring Replacement | Replace carpet with VCT at 2nd floor areas. | $ 17,000 | $ 16,762 | $ 16,762 | 100 |
2007 | Baltimore City | 30.203.07 | #122 Samuel Coleridge Taylor Elementary | Compressors Replacement | Replace Compressors for 2 Roof Top Units to provide air conditioning for the building. | $ 15,000 | $ 14,838 | $ 14,838 | 100 |
2007 | Baltimore City | 30.110.07 | #480 Baltimore City College High | Heat Exchanger Replacement | Replacement of steam coil. | $ 40,000 | $ 43,540 | $ 43,540 | 97 |
2007 | Carroll | 06.006.07 | Charles Carroll Elementary | Door Replacement | Exterior Door and Hardware Replacement. | $ 60,000 | $ 33,970 | $ 27,682 | 100 |
2007 | Baltimore County | 03.020.07 | Mars Estates Elementary | Chiller Replacement | Replace failed chiller. | $ 75,000 | $ 75,000 | $ 75,000 | 100 |
2007 | Somerset | 19.004.07 | Crisfield High | Construct athletic storage building 30' X 40', stadium fencing, and baseball field fencing (2 fields). | $ 65,000 | $ 65,000 | $ 65,000 | 1 | |
2007 | Baltimore City | 30.057.07 | #105A Moravia Elementary | Carpet Replacement | Replace with VCT at 1st and 3rd floor open classroom areas, and replace existing carpet with new carpet at multipurpose and media center area. | $ 122,000 | $ 121,682 | $ 121,682 | |
2007 | Baltimore City | 30.094.07 | #234 Arlington Elementary/Middle | Painting | Paint all interior spaces, classrooms, corridors, stairs, bathrooms, common areas, trims, and railings. | $ 90,000 | $ 85,417 | $ 85,417 | |
2008 | Cecil | 07.020.08 | Perryville Elementary | Window Replacement | Phase II Exterior Window Replacement; existing windows are in disrepair and are an energy conservation concern. This request is to replace an additional 20%-30% of the existing windows (includes ACM abatement). | $ 119,090 | $ 119,090 | $ 143,757 | 100 |
2008 | Worcester | 23.007.08 | Buckingham Elementary | Playground Site Redevelopment | Repair and repave asphalt playground area. | $ 23,500 | $ 23,500 | $ 23,232 | 100 |
2008 | Worcester | 23.009.08 | Snow Hill Middle | Stage Curtain | Replace existing stage folding partition curtain with new folding partition curtain in fine arts facility. | $ 23,800 | $ 23,800 | $ 24,986 | 100 |
2008 | Prince George's | 16.103.08 | Surrattsville High | Painting | Paint interior | $ 160,000 | $ 183,840 | $ 183,840 | 1 |
2008 | Prince George's | 16.089.08 | Bowie High | Painting | Paint interior | $ 190,000 | $ 190,000 | $ 190,000 | 1 |
2008 | Prince George's | 16.083.08 | Frederick Douglass High | Painting | Interior/exterior painting. | $ 185,000 | $ 185,000 | $ 185,000 | 1 |
2008 | Prince George's | 16.216.08 | Potomac High | Painting | Paint interior | $ 181,000 | $ 181,000 | $ 181,000 | 1 |
2008 | Prince George's | 16.043.08 | Kettering Middle | Painting | Interior painting. | $ 90,000 | $ 90,000 | $ 90,000 | 1 |
2008 | Prince George's | 16.119.08 | Pointer Ridge Elementary | Painting | Paint interior | $ 75,000 | $ 75,000 | $ 54,500 | 1 |
2008 | Prince George's | 16.157.08 | Rose Valley Elementary | Painting | Paint interior | $ 78,000 | $ 78,000 | $ 46,950 | 1 |
2008 | Prince George's | 16.195.08 | Kenilworth Elementary | Painting | Paint interior | $ 46,000 | $ 46,000 | $ 45,760 | 1 |
2008 | Prince George's | 16.004.08 | Marlton Elementary | Painting | Interior painting. | $ 45,000 | $ 45,000 | $ 44,850 | 1 |
2008 | Prince George's | 16.119.08 | Pointer Ridge Elementary | Flooring | Replace carpet/tile 12 classrooms, library and office. | $ 35,000 | $ 35,000 | $ 29,900 | 1 |
2008 | Prince George's | 16.017.08 | H. W. Wheatley Special Education | Flooring | Replace carpet with tile. | $ 90,000 | $ 90,000 | $ 69,617 | 1 |
2008 | Anne Arundel | 02.040.08 | Arundel High | Bleachers Replacement | Replace Indoor Bleachers. | $ 152,000 | $ 152,000 | $ 152,000 | 100 |
2008 | Anne Arundel | 02.040.08 | Arundel High | Folding Doors Replacement | Replace Folding Doors. | $ 235,000 | $ 235,000 | $ 235,000 | 1 |
2008 | Anne Arundel | 02.107.08 | Oak Hill Elementary | Folding Doors Replacement | Replace Folding Doors. | $ 65,000 | $ 65,000 | $ 65,000 | 1 |
2008 | Anne Arundel | 02.073.08 | Glen Burnie Park Elementary | Fire Alarm Replacement | Replace Fire Alarm. | $ 175,000 | $ 165,000 | $ 165,000 | 1 |
2008 | Carroll | 06.020.08 | Eldersburg Elementary | Exterior Soffit Asbestos Abatement/Replacement | 1,600 sf exterior soffits that have asbestos containing materials (ACM's). | $ 23,125 | $ 23,125 | $ 23,125 | 100 |
2008 | Carroll | 06.020.08 | Eldersburg Elementary | Interior Panels and Doors Asbestos Abatement | Replace 20 interior panels, 15 doors and hardware that have ACM's. | $ 33,545 | $ 33,545 | $ 40,960 | 100 |
2008 | Carroll | 06.003.08 | Westminster Elementary | Roofing Repairs to EPDM roof | Clean and overlay approximately 9000 lineal feet of seams and repair two 10' x 10' deteriorated areas. | $ 37,220 | $ 37,220 | $ 37,220 | 100 |
2008 | Carroll | 06.004.08 | Westminster East Middle | Interior Doors Asbestos Abatement | Replace 34 Interior doors, transoms and hardware that have ACM's. | $ 105,088 | $ 105,088 | $ 106,191 | 100 |
2008 | Carroll | 06.002.08 | Northwest Middle | Interior Doors Asbestos Abatement | Replace 16 interior doors and hardware that have ACM's. | $ 24,014 | $ 24,014 | $ 27,831 | 100 |
2008 | Carroll | 06.001.08 | North Carroll High | Doors and Hardware Replacement and Asbestos Abatement | Replace doors and/or hardware on 43 fire rated doors. Replace 6 of these doors due to them containing ACM's. | $ 69,195 | $ 69,195 | $ 67,195 | 100 |
2008 | Wicomico | 22.015.08 | Wicomico Middle | Masonry Repair | Masonry Repair (4) of "A" Wing, 1931 Bldg (East Elevation) approximately 6,300 sf. Surfaces to be cleaned and anticipated repairs include tuck-pointing, replacing control joints and window sealants and refurbishing steel lintels to prevent further water infiltration. | $ 83,319 | $ 83,319 | $ 81,975 | 100 |
2008 | Washington | 21.031.08 | Williamsport High | Partial Locker Replacement | Replace existing corridor lockers with new. | $ 130,000 | $ 122,780 | $ 122,780 | 100 |
2008 | Talbot | 20.004.08 | Easton Middle | Interactive fitness area | $ 74,884 | $ 74,872 | $ 74,884 | 1 | |
2008 | Talbot | 20.004.08 | Easton Middle | Par course fitness center area | $ 46,000 | $ 23,000 | $ 23,000 | 1 | |
2008 | Baltimore County | 03.011.08 | Perry Hall High | Penthouse Floor Replacement | Replace floor drains and seal Rooftop Penthouse floating floor. | $ 172,800 | $ 170,300 | $ 170,300 | 100 |
2008 | Howard | 13.016.08 | Hammond High | Locker Replacement | Remove and replace existing interior lockers, frames, bases, and all associated trim and hardware. | $ 123,000 | $ 84,630 | $ 84,630 | 100 |
2008 | Harford | 12.006.08 | Aberdeen Middle | Structural | Replacement of stucco ceiling and associated structural walkway. | $ 52,000 | $ 37,000 | $ 37,000 | 100 |
2008 | Harford | 12.024.08 | Bel Air Elementary | Carpet Replacement | $ 70,000 | $ 70,000 | $ 70,000 | 100 | |
2008 | Queen Anne's | 17.004.08 | Centreville Middle | Flooring Replacement | $ 38,000 | $ 38,000 | $ 30,565 | 1 | |
2008 | Queen Anne's | 17.021.08 | Bayside Elementary | Carpet | Hallway carpet replacement. | $ 12,000 | $ 12,000 | $ 10,513 | 1 |
2008 | Baltimore City | 30.045.08 | #087 Windsor Hills Elementary/Middle | Cooling tower Replacement | Replace cooling tower. | $ 86,000 | $ 59,125 | $ 59,125 | 100 |
2008 | Baltimore City | 30.092.08 | #233 Roland Park Elementary/Middle | Painting | Paint all stairwells and kitchen. | $ 24,895 | $ 24,787 | $ 24,787 | 100 |
2008 | Baltimore City | 30.092.08 | #233 Roland Park Elementary/Middle | Boiler Replacement | Replace 2 boilers. | $ 199,250 | $ 199,250 | $ 199,250 | 100 |
2008 | Baltimore City | 30.076.08 | #213 Govans Elementary | Ceiling Repair | Repair all drywall and scrape ceiling and apply full primer and two finish coats. | $ 11,925 | $ 11,883 | $ 11,883 | 100 |
2008 | Baltimore City | 30.232.08 | #105B Moravia Park Building | CCTV Replacement | Install new CCTV. | $ 47,651 | $ 46,959 | $ 46,959 | 100 |
2008 | Baltimore City | 30.057.08 | #105A Moravia Park Building | Painting | Paint 1st and 2nd floor hallways, all stairwells, kitchen, cafeteria and main office. | $ 23,950 | $ 23,707 | $ 23,707 | 100 |
2008 | Baltimore City | 30.232.08 | #105B Moravia Park Building | Boiler Replacement | Replace boiler #1. | $ 146,600 | $ 146,600 | $ 146,600 | 100 |
2008 | Baltimore City | 30.020.08 | #039 Dallas F. Nicholas Elementary | Replace 1,750 sf concrete pavement walkway. | $ 28,500 | $ 24,500 | $ 24,500 | 100 | |
2008 | Baltimore City | 30.198.08 | #031 Coldstream Park Elementary | Replace/repair chimney, roof, and crown | $ 28,472 | $ 28,472 | $ 28,472 | 100 | |
2008 | Baltimore City | 30.206.08 | #046 Chinquapin Middle | Asphalt Replacement | Replace asphalt surface rear parking lot. | $ 107,535 | $ 107,535 | $ 107,535 | 100 |
2008 | Baltimore City | 30.206.08 | #046 Chinquapin Middle | Concrete Replacement | Replace concrete steps and sidewalk. | $ 60,000 | $ 63,099 | $ 63,099 | 100 |
2008 | Baltimore City | 30.269.08 | #086 Lakewood Early Learning Center | Flooring | Replace tile floor in 1st and 2nd corridors. | $ 66,000 | $ 18,400 | $ 18,400 | 100 |
2008 | Baltimore City | 30.201.08 | #204 Mary Rodman Elementary | Rescreen gym floor | Work would comprise of replacement of 25% of wood floor. Then refinishing entire floor by wet screening. | $ 15,000 | $ 14,726 | $ 14,726 | 100 |
2008 | Baltimore City | 30.230.08 | #160 Dr. Carter G. Woodson Elementary/Middle | Concrete Replacement | Replace concrete slabs atop steps and correction of steps. | $ 45,000 | $ 52,936 | $ 52,936 | 100 |
2008 | Baltimore City | 30.189.08 | #210 Hazelwood Elementary/Middle | Concrete Replacement | Replace concrete curbs to right of building and the left front curb and driveway curb. The sidewalk leading to the left of the school and ADA ramp. | $ 47,000 | $ 51,950 | $ 51,950 | 100 |
2008 | Baltimore City | 30.255.08 | #201 Dickey Hill Elementary/Middle | Concrete Replacement | Replace Concrete walkways. | $ 13,200 | $ 18,630 | $ 18,630 | 100 |
2008 | Baltimore City | 30.255.08 | #201 Dickey Hill Elementary/Middle | Asphalt Replacement | Re-asphalt parking area. | $ 37,000 | $ 33,900 | $ 33,900 | 100 |
2008 | Baltimore City | 30.053.08 | #097 Collington Square Elementary/Middle | Exterior doors and frames Replacement | Replace 45 exterior doors and frames. | $ 122,941 | $ 107,571 | $ 107,571 | 100 |
2008 | Baltimore City | 30.270.08 | #085 Fort Worthington Elementary | Ceiling Replacement | Replace ceiling grid and tiles. | $ 85,350 | $ 84,705 | $ 84,705 | 100 |
2008 | Baltimore City | 30.243.08 | #095 Franklin Square Elementary/Middle | Underground fuel tank Replacement | Replace underground fuel tank (installed 1961). | $ 144,000 | $ 197,029 | $ 197,029 | 100 |
2008 | Kent | 14.006.08 | Garnett Elementary | Restroom Renovation | $ 74,872 | $ 55,872 | $ 55,872 | 100 | |
2008 | Queen Anne's | 17.021.08 | Bayside Elementary | Fire Alarm Upgrade | Upgrade the existing fire alarm system. | $ 55,000 | $ 47,910 | $ 33,640 | 100 |
2008 | Charles | 08.001.08 | Dr. James Craik Elementary | Carpet and Floor Covering | Recarpet and tile entire school. | $ 238,580 | $ 18,911 | $ 18,911 | 100 |
2008 | Caroline | 05.003.08 | Denton Elementary | Connect school to town water | Tap into the town's water line, install underground piping from that point to our domestic water entry point of the school, and disconnect the existing on-site wells and cap them. The cost also includes disturbing existing sidewalks, asphalt parking lots and curbing. | $ 48,910 | $ 48,910 | $ 47,650 | 100 |
2008 | Caroline | 05.006.08 | Ridgely Elementary | Replace hot water heating pumps | $ 12,000 | $ 12,000 | $ 12,202 | 100 | |
2008 | Baltimore County | 03.121.08 | Parkville High | Stage Equipment | Repair/replace catwalk and loading bridge; install safety cage and platform loading gallery. | $ 95,208 | $ 95,208 | $ 95,208 | 100 |
2008 | Baltimore County | 03.148.08 | Kenwood High | Stage Equipment | Replace stage rigging. | $ 90,000 | $ 90,000 | $ 90,000 | 1 |
2008 | Baltimore County | 03.006.08 | Cockeysville Middle | Sewer Line | Replace 6" sewer line from building to clean out at property line. | $ 60,000 | $ 60,000 | $ 51,187 | 100 |
2008 | Garrett | 11.002.08 | Friendsville Elementary | Fire Alarm Upgrade | Replace fire alarm system | $ 24,352 | $ 24,352 | $ 19,130 | 100 |
2008 | Calvert | 04.011.08 | Beach Elementary | Carpet Tile | Removal of original carpeting in the 1980 addition. | $ 17,850 | $ 17,826 | $ 17,326 | 100 |
2008 | Calvert | 04.014.08 | Sunderland Elementary | Carpet | Removal of original carpeting in the Media and 1st grade classrooms. | $ 12,500 | $ 12,500 | $ 12,500 | 100 |
2008 | Calvert | 04.025.08 | Calvert Career Center | Water Well | Lower well pump 40 feet and new pump. | $ 12,000 | $ 11,790 | $ 11,790 | 100 |
2008 | Calvert | 04.004.08 | Calvert Elementary | Tile and Carpet | Removal of vinyl asbestos tile and mastics from various classrooms and replace with new floor coverings such as vinyl tile and carpet. | $ 80,000 | $ 32,522 | $ 32,522 | 100 |
2008 | Garrett | 11.006.08 | Broad Ford Elementary | Sidewalk replacement | $ 21,519 | $ 21,519 | $ 21,519 | 1 | |
2008 | Baltimore County | 03.021.08 | Maiden Choice Special Education | Floor Tile | Remove and replace floor tile in 17 classrooms, Gym and Cafeteria. | $ 95,000 | $ 95,000 | $ 95,000 | 100 |
2008 | Allegany | 01.002.08 | Beall Elementary | Bus Drop-off | School is located on a 3 acre site in a highly congested residential neighborhood adjacent to Frostburg State University. The site elevation drops a total of 48 feet from front to back. Currently busses drop students off on Broadway Street. Parents drop students off on College Avenue. Traffic flow near the school is disrupted during student arrival and dismissal on school days. The first phase of this project will consist of construction of a bus drop off area at the north east corner of the site. The planned drop-off area will be large enough to allow 2 busses to pull off the street to drop off students. The second phase will consist of construction of a parent drop-off at the east side of the school. Re-grading of the site will necessitate the reconstruction of the teacher parking area and installation of a storm water management system. The third phase will consist of repairs to the concrete retaining wall which is believed to date from the 1930s. The wall at the rear of the property is over 800 lineal feet and varies in height from 1.5’ to 12.5’. The surfaces of the wall and construction joints have degraded. An engineering study including test borings of the concrete have been completed. | $ 400,000 | $ 153,212 | $ 153,212 | 1 |
2008 | St. Mary's | 18.002.08 | Spring Ridge Middle | Health, Guidance and Behavior Management Area Modifications | $ 65,568 | $ 46,910 | $ 46,910 | 1 | |
2008 | Somerset | 19.003.08 | J. M. Tawes Vo-Tech | Athletic Storage Building | 40 X 60 barn type storage building. | $ 56,872 | $ 56,000 | $ 56,872 | 1 |
2008 | Dorchester | 09.001.08 | Sandy Hill Elementary | Paving repairs | Paving repairs to bus loop, parking lots, and aprons. Slurry Seal Pave 38,000 sq. ft.; Hot Mix Repair 4,000 sq. ft.; Crack Repair 3,200 ft.; Striping 640 ft. | $ 33,700 | $ 33,700 | $ 25,590 | 1 |
2008 | Dorchester | 09.017.08 | Judy Hoyer Center | Paving repairs | Paving repairs to bus loop/driveway/parking. Hot Mix Paving complete 18,000 sq. ft.; Striping 200 ft. | $ 13,500 | $ 13,500 | $ 13,500 | 1 |
2008 | Montgomery | 15.194.08 | Maryvale Elementary | Exterior Window Replacement | Original badly rusted causing security issues. New windows will enhance energy savings. (Approx. 30% of the building) | $ 83,496 | $ 83,496 | $ 83,496 | 1 |
2008 | Montgomery | 15.118.08 | Emory Grove Center | Exterior Window Replacement | Original badly rusted causing security issues. New windows will enhance energy savings (Approx. 40% of the building). (Phase 2 of 2). | $ 75,972 | $ 75,972 | $ 76,188 | 1 |
2008 | Montgomery | 15.035.08 | Broad Acres Elementary | Lighting and Ceiling Replacement | Replace damaged and stained acoustical ceilings system and original lighting in 50% of the corridors and the IMC. This will capture energy savings and address IAQ complaints. | $ 68,002 | $ 68,002 | $ 75,403 | 1 |
2008 | Montgomery | 15.164.08 | Brooke Grove Elementary | Painting | Exterior and Interior Painting. | $ 37,350 | $ 37,350 | $ 37,350 | 1 |
2008 | Montgomery | 15.093.08 | Olney Elementary | Exterior and Interior Painting | Paint in poor condition, original paint. | $ 28,800 | $ 28,800 | $ 28,800 | 1 |
2008 | Montgomery | 15.235.08 | Sligo Middle | Painting | Exterior and Interior Painting. | $ 79,815 | $ 79,815 | $ 87,160 | 1 |
2008 | Montgomery | 15.157.08 | Stone Mill Elementary | Exterior and Interior Painting | Paint in poor condition, original paint. | $ 44,210 | $ 44,210 | $ 44,210 | 1 |
2008 | Montgomery | 15.144.08 | Gaithersburg Elementary | P.A. System Replacement | Due to repeated failures and inability to secure repair parts. | $ 25,857 | $ 25,857 | $ 25,858 | 1 |
2008 | Montgomery | 15.023.08 | Thomas S. Wootton High | Library Security Gate System | Due to repeated failures and inability to secure repair parts. | $ 10,774 | $ 10,774 | $ 10,774 | 1 |
2008 | Montgomery | 15.158.08 | Quince Orchard High | Flooring | Complete refinishing of the original wood gymnasium floors in the main and auxiliary gymnasium that are cupped and causing trip hazards. | $ 31,177 | $ 31,177 | $ 31,177 | 1 |
2008 | Montgomery | 15.092.08 | Viers Mill Elementary | Multi-Purpose Field Renovation and Drainage Modifications | $ 43,590 | $ 43,590 | $ 43,591 | 1 | |
2008 | Montgomery | 15.066.08 | Poolesville High | Gym Floor | Complete refinishing of the original wood gymnasium floor in the auxiliary gymnasium that was last refinished fifteen years ago and is cupped and causing trip hazards. Also reseal the main gymnasium wood floor. | $ 14,365 | $ 14,365 | $ 14,365 | 1 |
2008 | Frederick | 10.023.08 | Parkway Elementary | Window replacement | Phase III replace 28 windows. | $ 55,000 | $ 50,000 | $ 50,000 | 100 |
2008 | Frederick | 10.075.08 | Walkersville "B" Adult Education/Evening High | Window Replacement | Phase III replace 40 windows. | $ 85,000 | $ 80,000 | $ 80,000 | 100 |
2008 | Frederick | 10.010.08 | Middletown Middle | Window Replacement | Phase I replace 40 windows. | $ 90,000 | $ 87,082 | $ 87,082 | 100 |
2008 | Baltimore County | 03.034.08 | Sandalwood Elementary | HVAC | Phase I; HVAC (partial) system replacement of chiller, cooling tower and condenser with new chiller and condensing unit. | $ 764,800 | $ 757,800 | $ 757,800 | 100 |
2008 | Harford | 12.052.08 | George D. Lisby Elementary @ Hillsdale | Main Electric Service Entrance Replacement | $ 74,500 | $ 74,500 | $ 81,805 | 100 | |
2008 | Wicomico | 22.001.08 | Parkside High | Bus Canopy Repairs | Repair, replace and reroof the original 11' x 182' bus canopy. Scope to include selective demolition and framing, the removal of existing flat roofing, mansard shingles and damaged gypsum deck. Replace with metal decking, asphalt shingles and EPDM membrane, replace lighting and repaint. | $ 77,500 | $ 66,360 | $ 65,515 | 100 |
2009 | Montgomery | 15.224.09 | Mark Twain Spec. Ed. (Blair G. Ewing Center ) | Exterior Masonry Building and Retaining Wall Repairs (Phase I) | $ 78,585 | $ 78,585 | $ 78,585 | 100 | |
2009 | Montgomery | 15.247.09 | Watkins Mill Elementary | Exterior Paint | Paint in poor condition, last painted in 1994. | $ 14,800 | $ 14,800 | $ 14,800 | 100 |
2009 | Montgomery | 15.126.09 | Wheaton Woods Elementary | Concrete Replacement | Concrete sidewalks and masonry knee wall replacements at Main Entrance Area. Sidewalks are cracked and heaving causing a safety concern. | $ 59,741 | $ 59,741 | $ 59,741 | 100 |
2009 | Montgomery | 15.252.09 | Stonegate Elementary | Floor Covering Replacement | Remove and replace worn-out carpet in the Main Office and remove and replace VCT that is cracking and coming up in the main corridor and Classrooms 2,6,11,17,18,19,20,22, and 25. | $ 34,346 | $ 34,346 | $ 34,346 | 100 |
2009 | Montgomery | 15.164.09 | Brooke Grove Elementary | Floor Covering Replacement | Remove and replace worn-out carpet in the IMC, Office, and TV Studio, and remove carpet and install VCT in all classrooms and work rooms. | $ 46,888 | $ 46,888 | $ 46,888 | 100 |
2009 | Montgomery | 15.221.09 | Laytonsville Elementary | Floor Covering Replacement | VCT in all corridors (Existing VCT cracked and loose). | $ 23,450 | $ 23,450 | $ 23,450 | 100 |
2009 | Montgomery | 15.136.09 | Neelsville Middle | Floor Covering Replacement | Remove worn-out carpet in the IMC, Office, and TV Studio, and remove carpet and install VCT in the Staff Lounge, on the Ramps in the Corridors and in Classrooms 100 and 101. | $ 24,373 | $ 24,373 | $ 24,373 | 100 |
2009 | Montgomery | 15.066.09 | Poolesville High | Exterior Window and Door Replacement | Original badly rusted causing water infiltration and security issue. New windows will enhance energy savings. (Locations: Front of building including entrance area, south entrance area, and courtyard area (Phase 1 of 3). | $ 76,566 | $ 76,566 | $ 76,566 | 100 |
2009 | Montgomery | 15.151.09 | Christa McAuliffe Elementary | Exterior Window Replacements | Original badly rusted causing water infiltration and security issue. New windows will enhance energy savings. (Locations: Courtyard and IMC Corridor this section has rusted out prematurely). | $ 51,592 | $ 51,592 | $ 51,592 | 100 |
2009 | Montgomery | 15.064.09 | Col. E. Brooke Lee Middle | Lighting and Ceiling Replacement | Replace damaged and stained original acoustical ceilings system and lighting in the cafeteria, main entrance areas, and front cross corridor by main office. This will capture energy savings and address IAQ complaints. | $ 76,574 | $ 76,574 | $ 76,574 | 100 |
2009 | Montgomery | 15.165.09 | Judith A. Resnick Elementary | Exterior Masonry Wall Repairs | Located in K-1 Areas. | $ 71,010 | $ 71,010 | $ 71,010 | 100 |
2009 | Montgomery | 15.164.09 | Brooke Grove Elementary | Asphalt Replacement | Front parking lots that are in poor condition cracked and heaving causing potholes, and hazards. | $ 48,174 | $ 48,174 | $ 48,174 | 100 |
2009 | Montgomery | 15.138.09 | Rock Creek Forest Elementary | Asphalt Replacement | Parking Lots, Driveways, and Play Areas that are in poor condition cracked and heaving causing potholes, and hazards. | $ 49,786 | $ 49,786 | $ 49,786 | 100 |
2009 | Montgomery | 15.152.09 | Strawberry Knolls Elementary | Asphalt Replacement | Parking lots, driveways, and play areas that are in poor condition cracked and heaving causing potholes, and hazards. | $ 25,640 | $ 25,640 | $ 25,640 | 100 |
2009 | Montgomery | 15.158.09 | Quince Orchard High | Interior/Exterior Painting | Paint in poor condition, original paint. | $ 129,850 | $ 129,850 | $ 129,850 | 100 |
2009 | Montgomery | 15.163.09 | Rachel Carson Elementary | P.A. System Replacement | Due to repeated failure, and ability to secure repair parts. | $ 23,342 | $ 23,342 | $ 23,342 | 100 |
2009 | Montgomery | 15.233.09 | Monocacy Elementary | P.A. System Replacement | Due to repeated failure, and inability to secure repair parts. | $ 19,025 | $ 19,025 | $ 19,025 | 100 |
2009 | Montgomery | 15.148.09 | Clopper Mill Elementary | P.A. System Replacement | Due to repeated failure, and inability to secure repair parts. | $ 23,829 | $ 23,829 | $ 23,829 | 100 |
2009 | Montgomery | 15.155.09 | Greencastle Elementary | P.A. System Replacement | Due to repeated failure, and inability to secure repair parts. | $ 23,342 | $ 23,342 | $ 23,342 | 100 |
2009 | Montgomery | 15.150.09 | Jones Lane Elementary | P.A. System Replacement | Due to repeated failure, and inability to secure repair parts. | $ 21,184 | $ 21,184 | $ 21,184 | 1 |
2009 | Montgomery | 15.219.09 | Rolling Terrace Elementary | P.A. System Replacement | Due to repeated failure, and inability to secure repair parts. | $ 23,342 | $ 23,342 | $ 23,342 | 100 |
2009 | Montgomery | 15.062.09 | Rosemary Hills Elementary | P.A. System Replacement | Due to repeated failure, and inability to secure repair parts. | $ 21,089 | $ 21,089 | $ 21,089 | 100 |
2009 | Montgomery | 15.234.09 | Cloverly Elementary | Exterior and Interior Painting | Paint in poor condition, original paint. | $ 24,992 | $ 24,992 | $ 24,992 | 100 |
2009 | Montgomery | 15.155.09 | Greencastle Elementary | Exterior and Interior Painting | Paint in poor condition, original paint. | $ 39,800 | $ 39,800 | $ 39,800 | 100 |
2009 | Dorchester | 09.009.09 | Cambridge-South Dorchester High | Carpet and Flooring | Replace carpet in 15 classrooms and office areas with VCT, and carpet the guidance office area. | $ 31,200 | $ 31,200 | $ 31,200 | 100 |
2009 | Dorchester | 09.010.09 | Maple Elementary | Carpet and Flooring | Replace carpet in Pods 5 and 6. | $ 13,000 | $ 13,000 | $ 13,000 | 100 |
2009 | Dorchester | 09.011.09 | Warwick Elementary | Carpet and Flooring | Replace flooring in Pods 1, 2, and 3 in the Assistant Principal and Guidance offices. | $ 24,300 | $ 24,300 | $ 24,300 | 100 |
2009 | Montgomery | 15.095.09 | Smith (Lathrop) Environmental Center | Interior and Exterior Painting | Paint peeling and in poor condition. | $ 14,350 | $ 14,350 | $ 14,350 | 1 |
2009 | Washington | 21.038.09 | E. Russell Hicks Middle | Window, and Door Replacement | Cross Corridor Frame, Window, and Door Replacement; replace windows and frames and doors and frames of the two connecting cross corridors. | $ 230,000 | $ 170,319 | $ 170,319 | 1 |
2009 | Washington | 21.001.09 | Boonsboro High | Locker Replacement | Replace lockers in the classroom corridor and gym areas. | $ 100,000 | $ 75,000 | $ 75,000 | 1 |
2009 | Wicomico | 22.003.09 | East Salisbury Elementary | Gym Roof and Gutter Repairs | Remove and replace approx. 180' of existing flashing and counter flashing that is allowing water intrusion. Replace missing step flashing. Install new aluminum copings and repair scuppers. | $ 45,000 | $ 45,000 | $ 13,191 | |
2009 | Wicomico | 22.017.09 | Fruitland Intermediate | HVAC | Replace 2 Make up air roof top units. | $ 84,750 | $ 42,000 | $ 50,221 | |
2009 | Wicomico | 22.015.09 | Wicomico Middle | Fire Alarm Replacement | Replace and upgrade the existing fire alarm panel and devices. | $ 23,500 | $ 23,500 | $ 32,408 | |
2009 | Wicomico | 22.009.09 | Wicomico High | Tennis Court Resurface | Patch, repair and resurface 4 existing tennis courts, restripe and renet. | $ 45,000 | $ 45,000 | $ 78,208 | |
2009 | Wicomico | 22.001.09 | Parkside High | Masonry Restoration of Rear Gym | Grout is falling out and bricks are beginning to loosen in spots. Tuck point, regrout, and seal masonry. | $ 45,000 | $ 38,398 | $ 19,870 | |
2009 | Calvert | 04.004.09 | Calvert Elementary | Chiller | Replace existing chiller. | $ 530,000 | $ 69,632 | $ 69,632 | |
2009 | Carroll | 06.042.09 | Westminster High | Asbestos, Doors and Windows | 67 Fire Rated doors need to be replaced due to failure. | $ 209,197 | $ 209,197 | $ 212,675 | 1 |
2009 | Carroll | 06.001.09 | North Carroll High | Doors and Windows | 2 sets of stairwell doors and 1 set of entrance doors are to be replaced to comply with Fire Marshall's inspection. | $ 30,000 | $ 30,000 | $ 23,241 | 1 |
2009 | Queen Anne's | 17.021.09 | Bayside Elementary | Carpet Replacement | Due to IAQ issues replace carpet with VCT in C-2, C-3, C-4, C-5, C-6, Faculty Lounge, B-1, B-12, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-11 and recarpet Media Center. | $ 65,000 | $ 65,000 | $ 54,327 | 1 |
2009 | Talbot | 20.010.09 | Easton Elementary - Moton Building | Playground Installation | Install playground for children 8 to 12 years old (grades 2 to 5). | $ 109,153 | $ 69,632 | $ 69,632 | 1 |
2009 | Cecil | 07.013.09 | Perryville High | Theatre Replacement | Replace original (1978) theatre lighting system. Provide upgrades to house dimming system in auditorium and upgrade portions of the sound system. | $ 112,000 | $ 103,521 | $ 103,521 | 1 |
2009 | St. Mary's | 18.017.09 | Lettie Marshall Dent Elementary | Health Area Upgrade | This project includes the renovation of the existing main office space to function as the expanded health suite and administrative workroom area for the school. The main office is being relocated under a separate project as part of a safety and security vestibule project. The existing health suite does not meet the needs of the students and will be expanded and reconfigured to better meet the MADE guidelines for the assigned spaces (see cover letter for additional details). | $ 96,000 | $ 91,057 | $ 91,057 | 1 |
2009 | Frederick | 10.075.09 | Walkersville "B" Adult Education/Evening High | Window Replacement | Window Replacement Phase IV (29 windows) | $ 64,000 | $ 59,000 | $ 59,000 | 1 |
2009 | Frederick | 10.010.09 | Middletown Middle | Window Replacement | Window Replacement Phase II (12 windows) | $ 70,378 | $ 65,378 | $ 65,378 | 1 |
2009 | Frederick | 10.060.09 | Lewistown Elementary | Roof Replacement | Replacement roof "A" Section - 7,394 sq ft. | $ 162,705 | $ 180,073 | $ 180,073 | 1 |
2009 | Frederick | 10.009.09 | Frederick High | Masonry repairs | Masonry repairs (phase I) | $ 67,456 | $ 27,640 | $ 27,640 | 1 |
2009 | Montgomery | 15.205.09 | Beall Elementary | Interior and Exterior Painting | Last painted 1991, paint peeling and in poor condition. | $ 49,800 | $ 49,800 | $ 50,233 | 1 |
2009 | Kent | 14.008.09 | Worton Elementary | Playground equipment | Playground equipment ages 2-5, 5-12 area - take down existing non-compliance playground. Install Geo textile, wear mats, engineered wood fiber safety surfacing and Gametime play structures. | $ 75,086 | $ 69,632 | $ 69,632 | 1 |
2009 | Baltimore County | 03.009.09 | Pine Grove Elementary | Cooling Tower Replacement | The original cooling tower, which is still in place requires replacement. | $ 100,000 | $ 86,962 | $ 84,962 | 1 |
2009 | Baltimore County | 03.007.09 | Perry Hall Middle | Gym Upgrades | Replace original gym bleachers; refurbish floor. | $ 175,000 | $ 137,088 | $ 127,088 | 1 |
2009 | Baltimore County | 03.007.09 | Perry Hall Middle | Exterior Door Replacement | Replace exterior doors, frames and hardware on original 1963 and the 1975 addition. | $ 300,000 | $ 300,000 | $ 228,396 | 1 |
2009 | Baltimore County | 03.006.09 | Cockeysville Middle | Exterior Doors | Replace exterior doors, frames and hardware on building. | $ 130,000 | $ 130,000 | $ 271,226 | 1 |
2009 | Baltimore County | 03.085.09 | Pikesville Middle | Locker Replacement | Replace original hall lockers. | $ 170,000 | $ 113,577 | $ 113,577 | 1 |
2009 | Baltimore County | 03.078.09 | Hernwood Elementary | Exterior Lighting | Replace and add exterior lighting around bus loop and parking lot. | $ 60,000 | $ 28,900 | $ 26,900 | 1 |
2009 | Baltimore County | 03.104.09 | Hebbville Elementary | Intercom | Replace existing intercom system. | $ 40,000 | $ 40,000 | $ 29,970 | 1 |
2009 | Harford | 12.020.09 | C. Milton Wright High | Flooring | Carpet Replacement. | $ 60,000 | $ 60,000 | $ 47,287 | 1 |
2009 | Harford | 12.029.09 | Ring Factory Elementary | Flooring | Carpet Replacement. | $ 80,000 | $ 80,000 | $ 79,042 | 1 |
2009 | Harford | 12.005.09 | Havre de Grace High | Concrete Replacement | Replacement of concrete sidewalk and auditorium. | $ 45,000 | $ 45,000 | $ 38,509 | 1 |
2009 | Harford | 12.050.09 | Southampton Middle | Sprinkler Head Replacement | $ 30,000 | $ 30,000 | $ 44,800 | 1 | |
2009 | Harford | 12.050.09 | Southampton Middle | Ceiling Tile Replacement | $ 70,000 | $ 70,000 | $ 25,082 | 1 | |
2009 | Harford | 12.035.09 | Bel Air Middle | Storm water Piping Replacement | $ 50,000 | $ 50,000 | $ 49,275 | 100 | |
2009 | Allegany | 01.027.09 | Center for Career and Technical Education | Culinary Arts Lab Renovation | MSDE, Career Technology and Adult Learning has approved the addition of a Culinary Arts Program at the Center for Career and Technical Education. This project will construct a fully equipped instructional lab, classroom and dining area within the existing facility. | $ 764,000 | $ 177,829 | $ 177,829 | 1 |
2009 | Prince George's | 16.194.09 | Duval High | Repair interior plaster on tech-fab panels; re-hang heaters. | $ 99,960 | $ 99,960 | $ 99,960 | 1 | |
2009 | Prince George's | 16.183.09 | William Wirt Middle | Repair interior plaster on tech-fab panels; re-hang heater cabinets. | $ 30,000 | $ 30,000 | $ 29,183 | 1 | |
2009 | Prince George's | 16.162.09 | Oxon Hill Middle | Rebuild chimney (masonry). | $ 21,000 | $ 21,000 | $ 20,615 | 1 | |
2009 | Prince George's | 16.149.09 | Morningside Elementary | Painting | Repaint interior | $ 49,500 | $ 49,500 | $ 47,500 | 1 |
2009 | Prince George's | 16.149.09 | Morningside Elementary | Flooring | Replace vinyl asbestos tile with vinyl composition tile and replace carpet. | $ 65,000 | $ 65,000 | $ 45,249 | 1 |
2009 | Prince George's | 16.145.09 | North Forestville Elementary | Repaint exterior, re-caulk, and replace glass. | $ 26,200 | $ 26,200 | $ 26,200 | 1 | |
2009 | Prince George's | 16.145.09 | North Forestville Elementary | Painting | Repaint interior | $ 50,000 | $ 50,000 | $ 49,700 | 1 |
2009 | Prince George's | 16.142.09 | Carrollton Elementary | Repaint exterior, caulk and replace glass | $ 12,400 | $ 12,400 | $ 12,400 | 1 | |
2009 | Prince George's | 16.139.09 | Middleton Valley Elementary | Flooring | Replace carpet and vinyl asbestos tile with vinyl composition tile in office. | $ 50,000 | $ 50,000 | $ 46,050 | 1 |
2009 | Prince George's | 16.139.09 | Middleton Valley Elementary | Replace bathroom partitions | $ 10,000 | $ 10,000 | $ 10,031 | 1 | |
2009 | Prince George's | 16.121.09 | Isaac J. Gordine Middle | Asbestos Removal | Remove and replace asbestos fireproofing in boys/girls locker room. | $ 87,000 | $ 87,000 | $ 86,000 | 1 |
2009 | Prince George's | 16.119.09 | Pointer Ridge Elementary | Repair, re-plaster and paint front canopy. | $ 19,400 | $ 19,400 | $ 19,312 | 1 | |
2009 | Prince George's | 16.116.09 | Glenridge Elementary | Repaint exterior, re-caulk, and replace glass. | $ 42,500 | $ 42,500 | $ 55,000 | 1 | |
2009 | Prince George's | 16.116.09 | Glenridge Elementary | Painting | Repaint interior | $ 98,900 | $ 98,900 | $ 69,700 | 1 |
2009 | Prince George's | 16.114.09 | James Madison Middle | Repaint exterior, caulk, and replace glass. | $ 22,000 | $ 22,000 | $ 22,000 | 1 | |
2009 | Prince George's | 16.110.09 | Charles Carroll Middle | Rebuild chimney (masonry) | $ 15,000 | $ 15,000 | $ 14,851 | 1 | |
2009 | Prince George's | 16.258.09 | Suitland High Annex | Repaint exterior, caulk and replace lexan with glass as needed. | $ 65,000 | $ 65,000 | $ 65,000 | 1 | |
2009 | Prince George's | 16.258.09 | Suitland High Annex | Replace bathroom partitions. | $ 41,000 | $ 41,000 | $ 40,730 | 1 | |
2009 | Prince George's | 16.086.09 | Potomac Landing Elementary | Painting | Repaint interior | $ 50,000 | $ 50,000 | $ 49,975 | 1 |
2009 | Prince George's | 16.086.09 | Potomac Landing Elementary | Painting | Repaint exterior | $ 25,000 | $ 25,000 | $ 25,000 | 1 |
2009 | Prince George's | 16.084.09 | James Ryder Randall Elementary | Flooring | Replace gym floor. | $ 75,000 | $ 75,000 | $ 71,279 | 1 |
2009 | Prince George's | 16.074.09 | Arrowhead Elementary | Repaint exterior; caulk and replace glass. | $ 35,000 | $ 35,000 | $ 35,300 | 1 | |
2009 | Prince George's | 16.056.09 | Capitol Heights Elementary | Replace metal pan ceiling with 2 x 4 acoustic lay-in and replace lights in the lobby, main office and hallways. | $ 80,000 | $ 80,000 | $ 79,700 | 1 | |
2009 | Prince George's | 16.043.09 | Kettering Middle | Repaint exterior, caulk and replace glass. | $ 16,300 | $ 16,300 | $ 16,300 | 1 | |
2009 | Prince George's | 16.033.09 | Crossland High | Replace urinals, hand sinks and fixtures in gang lavatories. | $ 49,900 | $ 49,900 | $ 49,900 | 1 | |
2009 | Prince George's | 16.011.09 | Largo High | Asbestos Removal | Remove asbestos textured ceiling in foyer and media center. | $ 75,000 | $ 75,000 | $ 74,780 | 1 |
2009 | Prince George's | 16.005.09 | Eugene Burroughs Middle | Partitions Replacement | Replace all bathroom partitions. | $ 38,100 | $ 38,100 | $ 38,096 | 1 |
2009 | Prince George's | 16.197.09 | Andrew Jackson Middle | Painting | Repaint interior | $ 86,000 | $ 86,000 | $ 86,000 | 1 |
2009 | Prince George's | 16.115.09 | Beltsville Elementary | Painting | Repaint exterior, recaulk windows and replace glass as needed. | $ 44,800 | $ 44,800 | $ 44,800 | 1 |
2009 | Prince George's | 16.115.09 | Beltsville Elementary | Painting | Repaint interior | $ 89,300 | $ 89,300 | $ 89,300 | 1 |
2009 | Prince George's | 16.110.09 | Charles Carroll Middle | Bleacher Replacement | Replace bleachers | $ 20,000 | $ 20,000 | $ 20,250 | 1 |
2009 | Prince George's | 16.005.09 | Eugene Burroughs Middle | Painting | Repaint interior, scrape and repaint ceiling beams. | $ 65,000 | $ 65,000 | $ 74,000 | 1 |
2009 | Prince George's | 16.005.09 | Eugene Burroughs Middle | Window Replacement | Repaint exterior, recaulk windows and replace glass as needed. | $ 26,000 | $ 26,000 | $ 26,000 | 1 |
2009 | Prince George's | 16.120.09 | Forest Heights Elementary | Painting | Repaint exterior and recaulk windows and replace glass as needed. | $ 22,100 | $ 22,100 | $ 22,100 | 1 |
2009 | Prince George's | 16.202.09 | Glenn Dale Elementary | Painting | Repaint exterior, and recaulk windows and replace glass as needed. | $ 16,200 | $ 16,200 | $ 16,200 | 1 |
2009 | Prince George's | 16.001.09 | Gwynn Park High | Replace ceiling grids, lights and acoustical ceiling tiles in cafeteria. | $ 99,900 | $ 99,900 | $ 99,999 | 1 | |
2009 | Prince George's | 16.001.09 | Gwynn Park High | Remove 4" block bathroom partitions, install new plastic partitions and repaint. | $ 49,950 | $ 49,950 | $ 49,929 | 1 | |
2009 | Prince George's | 16.071.09 | Langley Park/McCormick Elementary | Painting | Repaint interior hallways, multi- purpose room, office and bathrooms. | $ 51,000 | $ 51,000 | $ 51,000 | 1 |
2009 | Prince George's | 16.216.09 | Potomac High | Locker Replacement | Replace lockers in boys locker room. | $ 48,000 | $ 48,000 | $ 47,900 | 1 |
2009 | Prince George's | 16.122.09 | Thomas Pullen Middle | Repaint interior, repair aluminum window frames, repair interior plaster walls, repaint interior doors. | $ 90,000 | $ 90,000 | $ 89,900 | 1 | |
2009 | Prince George's | 16.122.09 | Thomas Pullen Middle | Flooring | Replace wood stage floor. | $ 15,000 | $ 15,000 | $ 13,402 | 1 |
2009 | Howard | 13.013.09 | Atholton High | Auditorium | Replacement of the auditorium stage rigging and divider wall. | $ 188,250 | $ 159,618 | $ 159,618 | 1 |
2009 | Prince George's | 16.114.09 | James Madison Middle | Painting | Repaint interior | $ 67,000 | $ 67,000 | $ 65,500 | 1 |
2009 | Prince George's | 16.071.09 | Langley Park/McCormick Elementary | Painting | Repaint exterior | $ 25,000 | $ 25,000 | $ 18,760 | 1 |
2009 | Prince George's | 16.197.09 | Andrew Jackson Middle | Painting | Repaint exterior | $ 14,700 | $ 14,700 | $ 14,700 | 1 |
2009 | Prince George's | 16.074.09 | Arrowhead Elementary | Painting | Repaint interior | $ 60,000 | $ 60,000 | $ 60,800 | 1 |
2009 | Prince George's | 16.176.09 | Princeton Elementary | Painting | Repaint exterior | $ 30,000 | $ 30,000 | $ 15,800 | 1 |
2009 | Prince George's | 16.176.09 | Princeton Elementary | Painting | Repaint Interior | $ 40,000 | $ 40,000 | $ 33,900 | 1 |
2009 | Prince George's | 16.001.09 | Gwynn Park High | Flooring | Replace carpet in Media Center. | $ 35,000 | $ 35,000 | $ 24,724 | 1 |
2009 | Prince George's | 16.058.09 | High Bridge Elementary | Painting | Repaint exterior | $ 30,000 | $ 30,000 | $ 16,900 | 1 |
2009 | Prince George's | 16.187.09 | Waldon Woods Elementary | Painting | Repaint exterior | $ 30,000 | $ 30,000 | $ 14,500 | 1 |
2009 | Queen Anne's | 17.006.09 | Stevensville Middle | Public Address System Replacement. | Replace PA System | $ 26,000 | $ 26,000 | $ 26,000 | 1 |
2009 | Anne Arundel | 02.109.09 | Oakwood Elementary | Concrete Replacement | Concrete work at front of building. | $ 45,000 | $ 45,000 | $ 50,000 | 1 |
2009 | Charles | 08.024.09 | Malcolm Elementary | Plumbing Fixture Replacements | Furnish/install 4 Acorn wash ware sinks. | $ 28,971 | $ 28,971 | $ 28,971 | 1 |
2009 | Charles | 08.032.09 | Matula Elementary | Plumbing Fixture Replacements | Furnish/install 4 Acorn wash ware sinks. | $ 28,034 | $ 28,034 | $ 28,034 | 1 |
2009 | Charles | 08.028.09 | William B. Wade Elementary | Plumbing Fixture Replacements | Furnish/install 4 Acorn wash ware sinks. | $ 28,034 | $ 28,034 | $ 28,034 | 1 |
2009 | Garrett | 11.013.09 | Accident Elementary | Parking Lot Repairs | Resurface Parking lot | $ 20,530 | $ 20,530 | $ 20,530 | 1 |
2009 | Garrett | 11.012.09 | Crellin Elementary | Loop Repairs | Extend bus loop and parking lot. | $ 24,750 | $ 24,750 | $ 24,750 | 1 |
2009 | Baltimore City | 30.130.09 | #005 Langston Hughes Elementary | HVAC Replacement | Design and replace HVAC units; 6 original 1976 split systems including indoor and outdoor units, reheat coils, and associated equipment and accessories. Include new digital controls and mechanical room lighting and ventilation upgrades. | $ 275,000 | $ 185,312 | $ 185,312 | 1 |
2009 | Baltimore City | 30.267.09 | #011 Eutaw Marshburn Elementary | Windows Replacement | Caulk and reseal exterior panels and windows. | $ 38,000 | $ 29,000 | $ 29,000 | 1 |
2009 | Baltimore City | 30.254.09 | #021 Hilton Elementary | Asphalt | Concrete /asphalt front and rear walkway. | $ 78,000 | $ 75,925 | $ 75,925 | 1 |
2009 | Baltimore City | 30.020.09 | #039 Dallas F. Nicholas, Sr. Elementary | PA system | Replace PA system throughout the school. | $ 22,532 | $ 19,904 | $ 19,904 | 1 |
2009 | Baltimore City | 30.241.09 | #040 Lake Clifton Building | Lighting Replacement | Replace exterior parking lights (120 lights) | $ 142,000 | $ 105,771 | $ 105,771 | 1 |
2009 | Baltimore City | 30.029.09 | #053 Margaret Brent Elementary/Middle | Interior painting | Prepare, plaster, full primer, and apply one coat of latex semi gloss paint to walls, ceiling, doors, frames in the following areas: main offices,stairwells,2nd floor offices, 203,204,216,212,213,230, 1st fl offices: 120A,145,146,149, cafeteria and kitchen areas. | $ 15,000 | $ 12,629 | $ 12,629 | 1 |
2009 | Baltimore City | 30.034.09 | #061 John Eager Howard Elementary | Interior painting | Prepare, plaster, full primer and apply one coat of latex semi gloss paint to the walls, ceilings, doors, and frames in the following areas: Main offices (6) stairwells, 1st floor offices: 117,112,113,119, A,B,C, D, Cafeteria, and kitchen areas. | $ 28,000 | $ 17,860 | $ 17,860 | 1 |
2009 | Baltimore City | 30.045.09 | #087 Windsor Hills Elementary/Middle | Asphalt Replacement | Re-asphalt parking lot and curb/sidewalk repair. | $ 86,000 | $ 76,225 | $ 76,225 | 1 |
2009 | Baltimore City | 30.253.09 | #107 Gilmore Elementary | PA System Replacement | Replace PA system throughout the school. | $ 21,023 | $ 20,631 | $ 20,631 | 1 |
2009 | Baltimore City | 30.068.09 | #145 Alexander Hamilton Elementary | Chiller Replacement | Replace the 1981 domestic water heater, chiller, and condenser, cooling tower and associated piping, pumps, equipment and accessories. Also, replace 3 1981 split systems in the admin area, library, and computer room. Include new digital controls and mechanical room lighting, piping, and ventilation upgrades. | $ 371,000 | $ 186,000 | $ 186,000 | 1 |
2009 | Baltimore City | 30.239.09 | #164 Arundel PK-8 | PA System | Replace PA system throughout the school. | $ 18,536 | $ 17,651 | $ 17,651 | 1 |
2009 | Baltimore City | 30.255.09 | #201 Dickey Hill PK-8 | PA System Replacement | Replace PA system throughout the school. | $ 22,865 | $ 20,755 | $ 20,755 | 1 |
2009 | Baltimore City | 30.196.09 | #205 Woodhome PK-8 | Sidewalk Replacement | Asphalt and restripe lot, sidewalk replacement. | $ 133,000 | $ 141,767 | $ 141,767 | 1 |
2009 | Baltimore City | 30.076.09 | #213 Govans Elementary | Oil Tank Replacement | Replace heating oil tank (2,000 gal), remove tank and containment soil and resurface area. | $ 61,000 | $ 70,000 | $ 70,000 | 1 |
2009 | Baltimore City | 30.162.09 | #260 Frederick Elementary | Asphalt | Asphalt parking lot and stripe; sidewalk replacement. | $ 43,000 | $ 15,980 | $ 15,980 | 1 |
2009 | Baltimore City | 30.171.09 | #307 Claremont Special Education High | Asphalt | Asphalt parking lot and playground | $ 142,087 | $ 164,230 | $ 164,230 | 1 |
2009 | Baltimore City | 30.187.09 | #401 Northwestern High | Pool Repairs | Remove wall block, asbestos, replace block material and repair ceiling beams and columns around and over pool. | $ 147,000 | $ 93,944 | $ 93,944 | 1 |
2009 | Worcester | 23.012.09 | Berlin Intermediate | Lighting Systems Replacement | Replace existing T12 fluorescent lighting fixtures with new energy efficient T-8 fixtures in corridors and classrooms throughout the school. | $ 24,700 | $ 24,700 | $ 24,700 | 1 |
2009 | Worcester | 23.007.09 | Buckingham Elementary | Lighting Systems Replacement | Replace existing T12 fluorescent lighting fixtures with new energy efficient T-8 fixtures in corridors and classrooms throughout the school. | $ 24,400 | $ 24,400 | $ 24,400 | 1 |
2009 | Worcester | 23.001.09 | Showell Elementary | Ceiling Tile Replacement | Replace existing ceiling tiles throughout school in corridors and classrooms. Work required per DGS 3/25/09 inspection comments regarding condition of ceiling tiles throughout school. | $ 13,000 | $ 13,000 | $ 20,000 | 1 |
2009 | Garrett | 11.016.09 | Swan Meadow Elementary/Middle | Parking Lot Repairs | Extend bus loop and parking lot. | $ 24,352 | $ 24,352 | $ 24,352 | 1 |
2009 | Cecil | 07.022.09 | Rising Sun High | Countertops Replacement | Replace countertops in four science labs. Current counters have cup sinks every three feet, but no full size sinks for student use. New epoxy resin tops will increase workspace and provide (3) full size sinks per room for student use. | $ 31,000 | $ 31,000 | $ 29,803 | 1 |
2009 | Cecil | 07.015.09 | Chesapeake City Elementary | Add primary grade outdoor playground equipment (school only has 1 piece of code compliant equipment) | $ 31,600 | $ 31,600 | $ 30,446 | 1 | |
2009 | Caroline | 05.006.09 | Ridgely Elementary | Partial Heating/Cooling System Replacement | This will allow for selected areas to be cooled without cooling the entire building during selected times. | $ 27,500 | $ 27,500 | $ 25,900 | 1 |
2009 | Caroline | 05.003.09 | Denton Elementary | Exterior painting | Canopies and other areas are peeling badly, distract from the overall appearance of the building and decrease the useful life of the structure. | $ 15,000 | $ 15,000 | $ 10,668 | 1 |
2009 | Caroline | 05.001.09 | Greensboro Elementary | Exterior Door Systems Replacement | Several exterior door systems are badly rusted and in need of replacement. | $ 18,557 | $ 18,557 | $ 18,500 | 1 |
2009 | Caroline | 05.005.09 | Lockerman Middle | Domestic hot water heater Installation | Install domestic hot water heater to eliminate need to run boilers year round and thus save funds. | $ 30,000 | $ 30,000 | $ 26,200 | 1 |
2009 | Baltimore City | 30.254.09 | #021 Hilton Elementary | Fuel tank | Remove and replace 10,000 gal. fuel tank and any containment soil. | $ 183,000 | $ 207,701 | $ 207,701 | 1 |
2009 | Baltimore City | 30.241.09 | #040 Lake Clifton Building | Asphalt | Repave parking lot, restripe and provide new concrete sidewalks in identified areas. | $ 296,000 | $ 278,163 | $ 278,163 | 1 |
2009 | Baltimore City | 30.206.09 | #046 Chinquapin Middle | Boiler Feed Unit | Demolition and removal of the existing defective boiler feed unit and the installation of a new Mepco quadraplex boiler feed unit. | $ 25,200 | $ 25,200 | $ 25,200 | 1 |
2009 | Baltimore City | 30.045.09 | #087 Windsor Hills Elementary/Middle | CCTV Installation | Install CCTV | $ 26,000 | $ 24,251 | $ 24,251 | 1 |
2009 | Carroll | 06.020.09 | Eldersburg Elementary | Toilet Partitions | 21 toilet partitions and 3 sight screens have deteriorated in the girls' bathrooms and are in need of replacement. | $ 12,550 | $ 12,550 | $ 12,550 | 1 |
2009 | Baltimore County | 03.011.09 | Perry Hall High | AHU Replacement | Replace 4 main AHU's in penthouse along with louvers, controls (for these units), 6 mixing boxes, abatement, and limited ceilings. Add alternates to include upgrade of AHU' s to variable volume, additional mixing boxes, return air fans, ductwork, diffusers and upgrade of air distraction in 3 rooms. Due to the age of the AHU's, they will be an add alternate and funded with the County's budget. | $ 1,393,800 | $ 621,000 | $ 621,000 | 1 |
2009 | Somerset | 19.010.09 | Princess Anne Elementary | Boiler Replacement | Replace existing two boilers (original with two high efficiency boilers. | $ 69,632 | $ 69,632 | $ 69,632 | 1 |
2009 | Anne Arundel | 02.081.09 | Rolling Knolls Elementary | Flooring | Replace floor tile in rooms 114, 115, 116, 117, 118, 119, and 120. | $ 75,000 | $ 75,000 | $ 48,840 | 1 |
2009 | Anne Arundel | 02.053.09 | Millersville Elementary | Flooring | Replace floor tile in Multipurpose room. | $ 50,000 | $ 50,000 | $ 41,138 | 1 |
2009 | Anne Arundel | 02.033.09 | Edgewater Elementary | Flooring | Replace floor tile in Multipurpose room. | $ 50,000 | $ 50,000 | $ 25,781 | 1 |
2009 | Anne Arundel | 02.040.09 | Arundel High | Concrete work | Concrete work at front of building. | $ 85,000 | $ 85,000 | $ 80,875 | 1 |
2009 | Anne Arundel | 02.014.09 | Central Special Education | Fire alarm Replacement | $ 185,000 | $ 185,000 | $ 55,610 | 1 | |
2009 | Anne Arundel | 02.108.09 | Sunset Elementary | Fire alarm Replacement | $ 175,000 | $ 175,000 | $ 91,975 | 1 | |
2009 | Harford | 12.006.09 | Aberdeen Middle | Installation of 100Kva, natural gas powered fixed mounted-not portable-emergency engine generator. | $ 63,000 | $ 63,000 | $ 49,890 | 1 | |
2009 | Baltimore City | 30.199.09 | #062 Edgecombe Circle PK-8 | Asphalt | Asphalt parking lot, restripe and provide new concrete sidewalks and curbs | $ 172,000 | $ 169,860 | $ 169,860 | 1 |
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | State ASP Approved | State/Local Cost Share |
FY 1998-1999
ASP 98-99
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | State ASP Approved |
---|---|---|---|---|---|---|---|---|
1998 | Allegany | 01.011.98 | Fort Hill High | Cafeteria Addition | $ 69,329 | $ 69,329 | $ 69,329 | |
1998 | Allegany | 01.015.98 | Barton Elementary | Fire Alarm System | Replace fire alarm system | $ 15,000 | $ 14,921 | $ 14,921 |
1998 | Allegany | 01.018.98 | Beall High | Replace sidewalks and curbs | $ 15,000 | $ 14,900 | $ 14,900 | |
1998 | Allegany | 01.027.98 | Center for Career and Technical Education | Replace garage door | $ 11,000 | $ 11,000 | $ 11,000 | |
1998 | Allegany | 01.035.98 | Braddock Middle | Install coal stoker | $ 15,000 | $ 14,850 | $ 14,850 | |
1998 | Allegany | 01.036.98 | Westmar Middle | Boiler Replacement | Replace boiler | $ 25,000 | $ 25,000 | $ 25,000 |
1998 | Anne Arundel | 02.080.98 | Freetown Elementary | Roof replacement | Removal of existing roof membrane, inspection of deck and replacement as needed, installation of augmenting roof drains, insulation and 4-ply built-up roofing. | $ 214,900 | $ 214,900 | $ 214,900 |
1998 | Anne Arundel | 02.101.98 | Tracey Elementary | Carpet Replacement | $ 25,000 | $ 22,709 | $ 22,709 | |
1998 | Baltimore County | 03.011.98 | Perry Hall High | Lighting | Replace auditorium lighting | $ 182,150 | $ 182,150 | $ 182,150 |
1998 | Baltimore County | 03.022.98 | Stoneleigh Elementary | Unit Ventilator Replacement | Replace five classroom unit ventilators | $ 15,000 | $ 56,000 | $ 56,000 |
1998 | Baltimore County | 03.054.98 | Randallstown Elementary | Renovation | Renovate existing restrooms. | $ 35,000 | $ 69,700 | $ 69,700 |
1998 | Baltimore County | 03.034.99 | Sandalwood Elementary | Door and frame Replacement | Replace interior and exterior doors and frames | $ 20,000 | $ 24,486 | $ 24,486 |
1998 | Baltimore County | 03.042.98 | Rodgers Forge Elementary | Replace hot water storage tank | $ 20,000 | $ 16,687 | $ 16,687 | |
1998 | Baltimore County | 03.050.98 | Woodlawn High | Locker Replacement | Replace boys locker room/gymnasium lockers | $ 60,000 | $ 66,551 | $ 66,551 |
1998 | Baltimore County | 03.057.98 | Victory Villa Elementary | Boiler Replacement | Replace boiler | $ 80,000 | $ 39,523 | $ 39,523 |
1998 | Baltimore County | 03.072.98 | Elmwood Elementary | Door and Frame Replacement | Replace interior and exterior doors and frames | $ 20,000 | $ 27,045 | $ 27,045 |
1998 | Baltimore County | 03.078.98 | Hernwood Elementary | Intercom System Replacement | Replace intercom system | $ 10,000 | $ 19,900 | $ 19,900 |
1998 | Baltimore County | 03.092.98 | Powhatan Elementary | Door and frame Replacement | Replace interior and exterior doors and frames | $ 20,000 | $ 25,518 | $ 25,518 |
1998 | Baltimore County | 03.102.98 | Featherbed Lane Elementary | Door and frame Replacement | Replace interior and exterior doors and frames | $ 30,000 | $ 30,001 | $ 30,001 |
1998 | Baltimore County | 03.103.98 | Johnnycake Elementary | Door and frame Replacement | Replace interior and exterior doors and frames | $ 15,000 | $ 26,712 | $ 26,712 |
1998 | Baltimore County | 03.106.98 | Reisterstown Elementary | $ 30,000 | $ 44,210 | $ 44,210 | ||
1998 | Baltimore County | 03.120.98 | Franklin High | Lighting | Replace auditorium lighting | $ 120,780 | $ 120,780 | $ 120,780 |
1998 | Baltimore County | 03.121.98 | Parkville High | Renovate existing restrooms | $ 62,294 | $ 62,294 | $ 62,294 | |
1998 | Baltimore County | 03.124.98 | Owings Mill Elementary | Replace existing malfunctioning and rusted-out heat | $ 79,500 | $ 79,500 | $ 79,500 | |
1998 | Baltimore County | 03.132.98 | Relay Elementary | Replace heating and air conditioning classroom unit | $ 188,500 | $ 188,500 | $ 188,500 | |
1998 | Baltimore County | 03.134.98 | Loch Raven High | Lighting | Replace auditorium lighting | $ 119,500 | $ 119,500 | $ 119,500 |
1998 | Baltimore County | 03.140.98 | Dundalk High | Bleacher Replacement | Replace gym bleachers | $ 60,000 | $ 71,500 | $ 71,500 |
1998 | Baltimore County | 03.148.98 | Kenwood High | Flooring | Refinish gym floor | $ 15,000 | $ 18,157 | $ 18,157 |
1998 | Baltimore County | 03.152.98 | Hawthorne Elementary | Electrical | Replace electrical panel box | $ 10,000 | $ 10,000 | $ 10,000 |
1998 | Baltimore County | 03.152.98 | Hawthorne Elementary | RTU Replacement | Replace 13 air-cooled condensing units on the roof. | $ 40,000 | $ 31,650 | $ 31,650 |
1998 | Baltimore County | 03.153.98 | Bear Creek Elementary | Door and Frame Replacement | Replace exterior doors and frames | $ 30,000 | $ 49,976 | $ 49,976 |
1998 | Baltimore County | 03.154.98 | Loch Raven Technical Academy | Door and frame Replacement | Replace interior and exterior doors and frames | $ 35,000 | $ 45,591 | $ 45,591 |
1998 | Baltimore County | 03.155.98 | Norwood Elementary | Ceiling and Lighting | Replace ceiling and lighting. | $ 55,000 | $ 53,150 | $ 53,150 |
1998 | Baltimore County | 03.136.98 | Campfield Early Childhood Center | Door and frame Replacement | Replace exterior doors and frames | $ 30,000 | $ 30,312 | $ 30,312 |
1998 | Baltimore County | 03.159.98 | Westowne Elementary | Intercom System Replacement | Replace intercom system | $ 10,000 | $ 18,820 | $ 18,820 |
1998 | Baltimore County | 03.160.98 | Arbutus Elementary | RTU Replacement | Replace heating and air conditioning units in 2 classrooms | $ 20,000 | $ 22,500 | $ 22,500 |
1998 | Baltimore County | 03.161.98 | Carroll Manor Elementary | Unit Ventilator Replacement | Installation of six unit ventilators. | $ 98,100 | $ 98,100 | $ 98,100 |
1998 | Baltimore County | 03.161.98 | Carroll Manor Elementary | Renovation | Renovate existing restrooms. | $ 55,000 | $ 44,000 | $ 44,000 |
1998 | Baltimore County | 03.162.98 | Oakleigh Elementary | Electrical | Remove existing electrical distribution and replace | $ 60,000 | $ 53,873 | $ 53,873 |
1998 | Calvert | 04.001.98 | Calvert Middle | Vestibule | Replace metal frames and glazing in vestibule. | $ 10,500 | $ 9,205 | $ 9,205 |
1998 | Calvert | 04.006.98 | Northern Middle | Piping | Replace insulation on the chilled water pipes. | $ 14,000 | $ 13,000 | $ 13,000 |
1998 | Caroline | 05.002.98 | North Caroline High | Locker Replacement | $ 7,600 | $ 7,562 | $ 7,562 | |
1998 | Caroline | 05.002.98 | North Caroline High | Fencing | $ 7,700 | $ 8,023 | $ 8,023 | |
1998 | Caroline | 05.004.98 | Colonel Richardson High | Carpet Replacement | $ 11,000 | $ 11,000 | $ 11,000 | |
1998 | Caroline | 05.010.98 | Colonel Richardson Middle | ADA restroom compliance | $ 8,600 | $ 8,078 | $ 8,078 | |
1998 | Carroll | 06.003.98 | Westminster Elementary | Boiler conversion | $ 16,500 | $ 11,660 | $ 11,660 | |
1998 | Carroll | 06.006.98 | Charles Carroll Elementary | METASYS - Energy Management System Installation | $ 21,500 | $ 31,856 | $ 31,856 | |
1998 | Carroll | 06.014.98 | Carrolltowne Elementary | Movable wall replacement | $ 33,000 | $ 30,445 | $ 30,445 | |
1998 | Carroll | 06.015.98 | Freedom Elementary | METASYS - Energy Management System Installation | $ 26,000 | $ 27,960 | $ 27,960 | |
1998 | Carroll | 06.019.98 | Liberty High | Masonry waterproofing | $ 22,000 | $ 17,333 | $ 17,333 | |
1998 | Carroll | 06.026.98 | Mt. Airy Middle | HVAC Replacement | $ 38,500 | $ 6,403 | $ 6,403 | |
1998 | Carroll | 06.042.98 | Westminster High | Elevators | Renovation of elevators | $ 88,000 | $ 54,343 | $ 54,343 |
1998 | Cecil | 07.011.98 | Thomson Estates Elementary | Underground storage tank replacement | $ 29,330 | $ 27,560 | $ 27,560 | |
1998 | Cecil | 07.012.98 | North East Middle | Flooring | Carpet replacement; asbestos tile removal | $ 9,819 | $ 9,819 | $ 9,819 |
1998 | Cecil | 07.012.98 | North East Middle | Painting | Exterior painting | $ 13,726 | $ 13,895 | $ 13,895 |
1998 | Cecil | 07.016.98 | Gilpin Manor Elementary | Flooring | Carpet replacement; asbestos tile removal | $ 11,937 | $ 11,937 | $ 11,937 |
1998 | Cecil | 07.033.98 | Providence Special Education | Painting | Exterior painting | $ 10,953 | $ 10,785 | $ 10,785 |
1998 | Cecil | 07.039.98 | Cherry Hill Middle | Underground storage tank replacement | Replace underground storage tank | $ 33,380 | $ 34,415 | $ 34,415 |
1998 | Cecil | 07.040.98 | North East High | Flooring | Carpet replacement; asbestos tile removal | $ 7,474 | $ 7,474 | $ 7,474 |
1998 | Cecil | 07.041.98 | Leeds Elementary | Underground storage tank replacement | Replace underground storage tank | $ 33,380 | $ 34,115 | $ 34,115 |
1998 | Charles | 08.003.98 | John Hanson Middle | P.A. modifications | $ 10,135 | $ 10,135 | $ 10,135 | |
1998 | Charles | 08.008.98 | Indian Head Elementary | P.A. Systems Replacement | $ 14,865 | $ 14,865 | $ 14,865 | |
1998 | Dorchester | 09.009.98 | Cambridge-South Dorchester High | Flooring | Gym floor refinishing/replace gym gate | $ 25,000 | $ 25,000 | $ 25,000 |
1998 | Frederick | 10.004.98 | Lincoln "B" Elementary | Painting | Paint interior | $ 21,042 | $ 14,836 | $ 14,836 |
1998 | Frederick | 10.008.98 | Thurmont Middle | Painting | Paint interior | $ 13,958 | $ 20,164 | $ 20,164 |
1998 | Garrett | 11.004.98 | Grantsville Elementary | P.A. Systems Replacement | Replace P.A. system | $ 6,650 | $ 6,650 | $ 6,650 |
1998 | Garrett | 11.009.98 | Northern Middle | Recondition water storage tank | $ 19,550 | $ 19,550 | $ 19,550 | |
1998 | Garrett | 11.013.98 | Accident Elementary | Ventilation Upgrade | $ 8,800 | $ 8,800 | $ 8,800 | |
1998 | Harford | 12.001.98 | Fallston High | Chiller Replacement | Replace chiller | $ 110,000 | $ 110,000 | $ 110,000 |
1998 | Harford | 12.002.98 | Magnolia Elementary | Flooring | Replace ceramic tile | $ 34,000 | $ 34,000 | $ 34,000 |
1998 | Harford | 12.014.98 | Edgewood Middle | Lighting | Replace ceiling and light fixtures | $ 35,000 | $ 35,000 | $ 35,000 |
1998 | Howard | 13.065.98 | Laurel Woods Elementary | Doors and Window Replacement | Replace doors and windows | $ 25,000 | $ 25,000 | $ 25,000 |
1998 | Montgomery | 15.039.98 | Stedwick Elementary | Painting | Interior painting | $ 30,000 | $ 30,000 | $ 31,268 |
1998 | Montgomery | 15.042.98 | Ridgeview Middle | Painting | Exterior painting | $ 6,000 | $ 6,000 | $ 5,105 |
1998 | Montgomery | 15.047.98 | Rock Terrace Special Education | Door and frame Replacement | Replacement of exterior doors and frames | $ 38,000 | $ 38,000 | $ 33,480 |
1998 | Montgomery | 15.061.98 | Weller Road Elementary | Painting | Exterior painting | $ 7,000 | $ 7,000 | $ 6,669 |
1998 | Montgomery | 15.067.98 | Walter Johnson High | Painting | Interior and exterior painting | $ 111,974 | $ 111,974 | $ 111,974 |
1998 | Montgomery | 15.086.98 | Southlake Elementary | P.A. Systems Replacement | Replace P.A. system and speakers | $ 28,000 | $ 28,000 | $ 22,509 |
1998 | Montgomery | 15.130.98 | Gaithersburg High | Folding Partition Replacements | Replacement of gym folding partitions | $ 50,000 | $ 50,000 | $ 55,000 |
1998 | Montgomery | 15.137.98 | Poolesville Elementary | Door and frame Replacement | Replacement of exterior doors and frames | $ 30,000 | $ 30,000 | $ 32,040 |
1998 | Montgomery | 15.144.98 | Gaithersburg Elementary | Painting | Interior and exterior painting | $ 34,000 | $ 34,000 | $ 35,148 |
1998 | Montgomery | 15.179.98 | Cannon Road Elementary | Painting | Interior painting | $ 21,000 | $ 21,000 | $ 19,691 |
1998 | Montgomery | 15.182.98 | John T. Baker Middle | Painting | Exterior painting | $ 5,000 | $ 5,000 | $ 5,296 |
1998 | Montgomery | 15.208.98 | Burnt Mills Elementary | Carpet Replacement | $ 20,000 | $ 20,000 | $ 22,701 | |
1998 | Montgomery | 15.125.98 | Tilden Middle | Doors and Window Replacement | Replace exterior doors and windows | $ 34,000 | $ 34,000 | $ 52,835 |
1998 | Montgomery | 15.218.98 | Strathmore Elementary | Painting | Exterior painting | $ 5,000 | $ 5,000 | $ 5,729 |
1998 | Montgomery | 15.222.98 | Carl Sandburg Learning Center | Painting | Interior painting | $ 18,000 | $ 18,000 | $ 16,525 |
1998 | Montgomery | 15.224.98 | Mark Twain Spec. Ed. (Blair G. Ewing Center ) | P.A. Systems Replacement | Replace P.A. system and speakers | $ 45,000 | $ 45,000 | $ 24,106 |
1998 | Montgomery | 15.238.98 | Redland Middle | Painting | Exterior painting | $ 5,000 | $ 5,000 | $ 5,118 |
1998 | Montgomery | 15.240.98 | College Gardens Elementary | Painting | Interior and exterior painting | $ 26,000 | $ 26,000 | $ 24,807 |
1998 | Prince George's | 16.002.98 | Eleanor Roosevelt High | Cooling Tower Replacement | Cooling tower | $ 149,300 | $ 149,300 | $ 149,300 |
1998 | Prince George's | 16.052.98 | Woodridge Elementary | Install boiler/burner units and sprinkler system | $ 117,000 | $ 117,000 | $ 117,000 | |
1998 | Prince George's | 16.121.98 | Lord Baltimore Middle | A/C unit and chiller | $ 153,459 | $ 153,459 | $ 153,459 | |
1998 | Queen Anne's | 17.012.98 | Kennard Elementary | Fire Alarm System Installation | New fire alarm system | $ 35,000 | $ 29,939 | $ 29,939 |
1998 | St. Mary's | 18.003.98 | Green Holly School | Pre-K classroom renovations | $ 6,155 | $ 6,155 | $ 6,155 | |
1998 | St. Mary's | 18.007.98 | George Washington Carver Elementary | Fire Alarm System Upgrade | Upgrade fire alarm system | $ 20,000 | $ 20,000 | $ 20,000 |
1998 | St. Mary's | 18.014.98 | Mechanicsville Elementary | Carpet Replacement | $ 8,845 | $ 8,845 | $ 8,845 | |
1998 | Somerset | 19.002.98 | Washington High | Underground tank removal and new above-ground tank r | $ 25,000 | $ 25,000 | $ 25,000 | |
1998 | Talbot | 20.002.98 | Easton High | Lighting Replacement | Exterior light replacement | $ 60,000 | $ 60,000 | $ 60,000 |
1998 | Washington | 21.014.98 | Greenbrier Elementary | Window Replacement | $ 30,000 | $ 26,121 | $ 26,121 | |
1998 | Washington | 21.039.98 | Winter Street Elementary | Fire Alarm System Upgrade | Fire alarm upgrade | $ 35,000 | $ 34,750 | $ 34,750 |
1998 | Washington | 21.041.98 | Pangborn Elementary | Replace grease trap | $ 30,000 | $ 29,129 | $ 29,129 | |
1998 | Wicomico | 22.002.98 | Pinehurst Elementary | Flooring | Gym floor replacement | $ 20,000 | $ 18,581 | $ 18,581 |
1998 | Wicomico | 22.008.98 | James. M. Bennett High | Door Replacements | $ 15,000 | $ 14,974 | $ 14,974 | |
1998 | Wicomico | 22.008.98 | James. M. Bennett High | Telecommunications upgrade | $ 10,000 | $ 11,000 | $ 11,000 | |
1998 | Wicomico | 22.010.98 | Glen Avenue Elementary | Door and Window Replacements | $ 28,000 | $ 24,850 | $ 24,850 | |
1998 | Wicomico | 22.016.98 | Fruitland Primary | Door Replacement | Interior door replacements | $ 20,000 | $ 20,306 | $ 20,306 |
1998 | Wicomico | 22.019.98 | Pittsville Elementary/Middle | Site work | $ 8,000 | $ 7,418 | $ 7,418 | |
1998 | Wicomico | 22.021.98 | Bennett Middle | Bus loading area expansion | $ 17,000 | $ 16,774 | $ 16,774 | |
1998 | Wicomico | 22.021.98 | Bennett Middle | Door Replacement | $ 8,000 | $ 8,240 | $ 8,240 | |
1998 | Wicomico | 22.024.98 | Westside Primary | Domestic water system replacement | Domestic water system replacement | $ 25,000 | $ 25,000 | $ 25,000 |
1998 | Worcester | 23.006.98 | Ocean City Elementary | Complete technology wiring hubs and routers | $ 6,000 | $ 6,000 | $ 6,000 | |
1998 | Worcester | 23.007.98 | Buckingham Elementary | Expand technology wiring hubs and routers | $ 6,000 | $ 6,000 | $ 6,000 | |
1998 | Worcester | 23.008.98 | Snow Hill Elementary | Complete technology wiring hubs and routers | $ 7,000 | $ 7,000 | $ 7,000 | |
1998 | Worcester | 23.011.98 | Pocomoke Middle | Complete technology wiring hubs and routers | $ 6,000 | $ 6,000 | $ 6,000 | |
1998 | Baltimore City | 30.030.98 | #055 Hampden Elementary | Painting | Interior painting | $ 7,000 | $ 7,051 | $ 7,051 |
1998 | Baltimore City | 30.057.98 | #105A Moravia Park Primary School. | Carpet Replacement | Replace carpet | $ 5,300 | $ 5,298 | $ 5,298 |
1998 | Baltimore City | 30.069.98 | #066 Mt. Royal Elementary/Middle | Replace toilet partitions | $ 5,000 | $ 5,157 | $ 5,157 | |
1998 | Baltimore City | 30.085.98 | #226 Violetville Elementary/Middle | Painting | Interior painting | $ 6,000 | $ 5,000 | $ 5,000 |
1998 | Baltimore City | 30.111.98 | #450 Frederick Douglass High | Flooring | Floor replacement | $ 7,000 | $ 6,783 | $ 6,783 |
1998 | Baltimore City | 30.129.98 | #028 William Pinderhughes Elementary | Painting | Interior painting | $ 8,000 | $ 5,500 | $ 5,500 |
1998 | Baltimore City | 30.135.98 | #064 Liberty Elementary | Window Replacement | $ 9,261 | $ 9,261 | $ 9,261 | |
1998 | Baltimore City | 30.165.98 | #056 Robert Poole Middle | Painting | Interior painting | $ 7,000 | $ 6,956 | $ 6,956 |
1998 | Baltimore City | 30.189.98 | #210 Hazelwood Elementary/Middle | Door and frame Replacement | Replace exit doors and frames | $ 6,000 | $ 6,240 | $ 6,240 |
1998 | Baltimore City | 30.224.98 | #050 Abbottson Elementary | Painting | Interior painting | $ 6,000 | $ 6,700 | $ 6,700 |
1998 | Baltimore City | 30.225.98 | #150 Bentalou Elementary | Painting | Paint cafeteria and kitchen | $ 7,000 | $ 5,000 | $ 5,000 |
1998 | Baltimore City | 30.237.98 | #080 West Baltimore Middle | Window replacement | $ 14,900 | $ 14,900 | $ 14,900 | |
1998 | Baltimore City | 30.240.98 | #229 Holabird Elementary | Replace toilet partitions | $ 7,000 | $ 6,460 | $ 6,460 | |
1998 | Baltimore City | 30.242.98 | #029 Matthew A. Henson Elementary | Window replacement | $ 13,851 | $ 13,851 | $ 13,851 | |
1998 | Baltimore City | 30.244.98 | #254 Dr. Martin Luther King, Jr. Elementary | Painting | Interior painting | $ 6,000 | $ 6,540 | $ 6,540 |
1998 | Baltimore City | 30.245.98 | #304 Harbor View School | Painting | Interior painting | $ 9,000 | $ 8,792 | $ 8,792 |
1998 | Kent | 14.007.98 | Kent County High | Roof Replacement | Re-roof a 4,800 sq. ft. section | $ 25,000 | $ 25,000 | $ 25,000 |
1999 | Allegany | 01.022.99 | Cash Valley Elementary | Parking Lot Extension | Build 70 additional parking spaces. | $ 120,700 | $ 120,700 | $ 120,700 |
1999 | Allegany | 01.011.99 | Fort Hill High | Lighting | Replacement of stadium light towers. | $ 130,000 | $ 110,000 | $ 110,000 |
1999 | Allegany | 01.012.99 | Allegany High | ADA Upgrades | Installation of ADA ramp in bus/handicapped drop off area. | $ 130,000 | $ 98,400 | $ 98,400 |
1999 | Allegany | 01.027.99 | Center for Career and Technical Education | Repair Stair Tower | Removal of the concrete beams, supporting posts, and sandblasting or replacement of roof reinforcing steel as necessary. | $ 30,000 | $ 25,900 | $ 25,900 |
1999 | Anne Arundel | 02.103.99 | Lake Shore Elementary | Water Treatment Upgrade | Removal of existing well pump, capacity testing of existing well and redevelopment, if required, to maintain an adequate capacity. Repair or replacement of existing well pump. | $ 180,000 | $ 174,504 | $ 174,504 |
1999 | Anne Arundel | 02.099.99 | South River High | Running Track Repairs | Convert the existing track from a standard track to a metric track; repairs to the subsurface; installation of a new granulate rubber sports surface; improvements to event areas. | $ 128,302 | $ 128,302 | $ 128,302 |
1999 | Anne Arundel | 02.012.99 | Chesapeake High | P.A. System Replacement | $ 95,000 | $ 89,496 | $ 89,496 | |
1999 | Anne Arundel | 02.055.99 | Northeast High | P.A. System Replacement | $ 71,000 | $ 70,489 | $ 70,489 | |
1999 | Anne Arundel | 02.059.99 | Marley Middle | P.A. System Replacement | $ 66,015 | $ 66,015 | $ 66,015 | |
1999 | Anne Arundel | 02.012.99 | Chesapeake High | Flooring | Refinish gym floor | $ 15,000 | $ 12,545 | $ 12,545 |
1999 | Anne Arundel | 02.013.99 | Meade High | Flooring | Refinish gym floor | $ 16,299 | $ 16,299 | $ 16,299 |
1999 | Anne Arundel | 02.068.99 | Southern High | Flooring | Refinish gym floor | $ 15,000 | $ 12,350 | $ 12,350 |
1999 | Baltimore City | 30.017.99 | #027 Commodore John Rodgers Elementary | Carpet Replacement | Replace carpet | $ 90,000 | $ 69,800 | $ 69,800 |
1999 | Baltimore City | 30.193.99 | #248 Sinclair Lane Elementary | Painting | Paint interior/exterior | $ 70,000 | $ 48,150 | $ 48,150 |
1999 | Baltimore City | 30.230.99 | #160 Carter G. Woodson Elementary | Replace storm drains | $ 70,000 | $ 48,837 | $ 48,837 | |
1999 | Baltimore City | 30.016.99 | #023 General Wolfe Elementary | Carpet Replacement | Replace carpet | $ 60,000 | $ 35,900 | $ 35,900 |
1999 | Baltimore City | 30.061.99 | #125 Furman L. Templeton Elementary | Window Replacement | Replace windows | $ 67,946 | $ 67,946 | $ 67,946 |
1999 | Baltimore City | 30.194.99 | #245 Leith Walk Elementary | Painting | Paint exterior surfaces | $ 33,000 | $ 33,000 | $ 33,000 |
1999 | Baltimore City | 30.129.99 | #028 William Pinderhughes Elementary | Painting | Paint interior | $ 32,000 | $ 11,500 | $ 11,500 |
1999 | Baltimore City | 30.205.99 | #219 Yorkwood Elementary | Painting | Paint exterior surfaces | $ 30,000 | $ 11,875 | $ 11,875 |
1999 | Baltimore City | 30.165.99 | #056 Robert Poole Middle | Painting | Paint interior | $ 25,000 | $ 13,500 | $ 13,500 |
1999 | Baltimore City | 30.149.99 | #220 Morrell Park Elementary | Painting | Paint interior | $ 24,000 | $ 17,000 | $ 17,000 |
1999 | Baltimore City | 30.072.99 | #215 Highlandtown Elementary | Painting | Paint interior | $ 23,000 | $ 10,400 | $ 10,400 |
1999 | Baltimore City | 30.148.99 | #241 Fallstaff Middle | VCT Replacement | $ 23,000 | $ 11,076 | $ 11,076 | |
1999 | Baltimore City | 30.280.99 | #038 Malcolm X Primary | Carpet Replacement | Replace carpet | $ 20,000 | $ 13,232 | $ 13,232 |
1999 | Baltimore City | 30.229.99 | #242 Northwood Elementary | Painting | Paint exterior, lounge and lobby | $ 20,000 | $ 11,700 | $ 11,700 |
1999 | Baltimore City | 30.029.99 | #053 Margaret Brent Elementary | Carpet Replacement | Replace carpet | $ 20,000 | $ 14,600 | $ 14,600 |
1999 | Baltimore City | 30.135.99 | #064 Liberty Elementary | Carpet Replacement | Replace carpet | $ 20,000 | $ 13,608 | $ 13,608 |
1999 | Baltimore City | 30.041.99 | #081 North Bend Elementary | Carpet Replacement | Replace carpet | $ 18,000 | $ 11,824 | $ 11,824 |
1999 | Baltimore City | 30.072.99 | #215 Highlandtown Elementary | Carpet Replacement | Replace carpet | $ 18,000 | $ 14,547 | $ 14,547 |
1999 | Baltimore City | 30.257.99 | #251 Callaway Elementary | Carpet Replacement | Replace carpet | $ 18,000 | $ 10,890 | $ 10,890 |
1999 | Baltimore City | 30.064.99 | #134 Walter P. Carter Elementary | Painting | Paint interior | $ 18,000 | $ 14,500 | $ 14,500 |
1999 | Baltimore City | 30.076.99 | #213 Govans Elementary | Painting | Paint exterior | $ 17,000 | $ 13,500 | $ 13,500 |
1999 | Baltimore City | 30.197.99 | #010 James McHenry Elementary | Carpet Replacement | Replace carpet | $ 16,000 | $ 12,998 | $ 12,998 |
1999 | Baltimore City | 30.214.99 | #217 Belmont Elementary | Carpet Replacement | Replace carpet | $ 16,000 | $ 11,300 | $ 11,300 |
1999 | Baltimore City | 30.198.99 | #031 Coldstream Park Elementary | Replace folding wall in gym | $ 15,000 | $ 12,995 | $ 12,995 | |
1999 | Baltimore City | 30.220.99 | #159 Cherry Hill Elementary | Carpet Replacement | Replace carpet | $ 15,000 | $ 11,100 | $ 11,100 |
1999 | Baltimore City | 30.175.99 | #124 Baybrook Elementary | Carpet Replacement | Replace carpet | $ 14,000 | $ 13,897 | $ 13,897 |
1999 | Baltimore City | 30.127.99 | #063 Rosemont Elementary | Replace concrete and ballad | $ 14,000 | $ 12,245 | $ 12,245 | |
1999 | Baltimore City | 30.244.99 | #254 Dr. Martin Luther King. Jr. Elementary | Carpet Replacement | Replace carpet | $ 14,000 | $ 10,650 | $ 10,650 |
1999 | Baltimore City | 30.163.99 | #222 Pimlico Middle | Carpet Replacement | Replace carpet | $ 13,000 | $ 10,800 | $ 10,800 |
1999 | Baltimore City | 30.068.99 | #145 Alexander Hamilton Elementary | Carpet Replacement | Replace carpet | $ 12,000 | $ 10,247 | $ 10,247 |
1999 | Baltimore City | 30.034.99 | #061 John Eager Howard Elementary | Carpet Replacement | Replace carpet | $ 11,000 | $ 10,000 | $ 10,000 |
1999 | Baltimore City | 30.130.99 | #005 Langston Hughes Elementary | Painting | Interior painting | $ 42,000 | $ 34,760 | $ 34,760 |
1999 | Baltimore City | 30.057.99 | #105A Moravia Park Primary | Carpet Replacement | Replace carpet | $ 12,380 | $ 12,380 | $ 12,380 |
1999 | Baltimore County | 03.136.99 | Campfield Early Childhood Center | Boiler Replacement | Replacement of two (2) boilers, hot water tank, three (3) condensate receivers, and associated mechanical equipment. | $ 380,000 | $ 222,701 | $ 222,701 |
1999 | Baltimore County | 03.195.99 | Ridge Ruxton Special Education | Boiler Replacement | Replace boilers | $ 421,000 | $ 421,000 | $ 421,000 |
1999 | Baltimore County | 03.133.99 | Dulaney High | Fire Alarm System Replacement | Replace fire alarm system | $ 210,000 | $ 185,000 | $ 185,000 |
1999 | Baltimore County | 03.155.99 | Norwood Elementary | Parking lot extension | $ 150,000 | $ 36,526 | $ 36,526 | |
1999 | Baltimore County | 03.022.99 | Stoneleigh Elementary | ADA Upgrades | Renovate to make egress to office and multi-purpose room handicapped accessible. | $ 215,200 | $ 215,200 | $ 215,200 |
1999 | Baltimore County | 03.111.99 | Woodmoor Elementary | ATC Replacement | Renovate/replace the ATC control system for the schools heating. | $ 150,000 | $ 87,346 | $ 87,346 |
1999 | Baltimore County | 03.094.99 | Hereford High | Well pumping system | Install a pumping system to deliver water from new wells to the school. | $ 123,396 | $ 117,468 | $ 117,468 |
1999 | Baltimore County | 03.033.99 | Pikesville High | Flooring | Replace gym floor | $ 108,500 | $ 108,500 | $ 108,500 |
1999 | Baltimore County | 03.125.99 | Chadwick Elementary | Restroom expansion | Expansion of one (1) set of restrooms which includes addition of plumbing fixtures. | $ 110,652 | $ 110,652 | $ 110,652 |
1999 | Baltimore County | 03.011.99 | Perry Hall High | Locker Replacement | Replace gym lockers | $ 100,000 | $ 94,300 | $ 94,300 |
1999 | Baltimore County | 03.011.99 | Perry Hall High | Bleacher Replacement | Replace gym bleachers | $ 90,000 | $ 63,528 | $ 63,528 |
1999 | Baltimore County | 03.033.99 | Pikesville High | Door Replacement | Replace exterior doors | $ 82,998 | $ 82,998 | $ 82,998 |
1999 | Baltimore County | 03.149.99 | Lansdowne High | Bleacher Replacement | Replace gym bleachers | $ 80,000 | $ 63,393 | $ 63,393 |
1999 | Baltimore County | 03.050.99 | Woodlawn High | Bleacher Replacement | Replace gym bleachers | $ 80,000 | $ 69,097 | $ 69,097 |
1999 | Baltimore County | 03.165.99 | Overlea High | Door Replacement | Replace auditorium doors | $ 80,000 | $ 24,888 | $ 24,888 |
1999 | Baltimore County | 03.033.99 | Pikesville High | Bleacher Replacement | Replace gym bleachers | $ 75,000 | $ 68,600 | $ 68,600 |
1999 | Baltimore County | 03.178.99 | Fifth District Elementary | Underground tank replacement | $ 75,000 | $ 64,900 | $ 64,900 | |
1999 | Baltimore County | 03.035.99 | Chesapeake Terrace Elementary | Underground Storage Tank Replacement | $ 75,000 | $ 35,069 | $ 35,069 | |
1999 | Baltimore County | 03.160.99 | Arbutus Elementary | Lighting | Upgrade lights | $ 63,200 | $ 63,200 | $ 63,200 |
1999 | Baltimore County | 03.121.99 | Parkville High | Bleacher Replacement | Replace gym bleachers | $ 82,642 | $ 82,642 | $ 82,642 |
1999 | Baltimore County | 03.111.99 | Woodmoor Elementary | Install canopy | $ 59,557 | $ 59,557 | $ 59,557 | |
1999 | Baltimore County | 03.075.99 | Eastern Technical High | Replace intercom/bell/clock | $ 50,000 | $ 38,720 | $ 38,720 | |
1999 | Baltimore County | 03.182.99 | Orems Elementary | Electrical | Replace main electrical service | $ 50,000 | $ 33,745 | $ 33,745 |
1999 | Baltimore County | 03.021.99 | Maiden Choice Special Education | Electrical | Replace main electrical service | $ 50,000 | $ 30,425 | $ 30,425 |
1999 | Baltimore County | 03.041.99 | Dundalk Middle | Replace intercom/clock | $ 40,000 | $ 39,538 | $ 39,538 | |
1999 | Baltimore County | 03.160.99 | Arbutus Elementary | Door Replacement | Replace exterior doors | $ 34,868 | $ 34,868 | $ 34,868 |
1999 | Baltimore County | 03.080.99 | Kingsville Elementary | Door Replacement | Replace exterior doors | $ 59,497 | $ 59,497 | $ 59,497 |
1999 | Baltimore County | 03.101.99 | Edmondson Heights Elementary | Replace intercom/clock | $ 29,479 | $ 29,479 | $ 29,479 | |
1999 | Baltimore County | 03.133.99 | Dulaney High | Lighting | Upgrade gym lights | $ 30,000 | $ 18,594 | $ 18,594 |
1999 | Baltimore County | 03.149.99 | Lansdowne High | Replace exterior steps | $ 25,000 | $ 21,340 | $ 21,340 | |
1999 | Baltimore County | 03.020.99 | Mars Estates Elementary | Lighting | Install exterior lighting | $ 23,000 | $ 12,984 | $ 12,984 |
1999 | Baltimore County | 03.149.99 | Lansdowne High | Door Replacement | Replace exterior gym door | $ 21,225 | $ 21,225 | $ 21,225 |
1999 | Baltimore County | 03.011.99 | Perry Hall High | Flooring | Refinish gym floor | $ 20,000 | $ 16,369 | $ 16,369 |
1999 | Baltimore County | 03.149.99 | Lansdowne High | Flooring | Refinish gym floor | $ 20,000 | $ 19,932 | $ 19,932 |
1999 | Baltimore County | 03.050.99 | Woodlawn High | Flooring | Refinish gym floor | $ 20,000 | $ 18,283 | $ 18,283 |
1999 | Baltimore County | 03.145.99 | Patapsco High | Flooring | Refinish gym floor | $ 20,000 | $ 19,853 | $ 19,853 |
1999 | Baltimore County | 03.033.99 | Pikesville High | Replace Restroom Partitions | Replacement of partitions in four (4) sets of restrooms. | $ 20,000 | $ 15,870 | $ 15,870 |
1999 | Baltimore County | 03.140.99 | Dundalk High | Lighting | Replace gym lighting | $ 20,000 | $ 17,578 | $ 17,578 |
1999 | Baltimore County | 03.104.99 | Hebbville Elementary | Fire Alarm System Replacement | Replace fire alarm system | $ 15,000 | $ 13,037 | $ 13,037 |
1999 | Baltimore County | 03.181.99 | Winand Elementary | Lighting | Install exterior lighting | $ 12,500 | $ 12,500 | $ 12,500 |
1999 | Baltimore County | 03.159.99 | Westowne Elementary | Lighting | Install exterior lighting | $ 12,000 | $ 11,000 | $ 11,000 |
1999 | Calvert | 04.003.99 | Calvert High | Roof Replacement | Replacement of the 4-ply system and the insulation, replacement and/or relocation of roof drains, and replacement of other appurtenances as necessary (approx. 5,000 sf). | $ 26,500 | $ 23,923 | $ 23,923 |
1999 | Calvert | 04.001.99 | Calvert Middle | Window Replacement | Phase IV - Replacement of windows in the administrative area. | $ 14,000 | $ 12,800 | $ 12,800 |
1999 | Calvert | 04.001.99 | Calvert Middle | Window/Door Replacement | Replacement of windows and doors in the cafeteria. | $ 13,500 | $ 11,828 | $ 11,828 |
1999 | Calvert | 04.001.99 | Calvert Middle | Window/Door Replacement | Phase III - Replacement of window and doors on the second floor. | $ 11,200 | $ 11,200 | $ 11,200 |
1999 | Caroline | 05.008.99 | Preston Elementary | Replace heat pipes | $ 43,000 | $ 41,190 | $ 41,190 | |
1999 | Caroline | 05.010.99 | Colonel Richardson Middle | Retube boiler | $ 32,000 | $ 30,384 | $ 30,384 | |
1999 | Caroline | 05.005.99 | Lockerman Middle | Replace boiler coils | $ 10,637 | $ 10,637 | $ 10,637 | |
1999 | Carroll | 06.042.99 | Westminster High | Lighting | Replace stage lighting | $ 95,000 | $ 94,352 | $ 94,352 |
1999 | Carroll | 06.042.99 | Westminster High | Replace folding partition | Replacement of folding partition separating the auditorium balcony from the auditorium. | $ 93,270 | $ 93,270 | $ 93,270 |
1999 | Carroll | 06.042.99 | Westminster High | Fire Alarm System Replacement | Replace fire alarm system | $ 80,000 | $ 76,800 | $ 76,800 |
1999 | Carroll | 06.014.99 | Carrolltowne Elementary | Chiller replacement | $ 80,550 | $ 80,550 | $ 80,550 | |
1999 | Carroll | 06.032.99 | Carroll County Career and Technology Center | Water Heater Replacement | Replacement of electric hot water heater with a more energy efficient gas-fired hot water heater. | $ 25,000 | $ 13,646 | $ 13,646 |
1999 | Carroll | 06.001.99 | North Carroll High | Generator Replacement | Replace generator | $ 23,480 | $ 23,480 | $ 23,480 |
1999 | Cecil | 07.013.99 | Perryville High | Underground Tank Replacement | Replacement of existing tank with a new 12,000 gallon tank. | $ 70,000 | $ 46,270 | $ 46,270 |
1999 | Cecil | 07.015.99 | Chesapeake City Elementary | HVAC/RTU | Replacement of the third roof top unit. | $ 60,000 | $ 59,100 | $ 59,100 |
1999 | Cecil | 07.040.99 | North East High | Underground Tank Replacement | Replacement of UST with a new tank that includes safety and monitoring equipment. | $ 60,000 | $ 44,610 | $ 44,610 |
1999 | Cecil | 07.015.99 | Chesapeake City Elementary | Underground Tank Replacement | Replacement of existing tank with a 10,000 gallon tank. | $ 55,000 | $ 49,335 | $ 49,335 |
1999 | Cecil | 07.016.99 | Gilpin Manor Elementary | Carpet Replacement | Replacement of carpet in 13 rooms and one connecting corridor. | $ 45,000 | $ 45,000 | $ 45,000 |
1999 | Cecil | 07.033.99 | Providence Special Education | Underground Tank Replacement | Replacement of existing tank with a new 2,000 gallon tank. | $ 30,000 | $ 27,324 | $ 27,324 |
1999 | Cecil | 07.039.99 | Cherry Hill Middle | Replace partition | Installation of new panel folding partition used to separate the multi-purpose room, auditorium and stage area. | $ 25,000 | $ 18,360 | $ 18,360 |
1999 | Cecil | 07.028.99 | Cecil County School of Technology | Asphalt | Replacement of asphalt at exterior instructional areas. | $ 80,000 | $ 70,769 | $ 70,769 |
1999 | Charles | 08.001.99 | Dr. James Craik Elementary | P.A. System Replacement | Replace PA system | $ 14,900 | $ 14,900 | $ 14,900 |
1999 | Charles | 08.003.99 | John Hanson Middle | Seating Replacement | Replacement of 95 existing seats in lecture hall. | $ 14,725 | $ 14,725 | $ 14,725 |
1999 | Charles | 08.011.99 | Middleton Elementary | Flooring | Replacement of gym tile flooring. | $ 14,900 | $ 13,559 | $ 13,559 |
1999 | Charles | 08.007.99 | Somers Center | Carpet Replacement | Replacement of carpet in choral room and band room. | $ 11,815 | $ 11,815 | $ 11,815 |
1999 | Charles | 08.013.99 | La Plata High | Ceiling Tile Replacement | Replacement of ceiling tile and grids in ROTC classroom. | $ 14,990 | $ 10,001 | $ 10,001 |
1999 | Dorchester | 09.004.99 | North Dorchester Middle | Carpet Replacement | Replacement of carpet in Pods 1 - 4. | $ 58,600 | $ 55,000 | $ 55,000 |
1999 | Dorchester | 09.009.99 | Cambridge-South Dorchester High | Locker Repair | Repair and refinish locker room lockers. | $ 11,807 | $ 10,000 | $ 10,000 |
1999 | Frederick | 10.022.99 | Urbana Elementary | Painting | Paint interior. | $ 35,000 | $ 35,000 | $ 35,000 |
1999 | Frederick | 10.001.99 | Middletown Elementary | Window Replacement | Replacement of exterior windows. | $ 12,000 | $ 12,000 | $ 12,000 |
1999 | Frederick | 10.004.99 | Lincoln "B" Elementary | Window Replacement | Replacement of exterior windows. | $ 12,000 | $ 12,000 | $ 12,000 |
1999 | Frederick | 10.009.99 | Frederick High | Window Replacement | Replacement of exterior windows. | $ 26,000 | $ 26,000 | $ 26,000 |
1999 | Garrett | 11.006.99 | Broad Ford Elementary | Carpet Replacement | Replace carpet | $ 62,000 | $ 62,000 | $ 62,000 |
1999 | Garrett | 11.009.99 | Northern Middle | Replace water pump | $ 23,000 | $ 23,000 | $ 23,000 | |
1999 | Harford | 12.056.99 | Darlington Elementary | Install air conditioning | $ 160,000 | $ 160,000 | $ 160,000 | |
1999 | Harford | 12.028.99 | Havre de Grace Elementary | HVAC Replacement | Replace HVAC unit | $ 127,318 | $ 127,318 | $ 127,318 |
1999 | Harford | 12.006.99 | Aberdeen Middle | Replace motor control center | $ 50,000 | $ 42,682 | $ 42,682 | |
1999 | Harford | 12.005.99 | Havre de Grace High | Flooring | Replace stage flooring | $ 35,000 | $ 35,000 | $ 35,000 |
1999 | Harford | 12.004.99 | Bel Air High | Flooring | Replace stage flooring | $ 35,000 | $ 35,000 | $ 35,000 |
1999 | Howard | 13.038.99 | Cedar Lane Special Education | Window and Doors Replacement | Replace doors/windows | $ 80,000 | $ 65,000 | $ 65,000 |
1999 | Kent | 14.006.99 | Garnett Elementary | Window Replacement Phase I | Replace windows-Phase I | $ 80,000 | $ 65,000 | $ 65,000 |
1999 | Montgomery | 15.182.99 | John T. Baker Middle | P.A. System Replacement | Replace PA system | $ 45,000 | $ 21,770 | $ 21,770 |
1999 | Montgomery | 15.007.99 | Cold Spring Elementary | Flooring | Replace floor tile | $ 20,000 | $ 16,184 | $ 16,184 |
1999 | Montgomery | 15.105.99 | DuFief Elementary | Cooling Tower Replacement | Replace cooling tower | $ 44,670 | $ 44,670 | $ 44,670 |
1999 | Montgomery | 15.013.99 | Germantown Elementary | Plumbing Fixture Replacement | Replace plumbing fixtures | $ 55,000 | $ 42,499 | $ 42,499 |
1999 | Montgomery | 15.034.99 | Kensington Parkwood Elementary | Cooling Tower Replacement | Replace cooling tower | $ 38,230 | $ 38,230 | $ 38,230 |
1999 | Montgomery | 15.118.99 | Emory Grove Center | P.A. System Replacement | Replace PA system | $ 20,000 | $ 17,849 | $ 17,849 |
1999 | Montgomery | 15.211.99 | Paint Branch High | Door Replacement | Replace exterior doors | $ 17,000 | $ 16,600 | $ 16,600 |
1999 | Montgomery | 15.238.99 | Redland Middle | Door Replacement | Replace exterior doors | $ 62,000 | $ 61,840 | $ 61,840 |
1999 | Montgomery | 15.247.99 | Watkins Mill Elementary | Window Replacement | Replace windows | $ 40,000 | $ 40,000 | $ 39,920 |
1999 | Montgomery | 15.023.99 | Thomas S. Wootton High | P.A. System Replacement | Replace PA system | $ 60,000 | $ 25,638 | $ 25,638 |
1999 | Montgomery | 15.040.99 | Fallsmead Elementary | Painting | Paint interior | $ 23,000 | $ 16,950 | $ 16,950 |
1999 | Montgomery | 15.193.99 | Cashell Elementary | Painting | Paint interior | $ 33,000 | $ 14,445 | $ 14,445 |
1999 | Montgomery | 15.238.99 | Redland Middle | Painting | Paint interior | $ 68,000 | $ 23,900 | $ 23,900 |
1999 | Montgomery | 15.247.99 | Watkins Mill Elementary | Painting | Paint interior | $ 23,000 | $ 17,445 | $ 17,445 |
1999 | Montgomery | 15.061.99 | Weller Road Elementary | Painting | Paint interior | $ 23,000 | $ 16,300 | $ 16,300 |
1999 | Montgomery | 15.021.99 | Belmont Elementary | Painting | Paint interior and exterior | $ 33,000 | $ 26,375 | $ 26,375 |
1999 | Montgomery | 15.054.99 | Glenallan Elementary | Painting | Paint interior and exterior | $ 33,000 | $ 28,800 | $ 28,800 |
1999 | Montgomery | 15.192.99 | Greenwood Elementary | Painting | Paint interior and exterior | $ 33,000 | $ 25,154 | $ 25,154 |
1999 | Montgomery | 15.212.99 | Parkland Middle | Painting | Paint interior and exterior | $ 73,000 | $ 42,750 | $ 42,750 |
1999 | Montgomery | 15.249.99 | Piney Branch Elementary | Painting | Paint interior and exterior | $ 70,000 | $ 25,880 | $ 25,880 |
1999 | Montgomery | 15.051.99 | Darnestown Elementary | Painting | Paint interior and exterior | $ 38,100 | $ 38,100 | $ 38,100 |
1999 | Montgomery | 15.086.99 | Southlake Elementary | Painting | Paint interior and exterior | $ 33,000 | $ 29,800 | $ 29,800 |
1999 | Montgomery | 15.146.99 | Washington Grove Elementary | Painting | Paint interior and exterior | $ 34,905 | $ 34,905 | $ 34,905 |
1999 | Montgomery | 15.253.99 | Seven Locks Elementary | Window and Doors Replacement | Replace windows and doors | $ 105,914 | $ 105,914 | $ 105,914 |
1999 | Montgomery | 15.125.99 | Tilden Middle | P.A. System Replacement | Replace PA system | $ 40,000 | $ 40,000 | $ 21,613 |
1999 | Montgomery | 15.033.99 | Wayside Elementary | Door Replacement | Replace exterior doors | $ 77,116 | $ 77,116 | $ 77,116 |
1999 | Montgomery | 15.182.99 | John T. Baker Middle | Replace partition | $ 50,000 | $ 50,000 | $ 45,112 | |
1999 | Montgomery | 15.051.99 | Darnestown Elementary | P.A. System Replacement | Replace PA system | $ 30,000 | $ 30,000 | $ 15,673 |
1999 | Montgomery | 15.130.99 | Gaithersburg High | Door Replacement | Replace interior doors | $ 46,311 | $ 46,311 | $ 46,311 |
1999 | Montgomery | 15.046.99 | Northwood High | P.A. System Replacement | Replace PA system | $ 40,000 | $ 40,000 | $ 25,780 |
1999 | Montgomery | 15.210.99 | Tilden Center | P.A. System Replacement | Replace PA system | $ 40,000 | $ 40,000 | $ 19,551 |
1999 | Montgomery | 15.125.99 | Tilden Middle | Door Replacement | Replace exterior doors | $ 44,118 | $ 44,118 | $ 44,118 |
1999 | Montgomery | 15.042.99 | Ridgeview Middle | Painting | Paint interior | $ 48,000 | $ 48,000 | $ 37,800 |
1999 | Montgomery | 15.182.99 | John T. Baker Middle | Painting | Paint interior | $ 49,000 | $ 49,000 | $ 34,965 |
1999 | Prince George's | 16.204.99 | Parkdale High | Chiller Replacement | Replace chiller | $ 297,450 | $ 297,450 | $ 297,450 |
1999 | Prince George's | 16.203.99 | Gaywood Elementary | Boiler Replacement | Replace boiler | $ 258,887 | $ 257,887 | $ 257,887 |
1999 | Prince George's | 16.048.99 | Flintstone Elementary | Boiler Replacement | Replace boiler | $ 150,000 | $ 150,000 | $ 150,000 |
1999 | Prince George's | 16.202.99 | Glenn Dale Elementary | Boiler Replacement | Replace boiler | $ 140,000 | $ 140,000 | $ 140,000 |
1999 | Prince George's | 16.014.99 | Laurel High | Painting | Paint interior | $ 90,000 | $ 55,785 | $ 55,785 |
1999 | Prince George's | 16.079.99 | Riverdale Elementary | Painting | Paint interior | $ 26,000 | $ 18,320 | $ 18,320 |
1999 | Prince George's | 16.154.99 | James McHenry Elementary | Painting | Paint interior | $ 21,000 | $ 17,850 | $ 17,850 |
1999 | Prince George's | 16.132.99 | Heather Hills Elementary | Painting | Paint interior | $ 17,500 | $ 15,500 | $ 15,500 |
1999 | Prince George's | 16.056.99 | Capitol Heights Elementary | Painting | Paint interior | $ 17,208 | $ 17,208 | $ 17,208 |
1999 | Queen Anne's | 17.002.99 | Sudlersville Middle | Install control system | $ 85,000 | $ 85,000 | $ 85,000 | |
1999 | St. Mary's | 18.022.99 | Green Holly Elementary | Fire Alarm Upgrade | Fire alarm upgrade | $ 50,000 | $ 35,000 | $ 35,000 |
1999 | St. Mary's | 18.001.99 | Leonardtown Middle | Replace plumbing-hot water | $ 10,500 | $ 10,500 | $ 10,500 | |
1999 | St. Mary's | 18.002.99 | Spring Ridge Middle | Replace plumbing-hot water | $ 10,500 | $ 10,500 | $ 10,500 | |
1999 | St. Mary's | 18.002.99 | Spring Ridge Middle | Electrical Upgrade | $ 18,000 | $ 17,100 | $ 17,100 | |
1999 | St. Mary's | 18.001.99 | Leonardtown Middle | HVAC Replacement | Replace HVAC unit (not complete) | $ 11,000 | $ 3,463 | $ 3,463 |
1999 | Somerset | 19.012.99 | Marion Sarah Peyton School | Repaving parking lot and driveway | $ 24,500 | $ 24,500 | $ 24,500 | |
1999 | Somerset | 19.015.99 | H. Dewayne Whittington Elementary | Repaving parking lot and driveway | $ 17,500 | $ 17,500 | $ 17,500 | |
1999 | Somerset | 19.002.99 | Washington High | Repaving parking lot and driveway | $ 24,800 | $ 24,800 | $ 24,800 | |
1999 | Talbot | 20.002.99 | Easton High | Renovate track | $ 189,000 | $ 155,000 | $ 155,000 | |
1999 | Washington | 21.026.99 | Smithsburg High | Cooling Tower Replacement | Replace cooling tower | $ 35,000 | $ 28,499 | $ 28,499 |
1999 | Washington | 21.043.99 | Fountain Rock Elementary | Flooring | Replace tile | $ 60,172 | $ 54,453 | $ 54,453 |
1999 | Washington | 21.004.99 | Hickory Elementary | Carpet Replacement | Replace carpet | $ 63,660 | $ 63,660 | $ 63,660 |
1999 | Washington | 21.003.99 | Western Heights Middle | Lighting System | Upgrade lighting system | $ 53,388 | $ 53,388 | $ 53,388 |
1999 | Wicomico | 22.029.99 | West Salisbury Elementary | Renovate water system | $ 121,400 | $ 121,400 | $ 121,400 | |
1999 | Wicomico | 22.018.99 | Mardela Middle/High | Locker Replacement | Replace lockers | $ 70,000 | $ 41,945 | $ 41,945 |
1999 | Wicomico | 22.008.99 | James. M. Bennett High | Locker Replacement | Replace gym lockers | $ 50,000 | $ 50,000 | $ 50,000 |
1999 | Wicomico | 22.021.99 | Bennett Middle | Window Replacement | Replace gym windows | $ 55,000 | $ 44,750 | $ 44,750 |
1999 | Wicomico | 22.024.99 | Westside Primary | Repair mechanical system | $ 42,237 | $ 42,237 | $ 42,237 | |
1999 | Wicomico | 22.021.99 | Bennett Middle | Bleachers | Repair and upgrade bleachers | $ 32,000 | $ 32,000 | $ 32,000 |
1999 | Wicomico | 22.003.99 | East Salisbury Elementary | HVAC Replacement | Replace HVAC unit | $ 18,000 | $ 13,518 | $ 13,518 |
1999 | Wicomico | 22.008.99 | James. M. Bennett High | Flooring | Refinish floor | $ 25,000 | $ 14,400 | $ 14,400 |
1999 | Worcester | 23.011.99 | Pocomoke Middle | Boys/girls locker room ductwork repair | $ 14,900 | $ 10,294 | $ 10,294 | |
1999 | Worcester | 23.012.99 | Berlin Intermediate | Boys/girls locker room ductwork repair | $ 14,900 | $ 14,900 | $ 14,900 | |
1999 | Worcester | 23.006.99 | Ocean City Elementary | Replace water pipes | $ 11,300 | $ 11,300 | $ 11,300 | |
1999 | Worcester | 23.009.99 | Snow Hill Middle | Replace HVAC duct | $ 14,800 | $ 14,800 | $ 14,800 | |
1999 | Worcester | 23.009.99 | Snow Hill Middle | Resilient tile floor | $ 13,706 | $ 13,706 | $ 13,706 | |
1999 | Baltimore City | 30.211.99 | #089 Rognell Heights Elementary/Middle | VCT replacement | $ 11,476 | $ 11,476 | $ 11,476 | |
1999 | Baltimore City | 30.208.99 | #004 Steuart Hill Elementary | Carpet Replacement | Replace carpet | $ 38,292 | $ 38,292 | $ 38,292 |
1999 | Baltimore City | 30.228.99 | #180 Southside Academy | Flooring | Carpet replacement | $ 18,815 | $ 18,815 | $ 18,815 |
1999 | Baltimore City | 30.209.99 | #093 Northern Parkway Middle | Carpet Replacement | Replace carpet | $ 10,189 | $ 10,189 | $ 10,189 |
1999 | Baltimore City | 30.209.99 | #093 Northern Parkway Middle | Carpet Replacement | Replace carpet | $ 14,081 | $ 14,081 | $ 14,081 |
1999 | Baltimore City | 30.185.99 | #403 Baltimore Polytechnic Institute High | Plumbing | $ 20,504 | $ 20,504 | $ 20,504 | |
1999 | Baltimore City | 30.164.99 | #405 Patterson High | Plumbing | $ 26,425 | $ 26,425 | $ 26,425 | |
1999 | Baltimore City | 30.270.99 | #085 Washington Elementary | Plumbing | $ 12,350 | $ 12,350 | $ 12,350 | |
1999 | Baltimore City | 30.164.99 | #405 Patterson High | Plumbing | $ 18,239 | $ 18,239 | $ 18,239 | |
1999 | Baltimore City | 30.019.99 | #036 Harford Heights Elementary | Boiler Repairs | $ 14,101 | $ 14,101 | $ 14,101 | |
1999 | Baltimore City | 30.196.99 | #205 Woodhome Elementary | Boiler repairs | $ 14,881 | $ 14,881 | $ 14,881 | |
1999 | Baltimore City | 30.248.99 | #207 Curtis Bay Elementary | Boiler Repairs | $ 12,435 | $ 12,435 | $ 12,435 | |
1999 | Baltimore City | 30.099.99 | #239 Benjamin Franklin Middle | Boiler repairs | $ 11,693 | $ 11,693 | $ 11,693 | |
1999 | Baltimore City | 30.148.99 | #241 Fallstaff Middle | Boiler repairs | $ 21,676 | $ 21,676 | $ 21,676 | |
1999 | Baltimore City | 30.185.99 | #403 Baltimore Polytechnic Institute High | Boiler Repairs | $ 11,482 | $ 11,482 | $ 11,482 | |
1999 | Baltimore City | 30.142.99 | #457 Laurence G. Paquin Middle/High | Boiler repairs | $ 13,066 | $ 13,066 | $ 13,066 | |
1999 | Baltimore City | 30.164.99 | #405 Patterson High | Boiler Repairs | $ 11,254 | $ 11,254 | $ 11,254 | |
1999 | Baltimore City | 30.019.99 | #036 Harford Heights Elementary | Temp controls | $ 13,596 | $ 13,596 | $ 13,596 | |
1999 | Baltimore City | 30.082.99 | #225 Westport Elementary | Temp controls | $ 18,286 | $ 18,286 | $ 18,286 | |
1999 | Baltimore City | 30.185.99 | #403 Baltimore Polytechnic Institute High | Temp controls | $ 10,975 | $ 10,975 | $ 10,975 | |
1999 | Baltimore City | 30.146.99 | #070 Southern High | Temp controls | $ 11,335 | $ 11,335 | $ 11,335 | |
1999 | Baltimore City | 30.204.99 | #250 Dr. Bernard E. Harris Sr., Elementary | Temp controls | $ 12,453 | $ 12,453 | $ 12,453 | |
1999 | Baltimore City | 30.181.99 | #076 Francis Scott Key Elementary | Chiller repairs | $ 14,022 | $ 14,022 | $ 14,022 | |
1999 | Baltimore City | 30.149.99 | #220 Morrell Park Elementary | Roofing | $ 24,774 | $ 24,774 | $ 24,774 | |
1999 | Baltimore City | 30.137.99 | #409 North East Middle | Generator | $ 11,800 | $ 11,800 | $ 11,800 | |
1999 | Baltimore City | 30.173.99 | #209 Winston Middle | Inverter | $ 16,500 | $ 16,500 | $ 16,500 | |
1999 | Baltimore City | 30.017.99 | #027 Commodore John Rodgers Elementary | Chiller repairs | $ 23,191 | $ 23,191 | $ 23,191 | |
1999 | Baltimore City | 30.167.99 | #406 Forest Park High | Lighting | $ 51,606 | $ 51,606 | $ 51,606 | |
1999 | Baltimore City | 30.113.99 | #454 Carver Vocational Technical Center | Lighting | $ 93,776 | $ 93,776 | $ 93,776 | |
1999 | Baltimore City | 30.021.99 | #041 Hamilton Middle | Lighting | $ 44,388 | $ 44,388 | $ 44,388 | |
1999 | Baltimore City | 30.041.99 | #081 North Bend Elementary | Structural repairs | $ 23,844 | $ 23,844 | $ 23,844 | |
1999 | Baltimore City | 30.211.99 | #089 Rognell Heights Elementary/Middle | Structural repairs | $ 23,844 | $ 23,844 | $ 23,844 | |
1999 | Baltimore City | 30.268.99 | #221 Mt. Washington Elementary | Structural repairs | $ 23,844 | $ 23,844 | $ 23,844 | |
1999 | Baltimore City | 30.128.99 | #414 Paul Laurence Dunbar High | Electrical | $ 10,804 | $ 10,804 | $ 10,804 | |
1999 | Baltimore City | 30.214.99 | #217 Belmont Elementary | Structural repairs | $ 12,757 | $ 12,757 | $ 12,757 | |
1999 | Baltimore City | 30.209.99 | #093 Northern Parkway Middle | Lighting | $ 13,250 | $ 13,250 | $ 13,250 | |
1999 | Baltimore City | 30.209.99 | #093 Northern Parkway Middle | Electrical | $ 13,823 | $ 13,823 | $ 13,823 | |
1999 | Baltimore City | 30.246.99 | #400A Edmondson-Westside High | Renovation | $ 13,870 | $ 13,870 | $ 13,870 | |
1999 | Baltimore City | 30.198.99 | #031 Coldstream Park Elementary | Flooring | Carpet replacement | $ 11,149 | $ 11,149 | $ 11,149 |
1999 | Baltimore City | 30.149.99 | #220 Morrell Park Elementary | Carpet Replacement | $ 14,500 | $ 14,500 | $ 14,500 | |
1999 | Baltimore City | 30.163.99 | #222 Pimlico Middle | Carpet Replacement | Replace carport | $ 13,278 | $ 13,278 | $ 13,278 |
1999 | Baltimore City | 30.148.99 | #241 Fallstaff Middle | VCT Replacement | $ 22,817 | $ 22,817 | $ 22,817 | |
1999 | Baltimore City | 30.188.99 | #411 Walbrook High | Chiller repairs | $ 11,485 | $ 11,485 | $ 11,485 | |
FundingYear | County Name | PSC Number | School Name | Project Scope | Project Description | Total Estimated Project Cost | ASP Request | State ASP Approved |